3
Shared Docs
3
Same-Page
3 / 3
Mentions
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
itectural Services September 18, 2009 Page 4 will secure an Architectural License in USVI, through reciprocal agreements between the US and USVI. Gensler Consultants will secure similar licenses, if required by local agencies. 3. Construction Administration. Gensler will assist Client with Construction Administ
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
Entities connected to both Gensler Consultants and Dock House

Jeffrey Epstein
PERSONGensler
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION