3
Shared Docs
3
Same-Page
3 / 3
Mentions
MP SUM BASIS - WE CONSIDERED ALL( EXCEPT THE CONCRETE a BLOCK SIMILAR TYPE OF MATERIAL) I. THE MATERIALS AND ITEMS TO U SENT FROM 26.13 DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FOR THE DETAILED DESIGNED 26.16 12 MONTHS FOR CONSTRUCTION (TO BE DISCUSSED) 26.17 26.18 WC The conbac
N Nos. - C WASH BASIN AND SEMI PEDESTAL Nos. - - AA 3 HOLE DECK MOUNTED BASIN MIXER Nos. - - BEI MONO TALL BASIN MIXER Nos. - - CC MONO BASIN MIXER WITH POP)UP WASTE Nos. - - 14.02 SOME TRAP Nos. - - 14.03 MINI ANGLE VALVE Nos. - - 14.04 BBB (WC SET) FLOOR MOUNTED CLOSE COUPLED WC
P SUM BASIS . 26.13 WE CONSIDERED ALL ( EXCEPT THE CONCRETE & BLOCK SIMILAR TYPE OF MATERIAL) & THE MATERIALS AND ITEMS TO BE SENT FROM DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FORME DETAILED DESIGNED 26.14 26.17 ____ 12 moms FOR CONSRUCTION (TO BE DISCUSSED) 26.18 26.19 ire con
MOUNT (USD) C WASH BASIN AND SEMI PEDESTAL Nos. - - AA 3 HOLE DECK MOUNTED BASIN MIXER Nos. - - B8 MONO TALL BASIN MIXER NOS. - - CC MONO BASIN MIXER WON POP-UP WASTE NOS. - - 11.02 11.03 SOME TRAP MINI ANGLE VALVE 3 NOS. NOS. - - - 1404 (WC SET) FLOOR MOUNTED CLOSE COUPLED WC SEAT
MP SUM BASIS - WE CONSIDERED ALL( EXCEPT THE CONCRETE a BLOCK SIMILAR TYPE OF MATERIAL) I. THE MATERIALS AND ITEMS TO U SENT FROM 26.13 DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FOR THE DETAILED DESIGNED 26.16 12 MONTHS FOR CONSTRUCTION (TO BE DISCUSSED) 26.17 26.18 WC The conbac
N Nos. - C WASH BASIN AND SEMI PEDESTAL Nos. - - AA 3 HOLE DECK MOUNTED BASIN MIXER Nos. - - BEI MONO TALL BASIN MIXER Nos. - - CC MONO BASIN MIXER WITH POP)UP WASTE Nos. - - 14.02 SOME TRAP Nos. - - 14.03 MINI ANGLE VALVE Nos. - - 14.04 BBB (WC SET) FLOOR MOUNTED CLOSE COUPLED WC
Entities connected to both Istanbul and MONO BASIN MIXER

United States
LOCATION
Samantha Power
PERSON
Oliver Stone
PERSONSchneider
PERSON
Eric Holder
PERSONJAMES ISLAND
LOCATIONConsrucilon &
ORGANIZATIONMax Floor
PERSONUve Load
ORGANIZATIONInstaBallon
ORGANIZATIONPool Maintenance Kit
ORGANIZATIONSUMMARY • STEEL STRUCTURE
ORGANIZATIONPVC CO/Iduil
ORGANIZATIONSupply lc Installalion
ORGANIZATIONU NIT PRICE
ORGANIZATIONClaimer
ORGANIZATIONSupply ond installoIon
ORGANIZATIONSupply & kntollolion ot GI
ORGANIZATIONSupply & Instollalion ol Boaboxwith
ORGANIZATIONSupply & tratollalion ot
ORGANIZATION