r 18, 2009 Page 11 Attachment B: Scope and Fee Summary I. Pool Area: New Construction Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shell/core services for all areas, and Interior Design services at the Screening Ro
services may vary with required sequences of coordination. • Plus standard reimbursable expenses. • * Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services are performed in conjunction with the Pool Area w
services Room only! This column Gensler only was paid retainer for this work. progress payment due for up to 60% this scope and South Pavilions, Grand Stair, de slwWcore services for all areas, SD DD CD CA Total Gensler $100,000 $96,000 $222,000 $95,000 $513,000 Structural $9,375 $11,500 $
t services may vary with required sequences of coordination. • Plus standard reimbursable expenses. ** Allowance, to be billed hourly ••• Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services me performed in conjunction with the Pool Area wo
18, 2009 Page 11 Attachment B: Scope and Fee Summary I Pool Area: New Construction. Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shelUcore services for all areas, and Interior Design services at the Screening Roo
nt services may vary with required sequences of coordination. * Plus standard reimbursable expenses. " Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage: New construction. Assumes all design services are performed in conjunction with the Pool Area
Entities connected to both Grand Stair and CA Services
Gensler
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSONDock House
ORGANIZATIOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATION