Gensler 2500 Broadway Suite 300 Santa Monica CA 90404 USA October 6, 2009 Mr. Jeffrey Epstein LS), LLC 6100 Red Hook Quarters, Suite B-3 St. Thomas, Virgin Islands 00802 Subject: Agreement for Architectural Services For Epstein Interests
eement for Architectural Services For Epstein Interests Little St. James Pool Area and Screening Room Gensler Project Number 05.7112.000 Dear Mr. Epstein: This Agreement is between Mr. Jeffrey Epstein ("Client") and M. Arthur Gensler Jr. and Associates, Inc. ("Gensler") for architectural services. A
Santa Monica CA 90404 USA October 6, 2009 Mr. Jeffrey Epstein LS), LLC 6100 Red Hook Quarters, Suite
ng Room Gensler Project Number 05.7112.000 Dear Mr. Epstein: This Agreement is between Mr. Jeffrey Epstein (
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
Gensler 2500 Broadway Tel Suite 300 Fax Santa Monica CA 90404 USA October 6, 2009 Mr. Jeffrey Epstein LS), LLC 6100 Red Hook Quarters, Suite B-3 St. Thomas, Virgin Islands 00802 Subject: Agreement for Architectural Services For Epstein Interests
eement for Architectural Services For Epstein Interests Little St. James Pool Area and Screening Room Gensler Project Number 05.7112.000 Dear Mr. Epstein: This Agreement is between Mr. Jeffrey Epstein ("Client") and M. Arthur Gensler Jr. and Associates, Inc. ("Gensler") for architectural services. A
Santa Monica CA 90404 USA October 6, 2009 Mr. Jeffrey Epstein LS), LLC 6100 Red Hook Quarters, Suite
ng Room Gensler Project Number 05.7112.000 Dear Mr. Epstein: This Agreement is between Mr. Jeffrey Epstein (
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
Gensler 2500 Broadway Suite 300 Santa Monica CA 90404 USA September 28, 2009 Tel 31O449.5600 Fax 310.449.5850 Mr. Jeffrey Epstein LSJ, LLC 6100 Red Hook Quarters, Suite B-3 St. Thomas, Virgin Islands 00802 Subject: Agreement for Architectural Services For Epstein Interests
eement for Architectural Services For Epstein Interests Little St. James Pool Area and Screening Room Gensler Project Number 05.7112.000 Dear Mr. Epstein: This Agreement is between Mr. Jeffrey Epstein ("Client") and M. Arthur Gensler Jr. and Associates, Inc. ("Gensler") for architectural services. A
28, 2009 Tel 31O449.5600 Fax 310.449.5850 Mr. Jeffrey Epstein LSJ, LLC 6100 Red Hook Quarters, Suite
ng Room Gensler Project Number 05.7112.000 Dear Mr. Epstein: This Agreement is between Mr. Jeffrey Epstein (
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
From: -1 111S). To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn LSJ GSJ Subject: LSJ GSJ Expert Builders Date: Mon, 19 Mar 2018 18:48:01 +0000 Attachments: Expert_builde
From: -1 111S). To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn LSJ GSJ
From: -1 111S). To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn
_B.pdf; Quote_GSJ_Shelter 1 .docx; Quote_GSJ-Granite.pdf Good afternoon as requested attached bids from Expert Builders please note the following Dock House A, refers to large shelter over water Dock House B, refers to Smaller Existing shelter on land Barge Bulk Head, refers to Barge Land Pad on LSJ Gr
rge list from Rich Sarah: -Finish going through 6'h, 5th and basement storage -Photo for balcony of stockade Rich Kahn: -Find new office space — JE gave Rich ok to look at 1-15 office spaces. Will forward info after Shelley: .bathroom rugs - Shelley has samples to show JE -entry way carpet — S
with Luis Felix (DR stone quarry rep.) and will be going to the DR sometime between 6-28-10 and 7-6-1 Status of projects and outstanding issues for Jeffrey underlined LIBRARY Status interior I.interiors complete by construction Outstanding issues I.ceiling treatment — Shelley said that Ion is to vis
