1
Total Mentions
1
Documents
0
Connected Entities
Location referenced in documents
EFTA01367358
term risk to production is a delay in the start-up of complex projects (Kaombo Block 32) while the key long-term risk is a delay in project FIDs in the Kwanza Basin (-250 mbpd of '17-20 incremental growth is from unsanctioned projects) Figure 67; Angola Production Outlook. 2014-2020e (MbId) Figure 68; Product
No connected entities