Warwick Wicksman, AIA Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA From: Gary Kerney [mailto: Sent: Thursday, August 19, 2010 5:10 AM To: Warwick Wicksman Subject: RE: LSJ living room and screening room Warwick Please send me a invoice for the new retainer Thanks Gary From: Warwick Wicksman [mailto Sent: Wed 8/18/2010 6:42 PM To: Gary Kerney; Doug Schoettle; Jeffrey Epstein Cc: Rich Kahn; Darren Indyke; Tom Sze; Bryan Oakes Subject: RE: 153 living room and screening room Gary, It was good to speak with you this morning. Attached please find the our proposal for additional conceptual design services, Work Authorization 2, for the Living Room and Screening Room at LSJ. As we discussed, we completed the design services authorized in Work Authorization 1, EFTA_R1_01491426 EFTA02424041
with the conceptual design package we issued at the end of July. (I will forward the invoice for that work as soon as it is prepared.) Based on our conversation this morning, we understand the new design criteria to be the following: • Existing Living Room: o Convert to "residential style" screening room. o Will include fixed screen (as opposed to current pull-down screen). o Will not include separate projection booth. NOTE, due to this, we may not be able to accommodate professional-style projection equipment (due to size/noise/ventilation requirements). THIS MAY IMPACT THE ABILITY TO RECEIVE FIRST-RUN MOVIES DIRECT FROM STUDIOS OR FILM-MAKERS "BELAIR CIRCUIT" COURTESY COPIES OF NEW MOVIES). • Proposed New Living Room: o Approx. 30' x 50', with floor level similar to main residence/garden level. o Covered access from Main Residence; uncovered access from Garden. o No wrap-around terraces. o Similar aesthetic look as existing structures (roof, exterior finishes). o Provide windows on north and east for view and day-lighting. o No defined internal program (open area, bathroom, pantry, dining area, etc...) Please let me know if you have any corrections or additional comments. Please sign and return the attached proposal, and remit the retainer and the balance due on the upcoming invoice. We are ready to start as soon as these items are addressed! Thanks, Warwick Warwick Wicksman, AIA Principal EFTA_R1_01491427 EFTA02424042



