To: Lvjet From: Jeffrey epstein Sent: Thur 3/15/2012 11:04:34 PM Subject: Re: Gil / B727 Sat Boeing JFK Sorry for all the typos .Sent from my iPhonc On Mar IS, 2012, at 6:53 PM, Lvjet c wrote: Jeffrey, The Boeing is completed and aux tank operational,. Gil update Need to install Rudder, both elevators and rig flight contols tomorrow, engine runs on saturday, once controls are rigged and installed,. Saturday and Sunday would be overtime, and still don't think it will be ready for flight, there is always something that will not ops check good,. personally think Monday is real, aircraft will need full cleaning exterior, interior and stainless steel bright work needs to be polished, which will take a full day, we could pass on this, but should be accomplished,. thx, larry EFTA_R1_00226148 EFTA01840912