From: LAllenby • To: NYC - Jeffrey Epstein <[email protected]> Cc: NYC - Richard Kahn < >, "Allenby, Leighton" <a> Subject: Fwd: 358 El Brillo Way Date: Tue, 18 Aug 2015 11:32:41 +0000 Can we do soil boring and testing tomorrow / w
pstein <[email protected]> Cc: NYC - Richard Kahn < >, "Allenby, Leighton" <a> Subject: Fwd: 358
they do sooner - I am trying to find out Leighton Allenby Director of Pro erties On Mon, Aug 17, 2015 at 5:14 PM, < wrote: Leighton, I met with Nutting Engineers this afternoon at 358 El Brillo and discussed the location of the soil boring test and the damage it may cause to the site. It will be sand from the
From: Richard Kahn Subject: Fwd: Neptune LLC: Geotechnical report recommendation by Fahti from Botkin Parssi & Associates Consulting Engineers Sent: Tuesday, August
From: Richard Kahn Subject: Fwd: Neptune LLC: Geotechnical report r
t to be performed to determine if the stemware (see below for definition) foundation is settling causing current and future issues cost is $1,990 by Nutting Engineers and after this test Fatih Acikgoz, the consulting engineer can make his recommendations and Dan can then draft a proposal and timeline for your app
From: Richard Kahn Sent: Wednesday, August 19, 2015 5:49 PM To: jeffrey E. Subject: Fwd: Soil boring - PB Richard Kahn HBRK Associates Inc. Begin forwarded mes
From: Richard Kahn Sent: Wednesday, August 19, 2015 5:49 PM To:
nd out 3 EFTA_R1_01612146 EFTA02490848 Leighton Allenby Director =f Properties On Mon, Aug 17, 2015 at 5:14 PM, wrote: Leighton, I met with Nutting Engineers this afternoon at 358 El Brillo and =iscussed the location of the soil boring test and the damage it may =ause to the site. It will be sand from the
Entities connected to both Richard Kahn and Nutting Engineers