1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA02444456
0 $650,000 Tire Shredder and Oversize Shredder $625,000 $900,000 Extend Grid 400 ft $500,000 $500,000 Offices (3000 ft2) $450,000 $450,000 Equipment Materials and Supplies $100,000 $100,000 Total Construction Cost $22,433,000 $55,008,000 Assumes that connection to Grid is at the building, no additional cost to ext
No connected entities