3
Shared Docs
3
Same-Page
3 / 3
Mentions
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
r 18, 2009 Page 11 Attachment B: Scope and Fee Summary I. Pool Area: New Construction Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shell/core services for all areas, and Interior Design services at the Screening Ro
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents, when such revisions are, through no fault of the Architect: (a) inconsistent with approvals or instructions previously given by
services Room only! This column Gensler only was paid retainer for this work. progress payment due for up to 60% this scope and South Pavilions, Grand Stair, de slwWcore services for all areas, SD DD CD CA Total Gensler $100,000 $96,000 $222,000 $95,000 $513,000 Structural $9,375 $11,500 $
andard Hourly Billing Rates. Additional Services shall include, but not be limited to, the following: Making revisions in Drawings, Specifications, Project Manual or other documents when such revisions are: (a) inconsistent with approvals or instructions previously given by Client, including revisions made ne
18, 2009 Page 11 Attachment B: Scope and Fee Summary I Pool Area: New Construction. Includes East and West Cabanas, North and South Pavilions, Grand Stair, Pool, Pool Deck, and Basement . Architectural services include shelUcore services for all areas, and Interior Design services at the Screening Roo
Entities connected to both Project Manual and Grand Stair
Gensler
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSONDock House
ORGANIZATIOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATIONClient, Contractor
ORGANIZATION