3
Shared Docs
3
Same-Page
7 / 3
Mentions
know what day he plans to go? I have Karyna and flying to PB on Sat. Dec. 24th to meet him. they arrive at 3:11pm... On Dec 21, 2016, at 9:16 AM, Larry < wrote: GIV has maintenance delay,. Found corrosion in wheel well,. Gulfstream working up repair Maybe finished Tuesday or wed next week Lookin
From: Lesley Groff <I To: Larry Visoski Larry le Subject: Re: GIV update Date: Wed, 21
From: Lesley Groff <I To: Larry Visoski Larry le Subject: Re: GIV update Date: Wed, 21
lead mechanic tonight, he informs that Engineering in Savanah will NOT allow extension or return to service due to the location of the corrosion in Wheel well area, Engineering is going to issue a repair scheme for this area and Gulfstream sheet metal shop will fabricate an aluminum angle in house in
From: Larry Visoski < Sent: Monday, December 19, 2016 8:51 PM To: Je vacation Cc: Rich Kahn Subject: GIV gear corrosion inspection issue Attachments: IMG_0292.1PG;
From: Larry Visoski < Sent: Monday, December 19, 2016 8:51 PM To:
tachment 00536.txt; IMG_0291.1PG; Untitled attachment 00539.txt; IMG_0294.PNG; Untitled attachment 00542.txt Jeffrey Gulfstream found corrosion in Wheel well area, located in area where water c=llects from wheel spin up„ not safety of flight or Structural, but needs repair„ Option 1 TRY to Obtain a
From: jeffrey E. <[email protected]> Sent: Monday, December 19, 2016 9:23 PM To: Larry Visoski Subject: Re: GIV gear corrosion inspection issue friday 6 ok On Mon, Dec 19, 2016 at 3:51 PM, Larry Visoski > wrote: Jeffrey Gulfstream found c
t: Monday, December 19, 2016 9:23 PM To: Larry Visoski Subject: Re: GIV gear corrosion inspection issu
: GIV gear corrosion inspection issue friday 6 ok On Mon, Dec 19, 2016 at 3:51 PM, Larry Visoski > wrote: Jeffrey Gulfstream found corrosion in Wheel well area, located in area where water =ollects from wheel spin up„ not safety of flight or Structural, but needs repair„ Option 1 TRY to Obtain a
Entities connected to both Larry Visoski and Wheel