From: Richard Kahn IIIIIIIIII Sent: Friday, June 3, 2016 8:34 PM To: jeffrey E. Subject: Fwd: ZDC Microwave Link attached is email with proposed worst case dates for Zorro =icrowave install future tech was waiting for latest =echnology on dragon wave which is causing a potential 2-3 week pushback =rom original planned completion date of July 15th email below states that they would begin testing 8/5/2016 and = would add an extra week for potential unforeseen issues i am concerned this will interfere with your planned =isit please advise thank =ou FYI - future tech feels confident that =hey can go directly from sandia crest to main house (still need to work out issues on pole height and or new pole =t main house which future tech will install for us) Richard Kahn HBRK Associates Inc. Begin forwarded message: From: =/b>Chris Cappiello Subject: =/b>RE: ZDC Microwave =ink Date: =/b>June 3, 2016 at 9:27:14 AM =DT To: =/b>Richard Kahn < Cc: <mailto:[email protected]», Dave Rumore l ! , Kyle Purintun Walter Tanner Hello Richard and M, rice & [email protected] , "Peter Cappiello" "Sean Johnson" EFTA_R1_01567047 EFTA02461165
I hope all is well. Per our discussion earlier this week we follow up with =ragonwave on an exact date of delivery. Dragonwave has informed us that =he radios (Long lead item) would ship by no later than 7/29. Net of this, we would like to plan for the following to help =itigate the timing delay of the radio arrival and try to keep the =nstallation timing as tight as possible and stick to the original solution using =he Enhanced Multi-Carrier solution. Sequence of Events: Pre-ship all materials besides the radios (To arrive in =arket the week of 7/25 or earlier) Antennas, Mounts, Installation Materials, Cable, etc. • FT build crew to arrive in market on Sunday 7/31/16 • FT will begin the construction on 8/1/16 starting with the =ain Residence Location • Once the main residence location is complete, we will move to =andia Crest • By the time FT is CONSTRUCTION COMPLETE on both ends the =adios will arrive in market. • FT will then pre-configure the radios at the main residence =ocation and then install them on each end • Once the radios are installed, FT will begin the link =lignment. (We would expect to be at this point by Friday 8/5/16 • In the case the Sandia Crest to Main Residence location does =ot meet the performance requirements, we will then go build the ZDC tower and relay the connection through =here Please review and let us know if we can move forward on this =asis. We need your confirmation, so that we can finalize the FCC =icensing to be the enhanced multi-carrier product. Our preference would be to maintain this plan, but will defer to you for guidance. NOTE: We are of course trying to see if we can make any =mprovements on the timelines, but this would be what we feel is =onservative planning, based on the information we have. 2 EFTA_R1_01567048 EFTA02461166