To: Doug Schoettle From: Jeffrey Epstein Sent: Wed 6/17/2009 6:59:38 PM Subject: Re: FW: Conduit Bank Approval. ok On Wcd, Jun 17, 2009 at 2:47 PM, Doug Schoenlc <= > wrote: Jeffrey, I recommend that the electrical and technology conduit bank that was installed under the concrete plant be extended to the new electrical building at this time. A trench is being dug for the extension of the under sea power cable to the electrical building, now is the time to install the extra conduit in the same trench. Regards, Doug --- On Wed, 6/17/09, Brice Gordon < From: Brice Gordon <n> Subject: FW: Conduit Bank A royal. To: "Doug Schoettle" < > Date: Wednesday, June 17, 2009, 3:19 PM Doug, FYI Brice Forwarded Message From: J Epstein <[email protected]> Date: Wed, 17 Jun 2009 13:56:32 -0400 To: Brice Gordon < Subject: Re: Conduit Bank Approval. this is a doug issue On Wed, Jun 17, 2009 at 2:04 PM, Brice Gordon < To: JEE > wrote: > wrote: Attached is a proposal for a 2soft extension of the 10 Pipe Conduit bank to the new Electrical building. After reviewing with Tom and Doug , I would like to submit the above proposal for your review/approval The first leg was installed (early 2006) prior to cement plant installation Tom is now trenching for the new electrical supply to mechanical building. Proposed 10 pipe Conduit bank is for the future build out of the existing compound and if this work is not performed at this time we are effectively abandoning existing Conduit bank. EFTA_R1_00204196 EFTA01828680
Amount: $21,610.00 F3rICe End of Forwarded Message EFTA_R1_00204197 EFTA01828681