Gensler 2500 Broadway Suite 300 Santa Monica CA 90404 USA October 6, 2009 Mr. Jeffrey Epstein LS), LLC 6100 Red Hook Quarters, Suite B-3 St. Thomas,
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
Gensler 2500 Broadway Tel Suite 300 Fax Santa Monica CA 90404 USA October 6, 2009 Mr. Jeffrey Epstein LS), LLC 6100 Red Hook Quarters, Suite B-3 S
ow. 1. Pool Area (includes landscape at service road and office path): $937,750 2. AN Garage: $ 20,000 3. Existing Main Residence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial
Gensler 2500 Broadway Suite 300 Santa Monica CA 90404 USA September 28, 2009 Tel 31O449.5600 Fax 310.449.5850 Mr. Jeffrey Epstein LSJ, LLC 6100 Red
- - Included in #1 above Total $5,000 $5,00 $10,00 _ $23,500* * Plus standard reimbursable expenses. **Allowance to be billed hourly. 4. Dock House: New construction over at existing dock. Scope includes Archi ectural Schematic Design only, and DD/CD review of Construction Documents prepared by
Roads: Concrete stamp ordered, expected delivery of stamp Wednesday 20th May. Start mock up Monday using existing stamps. Gensler: Draft Budget & Schedule for Existing Compound Curtis proceeding with development of a Draft Budget and schedule for your review. Gensler 60% comp
schedule for your review. Gensler 60% complete Design Development. Kitchen Concept, with Zorro Kitchen overlay to be forwarded to you for review. Dock House, Permits, and drawings. Conceptual drawings complete, under the impression that Gensler was in direct contact with you in regard to design phase, i
5 4. Robert Couturier invoice 42,483.54 (they claim they deducted 25K only as other 25K was for work on the interior package and nonrefundable) 5. Gensler - upon new agreement pay 66,263.78 6. LSJ Slip C10 - paying 0.91 per foot vs 1.16 that Brice agreed to 7. Pinto still owes JE 40K Euro for decorati
ld complete by Nov 30 POOL/THEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 3. theater by lun 30 Dock House/floating dock Hanger CZM Status submitting by July 1 1. Plans go in the 20th 2. Assume approval by September 30 3. Construction plans by Novemb
Entities connected to both Gensler and Dock House

Jeffrey Epstein
PERSON
Santa Monica
LOCATIONTom Sze
PERSON
Richard Kahn
PERSON
Marc Rich
PERSONLeon Black
PERSONDarren Indyke
PERSON
Michael Cohen
PERSONBob Anderson
PERSON
Prince Andrew
PERSON
Alan Dershowitz
PERSON
Condoleezza Rice
PERSONBrice Gordon
PERSONEpstein Interests
ORGANIZATION
Joe Biden
PERSONHBRK Associates
ORGANIZATIONDesign Services
ORGANIZATIONATV Garage
ORGANIZATIONthe Project, Client
ORGANIZATIONArchitectural Services
ORGANIZATION