To: Brice [email protected]] Cc: [email protected][[email protected]] From: Doug Schoettle Sent: Wed 6/17/2009 6:47:34 PM Subject: Re: FW: Conduit Bank Approval. Jeffrey, I recommend that the electrical and technology conduit bank that was installed under the concrete plant be extended to the new electrical building at this time. A trench is being dug for the extension of the under sea power cable to the electrical building, now is the time to install the extra conduit in the same trench. Regards, Doug --- On Wed, 6/17/09, Brice Gordon .ce > wrote: From: Brice Gordon amm> Subject: FW: Conduit Bank Approval. To: "Doug Schoettle" Date: Wednesday, June 17, 2009, 3:19 PM Doug, FYI Brice Forwarded Message From: J Epstein <[email protected]> Date: Wed, 17 Jun 2009 13:56:32 -0400 To: Brice Gordon Subject: Re: Conduit Bank Approval. this is a doug issue On Wed, Jun 17, 2009 at 2:04 PM, Brice Gordo To: JEE Attached is a proposal for a 250ft extension of the 10 Pipe Conduit bank to the new Electrical building. After reviewing with Tom and Doug , I would like to submit the above proposal for your review/approval The first leg was installed (early 2006) prior to cement plant installation Tom is now trenching for the new electrical supply to mechanical building. Proposed 10 pipe Conduit bank is for the future build out of the existing compound and if this work is not performed at this time we are effectively abandoning existing Conduit bank. Amount: $21,610.00 wrote: EFTA_R1_01519298 EFTA02443799
Br :ce End of Forwarded Message EFTA_R1_01519299 EFTA02443800