to view the cliff face and having consulted with Alan Smith and deJongh about the same, (c) delongh an
ed that Cedeno and Oriol were both clear to Maria that they were making no promises as to any amendment applications. 5. Maria was not sure if the Dock House amendment applications would be major or minor, but she thought it depended on the cost of the proposed improvements. She mentioned above $75,000 w
th Army Corp (Darren) before filling application, Alan Smith preparing application for dock house, he p
schedule for your review. Gensler 60% complete Design Development. Kitchen Concept, with Zorro Kitchen overlay to be forwarded to you for review. Dock House, Permits, and drawings. Conceptual drawings complete, under the impression that Gensler was in direct contact with you in regard to design phase, i
dendum 0 Dale. Plan Dote Contact 04/12/ I 0 Alan Chavez Remove eating woman board at Pik.Stet POP
ld complete by Nov 30 POOL/THEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 3. theater by lun 30 Dock House/floating dock Hanger CZM Status submitting by July 1 1. Plans go in the 20th 2. Assume approval by September 30 3. Construction plans by Novemb
Entities connected to both Alan Dershowitz and Dock House

Jeffrey Epstein
PERSONLeon Black
PERSON
Marc Rich
PERSON
Prince Andrew
PERSON
Richard Kahn
PERSONDarren Indyke
PERSONRobert D. Critton
PERSON
Joe Biden
PERSONRoy Black
PERSON
Michael Cohen
PERSON
Condoleezza Rice
PERSONJanusz Banasiak
PERSONKaren
PERSON
Carlos
PERSONHBRK Associates
ORGANIZATION
Aspen
LOCATIONGensler
PERSON
Santa Monica
LOCATIONBrice Gordon
PERSONEpstein Interests
ORGANIZATION