3
Shared Docs
3
Same-Page
3 / 3
Mentions
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
id upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 plus 50% Consultants' SD Fee b) Design Development Phase: $50,000 plus 50% Consultants' DD Fee c) Construction Documents Phase: $100,000 plus 25% Consultants' CD Fee d) Construction Administration Phas
ject, and design services for the following building systems or components: a) Architectural Design. b) Interior Design (Screening Room only). c) Structural Engineering. d) Mechanical, Electrical and Plumbing Engineering (within 5' of the building perimeter). e) Acoustical Engineering (Screening Room). f) Audio/V
ayment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design Development Phase: c) Construction Documents Phase: Fee d) Construction Administration Phase: $50,000 plus 50% Consultants' SD Fee $50,000 plus 50% Consultants' D
Entities connected to both Structural Engineering and Design Development Phase
Reimbursable
PERSON
Jeffrey Epstein
PERSONProduct Data
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONCivil Engineering
ORGANIZATIONGensler
PERSONDock House
ORGANIZATION
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATION