cting framer about coming on site - Mirrored Siding - removed, stripping/stucco complete — final top coat due to start 12/19 4. Berm/Top of Hill — Brice investigating a wood/paper combination material for hydro-seeding - on site, will start using - Pergola construction for high road benches — David —
d 11/7 either soft white/black design or plain white extra soft rug — Sarah - Lights —JE to review lights at parking area with Danny 7. LS1 Dock - Dock Carpet & New Trim — final trim work to be completed by 11/20 8. Dock Boxes - David will fabricate a lighter lid — sample at MC Pool —JE reviewed — investigating resi
cting framer about coming on site - Mirrored Siding - removed, stripping/stucco complete — final top coat due to start 12/19 4. Berm/Top of Hill — Brice investigating a wood/paper combination material for hydro-seeding - on site, will start using - Pergola construction for high road benches — David —
11/7 either soft white/black design or plain white extra soft rug — Sarah - Lights — JE to review lights at parking area with Danny 7. LSJ Dock - Dock Carpet & New Trim — final trim work to be completed by 11/20 8. Dock Boxes - David will fabricate a lighter lid — sample at MC Pool — JE reviewed — investigating res
Mirrored Siding - removed, stripping/stucco complete — final top coat pending - Piano/Stool - relocated to hanger — Complete 4. Berm/Top of Hill — Brice investigating a wood/paper combination material for hydro-seeding - on site - Pergola construction for high road benches — David — require design de
hite/black design or plain white extra soft rug — Sarah has ordered - Pace clock — ordered 2 units due —shipped to incorrect address 7. LSJ Dock - Dock Carpet & New Trim — final trim work to be completed week of 11/17 8. Dock Boxes - David will fabricate a lighter lid — sample at MC Pool — JE reviewed — requested in
remove & wall painted — start 11/26 - Piano/Stool — to be relocated to hanger - 12/2 4. Grotto - Mattress cover — complete 5. Berm/Top of Hill — Brice investigating a wood/paper combination material for hydro-seeding. Distributor found, sourcing material - Pergola construction for high road benches
andy ETA — awaiting update 8. LSJ Dock - Dock box top & seat — Installed. Require more coats for UV Protection, completed over the week of 11/26 - Dock Carpet & New Trim — Installation early Dec 9. Dock Boxes - David will fabricate a lighter lid — in production 10. Chillax Room - Media Center - ordered — shipped t
Entities connected to both Condoleezza Rice and Dock Carpet & New Trim

Jeffrey Epstein
PERSON
Marc Rich
PERSONLeon Black
PERSON
Oliver Stone
PERSON
Martha Stewart
PERSONLandscaping
PERSONBuck Steel
ORGANIZATIONChillax Bathroom
PERSONNanny Cay
LOCATIONRO & Generators
ORGANIZATIONPebble Beach
LOCATIONMini Excavator
ORGANIZATIONInstall Robe Hook
PERSONMC — Installation
ORGANIZATIONETA STT
ORGANIZATIONHeli Pad - Wind
ORGANIZATIONVIPA Lease
ORGANIZATIONRich & Brice
ORGANIZATIONNautica/Center Consol
ORGANIZATIONMC Pool — JE
ORGANIZATION