From: Ann Rodriquez elEMMIN > To: "jeffrey E." <[email protected]> Subject: Fwd: fiber project Date: Thu, 10 Dec 2015 15:27:07 +0000 Ann R. Begin forwarded message: From: Ann Rodriquez •e lMil > Date: December 10, 2015 at 11:26:24 AM AST To: Hector Cintron Cc: Cecile de Jongh Subject: Re: fiber project Jermaine Ruan Hi everyone, The Internet is down on LSJ. Please advise or assist'? Ann R. On Dec 9, 2015, at 3:24 PM, Hector Cintron wrote: NI Everyone. , Omar Welch •ea, c la> Does anyone have a copy of the final Data Path Sheet Coordination file (PCN - Dragonwave License File)? I was speaking with Allan and we only have the draft version before the name got changed from Choice and Terrence took over. I want to verify that the Dragonwave id configured correctly based on the final coordination. Hector. From: Cecile de Jorigh Sent: Tuesday, December 08, 2015 17:44 To: Hector Cintron Cc: lermene Ruan; Omar Welch; Subject: Re: fiber project Email received from outside of the ATN domain. Use caution before using links/attachments. Hector, Would you like us to order the cable that VINGN needs? Perhaps we can get it faster. On Dec 8,2015, at 5:11 PM, Hector Cintron •:i s wrote: Good Afternoon Cecile, Thursday or Friday is fine, no rush. I believe the two main issues that were affecting the service was the network loop (this is fixed) and the outages when it rains is the Dug on the Dragonwave (pending fixing). Right now a long as it doesn't rain the radio will stay up and service should be allot more stable. From: Cecile de Jongh (madal Sent: Monday, December O7, 2015 21:12 To: Hector Cintran Cc: lermame Ruan; Omar Welch; Subject: Re: fiber project email received I rem outside of the ATN domain. Use caution before using links/attachments. Good evening Hector, Mulleine will be out of the office for a few days. Perhaps we can schedule the non priority items on Thursday. I see that you are still waiting for the cable that VINGN needs to do the crossover so that answers my question about whether they will be going to the Cabrita site tomorrow. I'll let Anna answer you re the service the last few days since she is M a better position to tell the difference. Thank you for the update and report. Cecile On Dec 7,2015, at 8:18 PM, Hector Cintron •r s wrote: Hi Everyone. Attached is a preliminary detail report, beside the 2 drops (Sun and Today due to the rain) how is the service after the changes? EFTA00631112
Pending Items NON priority: • Move both rockus radios from the netgear to the Osco 3560 (by installing PoE power supply) • Interconnect Choice 3650 and LSJ 3560 at the gym (this is to be able to have connectivity to the AP that covers S Palms) Pending Items Priority • ViNgN connectivity (awaiting cable for cross connect) Jermaine, Let me know when we can schedule the non panty items, no rush QTY part desc BOM Installed I Location arrifyed Responsibility 1 OSCO2921/K9 Cisco Router Data Room Installed Cnoice 1 GLC43X-0 VINGN Simplex Single Mode Module In the cisco router Data Room Installed LSJ 1 VINGN Simplex Cable 35' ST to LC Between Cisco Router and Patch Panel (coming from SIT) Data Room Installed LSJ 1 HWIC-1GE-SFP WIC Card for SEP Cisco Router Data Room Installed LSJ 1 MM Duplex fiber cable 6' SC to LC Between Cisco Router and Patch Panel Data Room Installed LSJ 1 GLC-SX-MM MM Fiber Module Cisco Router Data Room Installed Choice 1 GLC-SX-MM MM Fiber Module Cisco 3560 Building-Gym Installed Choice 1 MM Duplex fiber cable 6' SC to LC Between Osco 3560 and patch Panel Building-Gym Installed LSJ 0 rackmount screws for Cisco 3560 Building-Gym Installed LSJ 1 356OG-24 Cisco 3560 Building-Gym Installed Choice 1 3560G-24 Osco 3560 Outside Cabinet Installed Choice 0 rackmount screws for Cisco 3560 Could use existing from netgear Outside Cabinet Installed LSJ 1 Simplex fiber cable for cross connect at Vesuup Pole Due in Thursday Choice Other Pending Items/Work Cross Connect STT Beach After cable arrival VINGN Router Config Info X LSJ Dragonwave Warrantee Info ?? Dragonwave Survey Includes Signal, Firmware, Hardware, Monitoring, Grounding Choice From: Hector Orton Sent: Friday, December 04, 2015 18:00 To: ilermame Roan' Omar Welch' Cc: Subject: RE: titer project Hi Everyone: I'll send a full detail report in a few days. So far here is a brief description. • The Ruckus AP that is setup to cover the southside of the island that is installed on the tower where the Dragonwave is not working. • There was a network loop between the dragonwave and the netgear causing packet drops and unstable network. • • fixed • Install two switches (Outside shelter, Gym) to be able to monitor both the Dragonwave and Ruckus bodge • Took out the apple router that was working as DHCP and NAT. • Brought the Cisco 2921 router online. Now this is the main DHCP and NAT router • Installed the fiber cable and module for the VINGN connection. This was installed in Port S on the fiver cable that goes to Vessum • I re.enable the dragonwave management ports so I can verify the configuration • I changed the password of both radios (the default password was configured Jermaine I'll get you the new password so you can file them) • I added some of basic monitonng. For the dragonwave (I would be able to add full monitoring until I reconfigure the units) • I added monitoring to the Cisco router and the switch in the shelter We did some testing before we left with youtube and Apple7V and all were working without buffering. The Dragonwave will have to be taken offline once the VINGN circuit goes online. The software on the unit is old and it has some bugs that wd cause issues once the units are up for about 1-2 months. The connection will drop until the unit is rebooted. Another bug is this error: Notice:Dec 0121:55:01 C1N14DGM0075 alarm)544789.1J: Critical: Crypto configuration mismatch peer Alarm cleared Notice:Dec 0121:55:01 C1N14DGM0075 alarm)544789.1J: Critical: Crypto configuration mismatch peer Alarm raised EFTA00631113