[email protected], Cc: Subject: Fiber project update Date: Sat, 28 Nov 2015 02:06:54 +0000 Good evening Everyone, Omar confirmed that Choice (Hector) will be on LSJ on Monday (11/30/15) morning to complete their side of project. Hector will do the following: I. Install ViNGN via the new router.
wave connection and add some switches to be able to monitor the link and take over the maintenance. Once this is complete; 3. He will reconnect the Dragonwave as the secondary link 4. Lastly, he will test the failover to Secondary. The above steps have a one to two minute downtime. VINGN will not need to
ully functional. Choice made the minor repairs and reinstalled the radio and the Choice internet link is restored. Allister, who works closely with Hector recommends 1 or 2 spare dragonwaves to be on standby. FYI: In addition, I continued to investigate the repair policy with Chris from FutureTech (ou
gh"' Subject: Update: Internet link Date: Mon, 01 Aug 2016 19:09:57 +0000 Embedded: unnamed Good day all Choice was able to remove and repair the Dragonwave radio at the Bovoni tower. The damage was minor and the important components were intact and fully functional. Choice made the minor repairs and rei
ully =unctional. Choice made the minor repairs and reinstalled the radio =nd the Choice =nternet link is restored. Allister, who =orks closely with Hector recommends 1 or 2 spare =ragonwaves to be on standby. FYI: In addition, I continued to investigate the repair policy with Chris from FutureTech (ou
gh' Subject: Update: Internet link Attachments: Untitled attachment 00199.eml (633 bytes) Good day =11 Choice was able =o remove and =epair the Dragonwave radio at the Bovoni =ower. The damage was minor and the =mportant components were intact and fully =unctional. Choice made the minor repairs and rei
PM To: Richard Kahn Subject: Re: GS) Internet quanset hut . perfect On Thu, Feb 4, 2016 at 2:45 PM, Richar= Kahn wrote: Anna and I spoke wi=h Hector (who is very smart and a pleasure as compared to Terrence or Jerm=ine) from Choice He explained that we can purchase a ne= Dragonwave radio and reg
crew said they would attempt to get to =SJ and GSJ by Wednesday or Thursday or next week... </r-iv> Please advise if you know where you would like Dragonwave installe= on GSJ? Richard Kahn HBRK Associates Inc. Begin forwarded message: <=iy style="margin-top:0px;margin-right:0px;margin-bottom:0px;margin
From: Richard Kahn Sent: Thursday, February 4, 2016 7:45 PM To: Jeffrey Epstein Subject: GSJ Internet Anna and I spoke with Hector (who is very smart and a =leasure as compared to from Choice He explained that we can =urchase a new Dragonwave radio and register it on same FCC l
t: GSJ Internet Anna and I spoke with Hector (who is very smart and a =leasure as compared to from Choice He explained that we can =urchase a new Dragonwave radio and register it on same FCC licensed =ink we have for LSJ That radio will receive signal =rom LSJ tower and existing LSJ controller would be u
To: Richard Kahn Subject: Re: G51 Internet quanset hut . perfect On Thu, Feb 4, 2016 at 2:45 PM, Richar= Kahn ‹ » wrote: Anna and I spoke wi=h Hector (who is very smart and a pleasure as compared to Terrence or Jerm=ine) from Choice He explained that we can purchase a ne= Dragonwave radio and reg
crew said they would attempt to get to =SJ and GSJ by Wednesday or Thursday or next week... </r-iv> Please advise if you know where you would like Dragonwave installe= on GSJ? Richard Kahn HBRK Associates Inc. New York, NY 10022 Begin forwarded message: <=iv style="margin-top:0px;margin-right:0px;marg
name got changed from Choice and Terrence took over. I want to verify that the Dragonwave id configured correctly based on the final coordination. Hector. From: Cecile de Jorigh Sent: Tuesday, December 08, 2015 17:44 To: Hector Cintron Cc: lermene Ruan; Omar Welch; Subject: Re: fiber project Emai
h. I believe the two main issues that were affecting the service was the network loop (this is fixed) and the outages when it rains is the Dug on the Dragonwave (pending fixing). Right now a long as it doesn't rain the radio will stay up and service should be allot more stable. From: Cecile de Jongh (madal
bject: Fwd: fiber project Hector Cintrcn (mail received from outside of the ATN domain. Use caution before using links/attachments. Good day all, Hector was able to complete the following: dear up the network loop that was causing bottle in data follow install the switches to monitor the dragonwaves
down the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete • Reconnect the Dragonwave as secondary link • Test (allover to Secondary (OW). The above plan has a 1-2 min downtime. If Mal is not ready I can still do the install but I
016 22:03:05 +0000 Inline-Images: image001.png quanset but . perfect On Thu, Feb 4, 2016 at 2:45 PM, Richard Kahn < wrote: Anna and I spoke with Hector (who is very smart and a pleasure as compared to Terrence or Jermaine) from Choice He explained that we can purchase a new Dragonwave radio and reg
and I spoke with Hector (who is very smart and a pleasure as compared to Terrence or Jermaine) from Choice He explained that we can purchase a new Dragonwave radio and register it on same FCC licensed link we have for LSJ That radio will receive signal from LSJ tower and existing LSJ controller would be
Entities connected to both Hector and Dragonwave

Jeffrey Epstein
PERSONJermaine Ruan
PERSON
Richard Kahn
PERSONCecile de Jongh
PERSON
Marc Rich
PERSONTerrence Rabsatt
PERSON
Alan Dershowitz
PERSONFutureTech
ORGANIZATIONLexington
LOCATIONRodriquez Ann
PERSON
St James
LOCATIONCabrita
PERSONBovoni
PERSONHecto=
PERSONHector Cin
PERSONAllister
PERSONJongh Cecile
PERSONONTARIO CANADA
ORGANIZATIONGLC-SX-MM
ORGANIZATIONCisco 3560
ORGANIZATION