3
Shared Docs
3
Same-Page
3 / 3
Mentions
[email protected], Cc: Subject: Fiber project update Date: Sat, 28 Nov 2015 02:06:54 +0000 Good evening Everyone, Omar confirmed that Choice (Hector) will be on LSJ on Monday (11/30/15) morning to complete their side of project. Hector will do the following: I. Install ViNGN via the new router.
failover to Secondary. The above steps have a one to two minute downtime. VINGN will not need to go to LSJ. They will install the crossovers at the Cabrita site. If ViNGN is not ready on Monday, Hector can still do his install but he will also need to install the switches required to monitor the Dragon
n; Jeffrey Epstein Cc: Jermaine Ruan Subject: Choice </=iv> &nb=p;Hector came by the office and he and Jermaine went to the Cabrita site.&=bsp; Hector found some yellow cable that he thinks will work in the interi=. I asked him if we still needed VINGN to go out and he said no.&nbs=; He will get t
driquez; Richard Kahn; Jeffrey Epstein Cc: Jermaine Ruan Subject: Choice </=iv> &nb=p;Hector came by the office and he and Jermaine went to the Cabrita site.&=bsp; Hector found some yellow cable that he thinks will work in the interi=. I asked him if we still needed VINGN to go out and he said no.&n
name got changed from Choice and Terrence took over. I want to verify that the Dragonwave id configured correctly based on the final coordination. Hector. From: Cecile de Jorigh Sent: Tuesday, December 08, 2015 17:44 To: Hector Cintron Cc: lermene Ruan; Omar Welch; Subject: Re: fiber project Emai
see that you are still waiting for the cable that VINGN needs to do the crossover so that answers my question about whether they will be going to the Cabrita site tomorrow. I'll let Anna answer you re the service the last few days since she is M a better position to tell the difference. Thank you for the
Entities connected to both Hector and Cabrita