Phase 1 is focused on Master Planning and Conceptual Design, and Architectural then Phase 2 is focused on Architectural Detailing, Engineering, and Construction Documents. Enclosed herein is our proposal for Phase I. The deliverables prepared in Phase 1 will be used to solicit optimal pricing from consulting engineer
EFTA00304770
e, San Francisco - Senior designer through all Design phases for hotel public spaces. * Marriot Hotel, Fisherman's Wharf, San Francisco - Designed, Construction Documents and selected hotel standard finishes with Designer/Architect. KAI-YEE WOO & ASSOCIATES/ SHOWROOM San Francisco, Ca/1£ornia 1995- 1997 INTERIOR DES
EFTA00726978
d to questions and or comments by Building Official as required. 4.00 Prepare Construction Documents Based on the selected alternative. prepare Construction Documents suitable for permitting CZM and Building Pertmits. Respond to questions and or comments by Building Official as required. 0 # # tt 0 • 5 5
EFTA00596320
odic visits to the site during construction in order to review the progress and quality of the work for the purpose of ensuring conformity with the Construction Documents. This service will be billed hourly as required. The fee for the design services outlined shall be based upon o lump-sum fee of TWELVE THOUSAND DOL
EFTA02703569
Three Thousand, Eight Hundred Dollars and Zero Cents Upon signing of this Agreement and to proceed with Construction Drawings. Upon completion of Construction Documents and prior to submission of drawings to D.P.N.R. IN WITNESS WHEREOF, the parties have executed this Agreement on the day, month and year first abov