3
Shared Docs
3
Same-Page
3 / 3
Mentions
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
following documents, in order of precedence: a) amendments and modifications signed by both parties; b) This Letter of Agreement; c) The attached Standard Terms and Conditions (STC); d) The attached Gensler Standard Billing Rate Schedule (Attachment A); e) The detailed fee summary (Attachment B); f) The attached Scope Di
Entities connected to both Structural Engineering and Standard Terms and Conditions
Substantial Completion
ORGANIZATIONConstruction Administration
ORGANIZATIONthe Schematic Design
ORGANIZATION
Jeffrey Epstein
PERSONBasic and Additional Services
ORGANIZATIONCivil Engineering
ORGANIZATIONReimbursable
PERSONProduct Data
ORGANIZATIONGENSLER
ORGANIZATION
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONDock House
ORGANIZATIOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATION