From: jeffrey E. <[email protected]> Sent: Monday, December 19, 2016 9:23 PM To: Larry Visoski Subject: Re: GIV gear corrosion inspection issue friday 6 ok On Mon, Dec 19, 2016 at 3:51 PM, Larry Visoski > wrote: Jeffrey Gulfstream found corrosion in Wheel well area, located in area where water =ollects from wheel spin up„ not safety of flight or Structural, but needs repair„ Option 1 TRY to Obtain an extension of 30 to 60 days to repair at later date, stay o= schedule for Wed noon completion. Option 2 Repair by installing a new spliced doubler in the area. (Only a maybe the C=mpletion Date would be Friday 6pm) or later after Xmas.? Option 3 Install new piece, longer down time„ at least Wed mid next week„ I'm trying to confirm completion dates with all three options above sho=ld have more information midmorning tomorrow after Gulfstream engineering =eviews, measurements and cleanup of the area are required before Gulfstrea= engineering gives their opinion for extension or repair. 1 EFTA_R1_01917426 EFTA02666342
Sent from my iPhone =div class="gmail_signature" data-smartmail="gmail_signature"> please note The=information contained in this communication is confidential, may be att=rney-client privileged, may constitute inside information, and is inten=ed only for the use of the addressee. It is the property of JEE U=authorized use, disclosure or copying of this communication or any part=thereof is strictly prohibited and may be unlawful. If you have receive= this communication in error, please notify us immediately by return=e-mail or by e-mail to [email protected] <mailto:[email protected]> , and destroy this communication and al= copies thereof, including all attachments. copyright -all rights reser=ed 2 EFTA_R1_01917427 EFTA02666343
