From: Brice To: Jeffrey Epstein <[email protected]> Subject: Re: Buck Steel Date: Tue, 16 Oct 2012 19:45:38 +0000 Unfortunately it would require buck stee
uld require buck steel to do major design changes to match existing bolt pattern It easier for us to cut and replace The existing pattern came from American Steel Sent from my iPhone On Oct 16, 2012, at 2:28 PM, Jeffrey Epstein <[email protected]> wrote: can buck steel build to our bolts in place„ what p
From: Brice To: Jeffrey Epstein <[email protected]> Subject: Re: Buck Steel Date: Tue, 16 Oct 2012 20:16:38 +0000 Will contact and let you know Sent from
uld require buck steel to do major design changes to match existing bolt pattern It easier for us to cut and replace The existing pattern came from American Steel Sent from my iPhone On Oct 16, 2012, at 2:28 PM, Jeffrey Epstein <[email protected]> wrote: can buck steel build to our bolts in place„ what p
teel Shed Estimated cost for shed and doors $33,911.00, this does not include shipping how do you wish to proceed On Tue, Oct 16, 2012 at 4:16 PM, Brice < > wrote: Will contact and let you know Sent from my iPhone On Oct 16, 2012, at 3:47 PM, Jeffrey Epstein < > wrote: and how long woudl it take
uld require buck steel to do major design changes to match existing bolt pattern It easier for us to cut and replace The existing pattern came from American Steel Sent from my iPhone On Oct 16, 2012, at 2:28 PM, Jeffrey Epstein < > wrote: EFTA00668915 can buck steel build to our bolts in place„ what plans
eneral re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Empl
possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal of existing bolt pattern & epoxy in new anchors 24. Equipment Purchased - (3) Te
eneral re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Empl
ubmit copy of plan to VIPA. Drawing Package forwarded to Tom Melnick for a bid 10/18 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal of existing bolt pattern & epoxy in new anchors 24. Equipment to be Purchased -
Entities connected to both Condoleezza Rice and American Steel

Jeffrey Epstein
PERSON
Marc Rich
PERSONDarren Indyke
PERSONLeon Black
PERSONLarry Visoski
PERSON
Samantha Power
PERSON
Oliver Stone
PERSONRichard Barnett
PERSONCecile de Jongh
PERSONLandscaping
PERSONBuck Steel
ORGANIZATIONJohn Deere
PERSONGerry & TJ
ORGANIZATIONNanny Cay
LOCATIONBlack Heli
LOCATIONRO & Generators
ORGANIZATIONCOMPLETE - JE
ORGANIZATIONMechanical Building Transformer
ORGANIZATIONArmy Corp 10/17
ORGANIZATION