5
Shared Docs
5
Same-Page
5 / 5
Mentions
ity of Systems—Thermal Comfort 373 Credit 7.1 Thermal Comfort—Design 379 Credit 7.2 Thermal Comfort—Verification 387 Credit 8.1 Daylight and Views— Daylight 393 Credit 8.2 Daylight and Views—Views for Seated Spaces 407 Innovation in Design (ID) 415 Credit 1 Innovation in Design 417 Cre
er of certification. 2009 EDITION LEED REFERENCE GUIDE FOR GREEN INTERIOR DESIGN AND CONSTRUCTION xvii EFTA00281534 VI. CERTIFICATION STRATEGY Timeline and Project Design Phases Project teams should study the principles and objectives of LEED as early in the site selection and design process as pos
■ EA Credit 1.2: Optimize Energy Performance—Lighting Controls ■ IEQ Credit 6.2: Controllability of Systems—Lighting ■ IEQ Credit 8.2: Daylight and Views—Daylight Commissioning is required to ensure that lighting controls meet the design intent and are operating properly, as detailed in the following
le buses will be used to meet the requirements, they must connect to public transportation and operate during the most frequent commuting hours. 5. Timeline and Team The project team should make proximity to public transportation a criterion for site selection. Real estate brokers and leasing agents can
door Chemical and Pollutant Source Control • IEQ Credit 6: Controllability of Systems ■ IEQ Credit 7: Thermal Comfort ■ IEQ Credit 8: Daylight and Views 3. Summary of Referenced Standards There are no standards referenced for this credit 4. Implementation The credit requirements are satisfied when
tors -28 - 85% Printers -9 - 32% PCs 5 - 35% Hosni, Jones, and X, 1999 Facsimile Machine 20 — 45% Network Server 50% Monitor 15 — 36% 5. Timeline and Team The office manager and project owner should institute a purchasing policy that specifies ENERGY STAR-qualified equipment and appliances.
Controllability of Systems—Lighting Controllability of Systems—Thermal Comfort Thermal Comfort—Design Thermal Comfort—Verification Daylight and Views—Daylight Daylight and Views—Views for Seated Spaces IEQ OVERVIEW LEED REFERENCE GUIDE FOR GREEN INTERIOR DESIGN AND CONSTRUCTION 279 EFTA0028181
or both mechanical and natural ventilation). Project teams can use any acceptable engineering calculation methodology to demonstrate compliance. 5. Timeline and Team Early in the design process, the architect and mechanical engineer teams determine and design the most appropriate ventilation system for
s likely to provide greater daylight access to the building interior. The following credit has related requirements: ■ IEQ Credit 8.1: Daylight and Views—Daylight 75% of Spaces Vision glazing has a direct correlation to lighting design energy conservation strategies. The interior lighting systems des
e than in mechanicallyconditioned buildings,where systems are often designed to maintain consistent conditions through all periods of occupancy. 5. Timeline and Team The project owner and design team need to work together to achieve this credit, but responsibility for meeting the requirements and ensuri
Entities connected to both Views and Timeline

Jeffrey Epstein
PERSONLeon Black
PERSON
Ghislaine Maxwell
PERSON
Julie K. Brown
PERSON
Samantha Power
PERSONPark Row
LOCATION
Donald Trump
PERSON
United States
LOCATION
Les Wexner
PERSON
Virginia Giuffre
PERSON
George W. Bush
PERSON
Joe Biden
PERSON
South
LOCATION
New York
LOCATIONCommercial Interiors Rating System
ORGANIZATION
Lawrence Krauss
PERSONLEED-Online
ORGANIZATION
Earth
LOCATIONProject Tools
ORGANIZATION
Washington D.C.
LOCATION