ign MECHINICAL ELECTRICAL Status under way should complete by Sept 30 MECHANICAL DESAL Status under way should complete by Nov 30 EFTA00306002 Dock House/floating dock Hanger CZM Status submitting by July 1 Plans go in the 20th Assume approval by September 30 Construction plans by November 31 Pe
From: To: "Jeffrey E." <[email protected]> Cc: Rich Kahn < >, LSJ
From: To: "Jeffrey E." <[email protected]> Cc: Rich Kahn < >,
ngs not onkly the dock On Mon, Mar 19, 2018 at 2:48 PM, Good afternoon as requested attached bids from Expert Builders please note the following Dock House A, refers to large shelter over water Dock House B, refers to Smaller Existing shelter on land Barge Bulk Head, refers to Barge Land Pad on LSJ >
connections to main MCC high voltage panels. ■ Purchases Norteck humidifier replacement cylinders. Brice and Karen: 1. Hire a chef (travel with JE)? Sarah: 1. Finish going through 6th, 56 and basement storage 2. Photo for balcony of stockade Rich Kahn: 1. Find new office space - Rich discus
with Luis Felix (DR stone quarry rep.) and will be going to the DR sometime between 6-28-10 and 7-6-1 Status of projects and outstanding issues for Jeffrey underlined LIBRARY Status interior 1.interiors complete by construction Outstanding issues 1.ceiling treatment - Shelley said that Ion is to visi
ld complete by Nov 30 POOL/THEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 3. theater by lun 30 Dock House/floating dock Hanger CZM Status submitting by July 1 1. Plans go in the 20th 2. Assume approval by September 30 3. Construction plans by Novemb
eevacation@gmaitcomi From: Sent Subject: Gary Kemey's To Do List Date Updated Nov. 19,2010 Name: Gary LSJ Library Sun 11/21/2010 2:43:12 AM Jeffrey's To Do List Outstanding Issues: I .Ceiling Treatment: Ion working 2. Cabinet finishes 3. Floor finishes — open issue Master Suite: Status Inte
s under way should complete by Mechanical Dcsal: Status under way should complete by Nov 30 POOL/THEATER Leff planning POP'S GARDEN I.underway Dock House/Floating Dock /.plans being submitted 9/15 Hanger EFTA_R1_0 1469002 EFTA02409029 Have been in contact with the Butler building rep. for the car
Wood For Dock House wit= add to thursday list, who will do design drawings, John Wood? =div class="gmail_extra"> On Mon, Apr 16, 2=18 at 4:25 PM, jeffrey E. <[email protected] <mailto wrote= we can buil it larger =han last time. please have all design pre apporved by me40 with dimensions. thxs On Mon
Sent: Tuesday, April 17, 2018 10:20 AM To: jeffrey E. Cc: Cashkim Bussue; Richard Kahn; Ann Rodriquez; LS1 GSJ Subject: Re: Ceiling Wood For Dock House wit= add to thursday list, who will do design drawings, John Wood? =div class="gmail_extra"> On Mon, Apr 16, 2=18 at 4:25 PM, jeffrey E. <jeevacat
From: jeffrey E. <[email protected]> Sent: Monday, March 19, 2018 9:17 PM To: brice gordon Subject: Re: LS1651 Expert Builders i need to see the dock hosue p
0 0 .8ex:border-left:lpraccc solid:padding-left:lee> Good afternoon as requested attached bids from Expert Builders please note the following=/div> Dock House A, refers to =arge shelter over water Dock House B, refers to Smaller Existing shelter on land Barge Bulk Head, refers=to Barge Land Pad on IS1 sup
Entities connected to both Jeffrey Epstein and Dock House

Richard Kahn
PERSON
Marc Rich
PERSONDarren Indyke
PERSONLeon Black
PERSON
Prince Andrew
PERSON
Alan Dershowitz
PERSON
Condoleezza Rice
PERSON
Joe Biden
PERSONJanusz Banasiak
PERSONBrice Gordon
PERSON
Michael Cohen
PERSONHBRK Associates
ORGANIZATIONKaren
PERSONRoy Black
PERSON
Carlos
PERSONRobert D. Critton
PERSON
Santa Monica
LOCATION
Aspen
LOCATIONGensler
PERSONShelley
PERSON