ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. I Giesler STC 080220 85 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
180) days beyond the dates outlined in the Project Schedule in the agreement, Architect's compensation shall be equitably adjusted. 8.5 Change In Project Scope. If portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent
Entities connected to both Dock House and Project Scope

Jeffrey Epstein
PERSONGensler
PERSONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONDesign/Build by Contractor
ORGANIZATIONReimbursable
PERSONLimitations of Construction Responsibilities
ORGANIZATIONBasic and Additional Services
ORGANIZATIONClient, Contractor
ORGANIZATIONthe Project, Client
ORGANIZATIONConstruction Administration
ORGANIZATIONBulletins
PERSONFire Alarm
PERSONReview Submittals
PERSONWarwick Ian Wicksman
PERSONAndrew P. Cohen
PERSONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATION