3
Shared Docs
3
Same-Page
3 / 3
Mentions
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
of, investigating, detecting, abating, replacing, remediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, installation, or performance of any Des
Entities connected to both Dock House and Design/Build by Contractor

Jeffrey Epstein
PERSONGensler
PERSONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONProject Scope
ORGANIZATIONReimbursable
PERSONLimitations of Construction Responsibilities
ORGANIZATIONBasic and Additional Services
ORGANIZATIONClient, Contractor
ORGANIZATIONthe Project, Client
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATION