1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00278135_sub_003 - EFTA00278135_276
a. 111I1 to pressure dome as shown on Drawing *38681 (1 Sheet) dated 8-21-68, except for the aft side of the pressure dome, which was installed by Grumman Aircraft Company, The Grumman Gulfstream II Specification #AE-159—I -21 Section "C" datdd 11-15-67 used as a guide for installation. d. Relocated the APU speed log
No connected entities