From: Larry Visoski < Sent: Monday, December 19, 2016 8:51 PM To: Je vacation Cc: Rich Kahn Subject: GIV gear corrosion inspection issue Attachments: IMG_0292.1PG; Untitled attachment 00530.txt; IMG_0293.PNG; Untitled attachment 00533.txt; IMG_0290JPG; Untitled attachment 00536.txt; IMG_0291.1PG; Untitled attachment 00539.txt; IMG_0294.PNG; Untitled attachment 00542.txt Jeffrey Gulfstream found corrosion in Wheel well area, located in area where water c=llects from wheel spin up„ not safety of flight or Structural, but needs repair„ Option 1 TRY to Obtain an extension of 30 to 60 days to repair at later date, stay on=schedule for Wed noon completion. Option 2 Repair by installing a new spliced doubler in the area. (Only a maybe the Co=pletion Date would be Friday 6pm) or later after Xmas.? Option 3 Install new piece, longer down time„ at least Wed mid next week„ I'm trying to confirm completion dates with all three options above should h=ve more information midmorning tomorrow after Gulfstream engineering review=, measurements and cleanup of the area are required before Gulfstream engin=ering gives their opinion for extension or repair. 1 EFTA_R1_01917350 EFTA02666292


