10
Shared Docs
10
Same-Page
10 / 10
Mentions
n taken. Im working on new RO proposal from TSG, will forward options once received. This will determine load requirements for new Genset, regards Brice On Fri, May 5, 2017 at 10:39 PM, jeffrey E. [email protected]> wrote: -------- Forwarded message From: Hugo Hodge <I Date: Sat, May 6, 2017
to GSJ, instead of the present direction of laying a completely new power supply from STT? Permitting issues will need to reviewed at same time, an Electrical engineer should be engaged to do a Feasibility study. Short term solution for GSJ Purchase a larger Genset and RO (10K to 15K GPD), that will cover
5 7 .k.k4Ac- 1 Total S93,633.75 EFTA00804953 Bluewater Construction. Inc 6501 Red Hook Plaza 4201 St Thomas, VI, 00802 Name/Address IS(VGSG Brice (lord= Estimate Date Estimate 2 4/4'2017 5S Project O-25 Quonset hut Description Qty Rate i Total Concrete work labor and animal. Includ
TBA LSJ Clearing Cost TBA GSJ GSJ Q Hut 45 $ 93,663.75 4-5 Weeks 5 Guys GSJ Q Hut 25 $ 52,710.00 4 Weeks, 5 Guys GSJ Clear Site TM Doors, Electrical, HVAC TBA GSJ SC Kitchen-Bath $ 18,361.20 2 Weeks, 2 Guys EFTA00804948 Bluewater Construction, Inc 6501 Red Hook Plaza #201 St Thomas, VI, 0
t VR to rimco 11-27 due back 11-30, install then testing (2 Hours) 83 84 Engineering Building 85 Demo I Construct new Building tbd Design tbd Brice reached out to John Woods with comments, no response yet (10/10) 86 87 Pebble Beach 88 Fishermans Hut tbd Design TBD Redig Footing and Start
Mite Pending 157 LSJ Tiki Kitchen Remodel Electric/Plumbing Mite Ongoing 158 Blue Beach Transformer Replacement Mike Mike to Oulsource 159 Electrical and Data to 5 Palms Mike Charles Electric to Price 160 Electrical Conduit Work al Tower Mike Ongoing 161 Solar System and Electric Pebble Bea
Steel shed have estimate for building, budget to be forwarded 31 Jan 11. Triangle, commenced work 12. Entry tree lights, confirmed ground lighting Brice to order 13. Pebble beach - Solar fridge, light, fan for pebble beach. Week of 20th 14. Library Dehumidifaction . week of the 27th 15. 16. Soluti
th - leak repaired, floor still cupped EFTA00686903 46. Mooring Permit proceeding with bids to place anchors 47. Permits —guest house. Done 48. Electrical Quotes Forwarded to Rich and Tom for review 49. 50. Rationalize Telephone system Karen to make up ext list for each phone 51. 52. 53. The rock c
58957 Rough Notes/Punch List from January 6, 2019 meeting on LSJ JE, and attending 1. Confirm turbo charger for lull was on plane — confirmed. Brice sent picture. 2. order new lull 3. order new dump truck 4. order new fuel truck 5. order new flat bed 6. order new tractor 7. order new h
ter Staff Cottage !. Per.ding 157. LSJ TAi Kitchen Remodel EaictriciPlumbing Ongoing 158 Blue Beach Transformer Replacement Mo Culsoute 159 Electrical and Data to 5 Palms : Charles Electric to Price 160. Electrical Conduit Work at Tower : Craning 161. Solar System and Electnc Pebbte Beach Roo
Gordon < From: Brice Gordon <n> Subject: FW: Conduit Bank A royal. To: "Doug Schoettle" < > Date: Wednesday, June 17, 2009, 3:19 PM Doug, FYI Brice Forwarded Message From: J Epstein <[email protected]> Date: Wed, 17 Jun 2009 13:56:32 -0400 To: Brice Gordon < Subject: Re: Conduit Bank
7, 2009 at 2:04 PM, Brice Gordon < To: JEE > wrote: > wrote: Attached is a proposal for a 2soft extension of the 10 Pipe Conduit bank to the new Electrical building. After reviewing with Tom and Doug , I would like to submit the above proposal for your review/approval The first leg was installed (earl
To: Brice [email protected]] Cc: [email protected][[email protected]] From: Doug Schoettle Sent: Wed 6/17/2009 6:47:34 PM Subject: Re: F
ug issue On Wed, Jun 17, 2009 at 2:04 PM, Brice Gordo To: JEE Attached is a proposal for a 250ft extension of the 10 Pipe Conduit bank to the new Electrical building. After reviewing with Tom and Doug , I would like to submit the above proposal for your review/approval The first leg was installed (earl
From: J <[email protected]> Sent: Tuesday, November 20, 2018 10:22 PM To: Brice Subject: Re: Oil Room no problem , its simple when he te=ls me something i expect it to happen or he sends an email saying it didnt4> btw the roa
, 2018 at 5:05 PM brice gordon < > wrote: This will be started tomo=row We have issues with fuel system Also needed =ike for pool Cabana kitchen Electrical, plus numerous othe= issues !! I told him to focus on electrical issues and I would =ort this area out, my fault, Sent from my iPhone =br>On Nov 2
orage Areas- All areas to be organized & inventoried 21. AC - Proposing that the 2"r unit from Kitchen is replaced & relocated to a Hobbits Barge Brice to Maintenance contract option request proposal from island Marine Paint window frames Danny Projects Move kghts on flag pole Chilies bathroom
e lights parking area Screen Room - repair lamp 5 Pages - repair x 2 floor lamps 5 Palms - review exposed wires around coconut palms berm - cover Electrical box kilo Center - review outside electrical box area 1 of 5 EFTA00598504 LSJ - Island Punch List/Project list asof 1/3/1013 PRIORITIZE PROJE
23 i ail pats of paieraph 7 L4 sot no floors: cps rice Remind the fact to flight status and recorded co
HED Of more space is required, attach additional sheets. Alen* with aircraft nationality and registration mark and date sack completed) Avionic and Electrical modifications installed per drawings listed on Western Commander Top Drawing 108000012 N/C dated 8-8-88 and approved by DER 1NM-476. Installed S
Entities connected to both Condoleezza Rice and Electrical

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Lesley Groff
PERSONBrice Gordon
PERSON
George W. Bush
PERSONKaren
PERSONDarren Indyke
PERSON
Ghislaine Maxwell
PERSON
Karyna Shuliak
PERSONLeon Black
PERSON
United States
LOCATIONDaphne Wallace
PERSON
Prince Charles
PERSON
Joi Ito
PERSONLarry Visoski
PERSON
Julie K. Brown
PERSON
Joe Biden
PERSONDoug Band
PERSON
Alan Dershowitz
PERSON