3
Shared Docs
3
Same-Page
3 / 3
Mentions
ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman, AIA fel& Dv AtmAin (Signature) Principal, it 91° 47 (Title) (Date) On behalf of Andrew P. Cohen Executive Director - Santa Monica Califor
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
ide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler By Client Warwick Ian Wicksman. AIA fel& Dv entmAm. (Signature) Principal. (Title) (Printe /I9•01 Ls, atur (Date) (Title) On behalf of Andrew P. Cohen Executive Direct
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
ted to provide services on the Project (the date we received the Schematic Design Phase initial payment), on or about January 13, 2009. By Gensler Warwick Ian Wicksman, AIA By Client (Printed Name of Signatory) By B (Signature) (Signature) principal (Title) (Date) (Title) (Date) On behalf of Andrew P. Coh
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
Entities connected to both Warwick Ian Wicksman and Dock House

Jeffrey Epstein
PERSONGensler
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONBob Anderson
PERSON
Prince Andrew
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION