1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00281516_sub_002 - EFTA00281516_200
the scope or responsibility of the design team's role in approving submittals. STEP 8 Verify the Installation andPerformance of the Systems to be Commissioned. Commissioning is conducted to verifythe performance ofcommissioned systems as installed to meet the owner's project requirements, basis of design,
No connected entities