3
Shared Docs
3
Same-Page
3 / 3
Mentions
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
Entities connected to both Design Services and Standard Terms and Conditions

Jeffrey Epstein
PERSONthe Schematic Design
ORGANIZATIONConstruction Administration
ORGANIZATIONGensler
PERSONSubstantial Completion
ORGANIZATIONHBRK Associates
ORGANIZATIONProduct Data
ORGANIZATIONCommencement of Construction
ORGANIZATION
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONC.3 CLIENT'S REQUIREMENTS OF CONTRACTOR
ORGANIZATIONDock House
ORGANIZATIOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATION