1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00281516_sub_002 - EFTA00281516_200
8,876 Fans/Pumps Electric 122,000 416,264 $8,529 Baseline Energy Cost Budget HVAC (ECBFroc) $30,645 Reduction = (ECBwaz - DECwoz)/ ECB.rmc x (Project Are / Total Segmen Area) Reduction = ($30.645 - $28,421)1($30,645 x 120.000 ft / 100.000 ftil Reduction = 36.3% 36.3% > 30% 2 Points Earned Alternate Baseline Project A
No connected entities