13
Total Mentions
13
Documents
116
Connected Entities
Organization referenced in documents
EFTA00305998
ign MECHINICAL ELECTRICAL Status under way should complete by Sept 30 MECHANICAL DESAL Status under way should complete by Nov 30 EFTA00306002 Dock House/floating dock Hanger CZM Status submitting by July 1 Plans go in the 20th Assume approval by September 30 Construction plans by November 31 Pe
EFTA00605620
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
EFTA00724806
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
EFTA00727145
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
EFTA00728004
ed that Cedeno and Oriol were both clear to Maria that they were making no promises as to any amendment applications. 5. Maria was not sure if the Dock House amendment applications would be major or minor, but she thought it depended on the cost of the proposed improvements. She mentioned above $75,000 w
EFTA00729377
schedule for your review. Gensler 60% complete Design Development. Kitchen Concept, with Zorro Kitchen overlay to be forwarded to you for review. Dock House, Permits, and drawings. Conceptual drawings complete, under the impression that Gensler was in direct contact with you in regard to design phase, i
EFTA00854602
_B.pdf; Quote_GSJ_Shelter 1 .docx; Quote_GSJ-Granite.pdf Good afternoon as requested attached bids from Expert Builders please note the following Dock House A, refers to large shelter over water Dock House B, refers to Smaller Existing shelter on land Barge Bulk Head, refers to Barge Land Pad on LSJ Gr
EFTA00854955
ngs not onkly the dock On Mon, Mar 19, 2018 at 2:48 PM, Good afternoon as requested attached bids from Expert Builders please note the following Dock House A, refers to large shelter over water Dock House B, refers to Smaller Existing shelter on land Barge Bulk Head, refers to Barge Land Pad on LSJ >
EFTA00304462
ld complete by Nov 30 POOL/THEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 3. theater by lun 30 Dock House/floating dock Hanger CZM Status submitting by July 1 1. Plans go in the 20th 2. Assume approval by September 30 3. Construction plans by Novemb
EFTA02409028
s under way should complete by Mechanical Dcsal: Status under way should complete by Nov 30 POOL/THEATER Leff planning POP'S GARDEN I.underway Dock House/Floating Dock /.plans being submitted 9/15 Hanger EFTA_R1_0 1469002 EFTA02409029 Have been in contact with the Butler building rep. for the car
EFTA02471978
Sent: Tuesday, April 17, 2018 10:20 AM To: jeffrey E. Cc: Cashkim Bussue; Richard Kahn; Ann Rodriquez; LS1 GSJ Subject: Re: Ceiling Wood For Dock House wit= add to thursday list, who will do design drawings, John Wood? =div class="gmail_extra"> On Mon, Apr 16, 2=18 at 4:25 PM, jeffrey E. <jeevacat
EFTA02499591
0 0 .8ex:border-left:lpraccc solid:padding-left:lee> Good afternoon as requested attached bids from Expert Builders please note the following=/div> Dock House A, refers to =arge shelter over water Dock House B, refers to Smaller Existing shelter on land Barge Bulk Head, refers=to Barge Land Pad on IS1 sup
EFTA02499606
2018 at 2:48 PM, brice gordon= <mailto: > wrote: Good afternoon</=iv> as requested attached bids=from Expert Builders please note the following Dock House B, refers to Smaller E=isting shelter on land Barge Bulk Head, refers to Barge Land Pad on LSJ Granite refers to the install of kitchen=and bathroo

Jeffrey Epstein
PersonAmerican sex offender and financier (1953–2019)

Richard Kahn
PersonJeffrey Epstein's accountant and estate co-executor (2005-present)
Gensler
PersonNER artifact: Gensler is an architecture/design firm, not a person
Brice Gordon
PersonNew Zealand property manager at Epstein's Zorro Ranch in New Mexico, estate beneficiary

Marc Rich
PersonAmerican commodities trader (1934–2013)
Barge Land Pad
PersonName reference in documents

Prince Andrew
PersonThird child of Queen Elizabeth II and Prince Philip, Duke of Edinburgh (born 1960)

Alan Dershowitz
PersonAmerican lawyer, author, and art collector (born 1938)

Michael Cohen
PersonAmerican former attorney and former Republican official
Darren Indyke
PersonAmerican lawyer, longtime personal attorney and co-executor of Jeffrey Epstein's estate
Schematic Design and Client
OrganizationOrganization referenced in documents
the Design Development Documents
OrganizationOrganization referenced in documents
Gensler Consultants
OrganizationOrganization referenced in documents
the Construction Contract
OrganizationOrganization referenced in documents
Meetings and Site Visits
OrganizationOrganization referenced in documents
Communications During Construction
OrganizationOrganization referenced in documents
3.2.3 Submittals
OrganizationOrganization referenced in documents
Submittal
OrganizationOrganization referenced in documents
the Project Budget or Schedule
OrganizationOrganization referenced in documents
CAD Standards
OrganizationOrganization referenced in documents