3
Shared Docs
3
Same-Page
3 / 3
Mentions
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billing Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
Entities connected to both Dock House and Project Designer

Jeffrey Epstein
PERSONGensler
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION