nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
oject. Phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
Entities connected to both Product Data and the Schematic Design
Substantial Completion
ORGANIZATIONConstruction Administration
ORGANIZATION
Jeffrey Epstein
PERSONStandard Terms and Conditions
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONReimbursable
PERSONBasic and Additional Services
ORGANIZATIONC.3 CLIENT'S REQUIREMENTS OF CONTRACTOR
ORGANIZATION
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONDock House
ORGANIZATIOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATION