anuary 28th with installa=ion probably the week of 11 February. 3. On your end, have=you decided on the routing of the feedwater and brine disposal pipelines?&n=sp; There will also need to be 208 three phase power at the seawater pumpin= station as well as one control conduit from the pump station to the RO