gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
gn (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/Visual System Design for sound and projection equipment (Screening Room only). g) General lighting design. h) Landscap
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
Entities connected to both Acoustical Engineering and Dock House

Jeffrey Epstein
PERSONGensler
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONTom Sze
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage