4
Shared Docs
4
Same-Page
4 / 4
Mentions
/Architectural Services — Work Order No. IS. Construction Administration Services for the Mechanical Building Dear Mr. Kerney: Maguire Group Inc. (Maguire) is pleased to present this proposal for Work Order No. 18 under our Master Agreement to provide architectural and engineering services for Link St.
the general scope or services, terms, and conditions described in the Abbreviated Standard Form o[ Agreement Between Owner (IM. LLC )(ad Architect (Maguire Group) herein known as the Master Agreement, dated February 1, 2007. The following revisions shall apply to the master agreement: I. Maguire Group Inc.
ork, NY 10150 RE: Engineering /Architectural Services — Work Order No. 17. Revisions to Mechanical Building Dear Mr. Kerney: Maguire Group Inc. (Maguire) is pleased to present this proposal for Work Order No. 17 under our Master Agreement to provide architectural and engineering services for Little S
general scope of services, terms, and conditions described in the Abbreviated Standard Form of Agreement Between Owner ( LSJ., LLC ) and Architect (Maguire Group) herein known as the Master Agreement, dated February I, 2007. The following revisions shall apply to the master agreement: I. Maguire Group Inc.
s 8. LSJ Permitting Research 9. NOVA February 2008 and Settlement Agreement (Dock)CZM Permit Application (Not in Redweld as of Dec. 30, 2010) 10. Maguire Proposal RE Storm Water Pollution Control Plan 11. Guest Cottage Permit #CZT-26-10L, Oct. 29, 2010 12. Swimming Pool & Cabana Permit #CZT-25-10L, O
. Glidden Electric, Inc. 31. Delongh Group Architects 1.Operating File: Engagement Agreement 2.Accrued Billings Mistatement 3. DeJongh Invoices Maguire Group AIA Document LSJ Operating File I 1. Waiver of Liability Agreement and Release 2. LSJ Staffing EFTA00299880 3. Lance Calloway and Maren Ord Ter
-27-10L, Little St. James Island, LLC (Oct 29, 2010) 11. 2010 CZM Permits EFTA00299895 12. Spa Permit Amendment 13. Master Services Agreement w/Maguire 14. LSJ Permitting and Construction III 1. RO/Generator Mechanical Building (Not in Redweld as of Dec. 30, 2010) 2. Water Appropriation Permit 5/
-53-O4L 8. Underwater lights ( CZM CZT-5 99W Emergency Light Approval for Dock 9-27-06) (Not in Redweld as of dec 30, 2010) 9. Utililities Plan by Maguire Group (Includes electrical, Civil Site Systems and Mechanical) 10. Office Pavilion 11. Office Pavilion Budget 12. Utility Building (CZM CZT 53-04L Issu
Entities connected to both Maguire and Maguire Group

Jeffrey Epstein
PERSONDarren Indyke
PERSON
Richard Kahn
PERSON
Condoleezza Rice
PERSON
Marc Rich
PERSON
Prince Charles
PERSON
Eric Trump
PERSONGensler
PERSONGary Kerney
PERSONDaphne Wallace
PERSONMonique
PERSONMaria Farmer
PERSON
Oliver Stone
PERSON
Samantha Power
PERSON
Lafayette
LOCATION
Michael Jackson
PERSON
Woody Allen
PERSONLeon Black
PERSONLafayette Contractors
ORGANIZATIONHodge
PERSON