MP SUM BASIS - WE CONSIDERED ALL( EXCEPT THE CONCRETE a BLOCK SIMILAR TYPE OF MATERIAL) I. THE MATERIALS AND ITEMS TO U SENT FROM 26.13 DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FOR THE DETAILED DESIGNED 26.16 12 MONTHS FOR CONSTRUCTION (TO BE DISCUSSED) 26.17 26.18 WC The conbac
EEL WORKS 1718000/33 3.71400003 - 1.018630.14 1.1leson, Supply. Erection works of steel beams 2.Design °Nino to be as per local codes 3.Design Uve Load will be 3Kn/San and I Imposed load to be 2K n/sqm 4. light weigh' partition max 1Kn/sqm) 4. Max Floor to floor Height 4.8M 5. Cl deck sheet 6.Sfe
P SUM BASIS . 26.13 WE CONSIDERED ALL ( EXCEPT THE CONCRETE & BLOCK SIMILAR TYPE OF MATERIAL) & THE MATERIALS AND ITEMS TO BE SENT FROM DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FORME DETAILED DESIGNED 26.14 26.17 ____ 12 moms FOR CONSRUCTION (TO BE DISCUSSED) 26.18 26.19 ire con
UCTURE it ROOF WORKS - 2.01 2.02 ROOF STEEL WORKS 1.Design, Supply, Erectionworks of steel beams 2.Desgn Wei° to be as per local codes 3.Design Uve Load will be 3Kn/Sqm and I Imposed load to be 2K nisrarn • light we4ghl postilion max 1Knisqm) 4. Max Floor to floor Height 4.8M 5. GI deck sheet 6.St
MP SUM BASIS - WE CONSIDERED ALL( EXCEPT THE CONCRETE a BLOCK SIMILAR TYPE OF MATERIAL) I. THE MATERIALS AND ITEMS TO U SENT FROM 26.13 DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FOR THE DETAILED DESIGNED 26.16 12 MONTHS FOR CONSTRUCTION (TO BE DISCUSSED) 26.17 26.18 WC The conbac
EEL WORKS 1718000/33 3.71400003 - 1.018630.14 1.1leson, Supply. Erection works of steel beams 2.Design °Nino to be as per local codes 3.Design Uve Load will be 3Kn/San and I Imposed load to be 2K n/sqm 4. light weigh' partition max 1Kn/sqm) 4. Max Floor to floor Height 4.8M 5. Cl deck sheet 6.Sfe
Entities connected to both Istanbul and Uve Load

United States
LOCATION
Samantha Power
PERSON
Oliver Stone
PERSONSchneider
PERSON
Eric Holder
PERSONJAMES ISLAND
LOCATIONMax Floor
PERSONMONO BASIN MIXER
ORGANIZATIONConsrucilon &
ORGANIZATIONPool Maintenance Kit
ORGANIZATIONInstaBallon
ORGANIZATIONSUMMARY • STEEL STRUCTURE
ORGANIZATIONPVC CO/Iduil
ORGANIZATIONSupply lc Installalion
ORGANIZATIONU NIT PRICE
ORGANIZATIONClaimer
ORGANIZATIONSupply ond installoIon
ORGANIZATIONSupply & kntollolion ot GI
ORGANIZATIONSupply & Instollalion ol Boaboxwith
ORGANIZATIONSupply & tratollalion ot