31 May 2015 Integrated Oil US Integrated Oils A Country by Country Outlook on Key Players Angola Recent pre-salt drilling activity withstanding, exploration spend in Angola over the last 15 years has been largely concentrated in the Lower Congo Basin. As a result, production growth in our forecast period is chiefly driven by project start-ups in the Lower Congo. However, longer-term production growth will likely shift towards the pre-salt Kwanza Basin (Cameia. Orca, Bicuar, etc). In our view, the key near-term risk to production is a delay in the start-up of complex projects (Kaombo Block 32) while the key long-term risk is a delay in project FIDs in the Kwanza Basin (-250 mbpd of '17-20 incremental growth is from unsanctioned projects) Figure 67; Angola Production Outlook. 2014-2020e (MbId) Figure 68; Production by type (area chart of onshore vs. shallow vs. deepwater (Mbid) 2000 s 20@ 1500 1000 0 2014 2015 2016 2017 2018 2019 2020 a Base Sane' Putsch. Sank 'Mod Moclainyt lEA a Growth Wks I Figure 69: Crude volume growth outlook by project status (Mbecl) 2500 - 0 2014 2015 2016 2017 2016 2010 do.44Groaln al Outran Ands ems UnOur 0,407446444 moo Pr i:04014 Dirdop/n4r4 ....C. 004 Caw Scam Dawns Bent Moo' Abotgenat lEA 1500 1000 500 0 2014 2015 2016 • Onshore (Cony) ■Deepwater (Caw) 2017 2018 2019 Sara &weft ant SOW 4041476,44 154 2020 • Shallow vadat (Cony) ■ Ultra-deepwater (Cory) Figure 70: 2017 Production Swing (Bear vs. Bull) of —235 IMbid dim 40rne temp 400 myosin 704M. •1%4 made* nen Seurat Deumh• 9074 MOW PACIMIS lEA 1771 Page 40 Deutsche Bank Securities Inc. CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0058891 CONFIDENTIAL SDNY_GM_00205075 EFTA01367358
