3
Shared Docs
3
Same-Page
3 / 3
Mentions
MP SUM BASIS - WE CONSIDERED ALL( EXCEPT THE CONCRETE a BLOCK SIMILAR TYPE OF MATERIAL) I. THE MATERIALS AND ITEMS TO U SENT FROM 26.13 DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FOR THE DETAILED DESIGNED 26.16 12 MONTHS FOR CONSTRUCTION (TO BE DISCUSSED) 26.17 26.18 WC The conbac
O RM. DESCRIPTION WY UNIT UNIT PRICE IAED1 AMOUNT (AED) AMOUNT (USD) P PRELIMINARIES • -- Design Procedures (Includes Design & concept. Consrucilon & waking trawigs) 1 Item 1,39).830.00 1,390,800.00 331,041.10 Supply of required approvals from aulhally ( Muncipality/ avi Defence and Local m
P SUM BASIS . 26.13 WE CONSIDERED ALL ( EXCEPT THE CONCRETE & BLOCK SIMILAR TYPE OF MATERIAL) & THE MATERIALS AND ITEMS TO BE SENT FROM DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FORME DETAILED DESIGNED 26.14 26.17 ____ 12 moms FOR CONSRUCTION (TO BE DISCUSSED) 26.18 26.19 ire con
DESCRIPUON OTT UNIT UNIT PRICE (AED1 AMOUNT (AED) AMOUNT (USD) V PRELIMINARIES M M — -- Design Procedures (includes Design & concept. Consrucilon & waking trawigs) 1 Item 1740./0040 1,244400.00 341931.51 Supply of required approvals from authority ( Muncipality/ CM cetencei and Local mana
MP SUM BASIS - WE CONSIDERED ALL( EXCEPT THE CONCRETE a BLOCK SIMILAR TYPE OF MATERIAL) I. THE MATERIALS AND ITEMS TO U SENT FROM 26.13 DUBAI OR ISTANBUL 26.14 TIME ESTIMATION 26.15 3 MONTHS FOR THE DETAILED DESIGNED 26.16 12 MONTHS FOR CONSTRUCTION (TO BE DISCUSSED) 26.17 26.18 WC The conbac
O RM. DESCRIPTION WY UNIT UNIT PRICE IAED1 AMOUNT (AED) AMOUNT (USD) P PRELIMINARIES • -- Design Procedures (Includes Design & concept. Consrucilon & waking trawigs) 1 Item 1,39).830.00 1,390,800.00 331,041.10 Supply of required approvals from aulhally ( Muncipality/ avi Defence and Local m
Entities connected to both Istanbul and Consrucilon &

United States
LOCATION
Samantha Power
PERSON
Oliver Stone
PERSONSchneider
PERSON
Eric Holder
PERSONJAMES ISLAND
LOCATIONUve Load
ORGANIZATIONInstaBallon
ORGANIZATIONMONO BASIN MIXER
ORGANIZATIONMax Floor
PERSONPool Maintenance Kit
ORGANIZATIONSUMMARY • STEEL STRUCTURE
ORGANIZATIONPVC CO/Iduil
ORGANIZATIONSupply lc Installalion
ORGANIZATIONU NIT PRICE
ORGANIZATIONClaimer
ORGANIZATIONSupply ond installoIon
ORGANIZATIONSupply & kntollolion ot GI
ORGANIZATIONSupply & Instollalion ol Boaboxwith
ORGANIZATIONSupply & tratollalion ot
ORGANIZATION