gate the timing delay of the radio arrival and try to keep the =nstallation timing as tight as possible and stick to the original solution using =he Enhanced Multi-Carrier solution. Sequence of Events: Pre-ship all materials besides the radios (To arrive in =arket the week of 7/25 or earlier) Antennas, Mounts, Insta