CLASSIFICATION(S
ORGANIZATIONTHE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC
ORGANIZATION4
Shared Docs
4
Same-Page
4 / 4
Mentions
) Therefore pi Approve these data and limitations of have Federal SIGNATURE(S) OF DESIGNATED ENGINEERING REPRESENTIVE(S) DESIGNATION NUMBER(S) CLASSIFICATION(S) Robert J. Belgau DEBT-510024-CE Structures FAA FORM 81103 (11-70) SUPERSEDES PREVIOUS EDMO N DER SERVICES PROJECT NO. 2001-082 SDNY_GIvl _027
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-IB, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 234 THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.I3-2A. CHAPTER 1. PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
mmend approval of these data I (We) Therefore pi Approve these data SIGNATURES) OF DESIGNATED ENGINEERING REPRESENTIVE(S) DESIGNATION NUMBER(S) CLASSIFICATION(S) Robert J. Belgau DERT-510024-CE Structures — , FAA FORM 8110-3 (11-70) SUPERSEDES PREVIOUS EDITION DER SERVICES PROJECT NO. F2006-173 EFTA0
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-1B, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 23f. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
e) Therefore P1 Approve these data and limitations of have Federal SIGNATURE(S) OF DESIGNATED ENGINEERING REPRESENTIVE(S) DESIGNATION NUMBER(S) CLASSIFICATION(S) Robert J. Belgau DERT-510024-CE Structures FAA FORM 8110-3 (11-70) SUPERSEDES PREVIOUS EDITIO N DER SERVICES PROJECT NO. 2001-082 EFTA0027768
CHECKED FOR ACCURACY AND COMPENSATED AS NECESSARY PER AC 43.13-1B, CHAPTER 12, SECTION 3, PARAGRAPH 12- 37 AND AC 43.13-2A, CHAPTER 2 PARAGRAPH 23f. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH•12
rements of the Federal Aviation • ecommend 1 (We) Therefore Approve SIGNATURE(S) OF SI NATED ENGINEERING REPRESENTATIVE DESIGNATION NUMBER(S) CLASSIFICATION(S) 0 -j9 ' - DERY -405143-CE Structural Special Carin Demus FAA Form 8110-3 (11-70) SUPERSEDES PREVIOUS EDITION EFTA00278137 now • EFTA00278
REPANCIES. AN EMI TEST, REPORT NO.: G2B-20895-080 WAS CONDUCTED AND THE INSTALLED EQUIPMENT DOES NOT INTERFERE WITH ANY OTHER INSTALLED EQUIPMENT. THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC 43.13-2A, CHAPTER 1, PARAGRAPH 3 AND WAS FOUND TO MEET THE REQUIREMENTS OF PARAGRAPH 2. MATERIALS AND PRACTICES COMPLY WITH PARAGRAPHS 4 THROUGH 12
Entities connected to both CLASSIFICATION(S and THE STATIC LOADING OF THE INSTALLED EQUIPMENT MEETS THE REQUIREMENTS OF AC

Samantha Power
PERSON
George W. Bush
PERSONthe Federal Aviation Administration
ORGANIZATIONRegistration Mark
PERSONCollins
PERSON
HONEYWELL
ORGANIZATIONCertificated Repair Station
ORGANIZATIONU.S. DEPARTMENT OF TRANSPORTATION
ORGANIZATION
Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSONK Additional Sheets Are Attached
ORGANIZATIONServl
LOCATIONCONDUCTED
ORGANIZATIONJohn K. Urso
PERSON
United States
LOCATION
Wilmington
LOCATIONFOULK RD
ORGANIZATIONJEGE INC.
ORGANIZATIONG. P.O
PERSONDER Services
ORGANIZATION