From: Richard Kahn Sent: Wednesday, August 19, 2015 5:49 PM To: jeffrey E. Subject: Fwd: Soil boring - PB Richard Kahn HBRK Associates Inc. Begin forwarded message: From: 4b>LAIlenby Subject: =/b>Soil boring - =B Date: =/b>August 19, 2015 at 1:45:39 PM =DT To: =/b>NYC - Richard Kahn FYI Leighton =llenby Director of Properties Begin forwarded message: From: Date: =ugust 19, 2015 at 1:38:38 PM AST To: =eighton Allenby Subject: Re: Neptune entry doors 358 El =rillo Way Leighton, The soil =oring test was complete this afternoon. EFTA_R1_01612144 EFTA02490846
They made =t down 20 feet before they hit rock. They showed =anusz and myself the samples taken every 2 feet. Their findings showed = layer of muck and also a layer of pete the first 13 feet. from 13 feet =own to 20 was loose sand. They will take about 4 =o 5 working days to produce a written soil report and we will forward =t to the structural engineer for an evaluation. Sent from my iPhone On =ug 18, 2015, at 11:46 PM, Leighton Allenby =rote: do these doors need to be replaced? =hy? Leighton Allenby Director of Properties On Tue, Aug 18, 2015 at 7:55 =M, wrote: Leighton, See attached proposal for the new main and rear entry =oors. The window quote previously sent was mis titled and does =ot include them. Thank you, Dan Original Message From: LAIlenby To: labontedw Sent: Tue, Aug , : am Subject: Re: 358 El Brillo Way 2 EFTA_R1_01612145 EFTA02490847
Can you put down plywood to protect? Leighton Allenby Director of Properties On Aug 18, 2015, at 7:28 AM wrote: There also may be some minimal sod repair after the equipment is =emoved. Sent from my iPhone On Aug 18, 2015, at 7:12 AM, LAIlenby > wrote: One or two days? Leighton Allenby Director of Pro •erties On Aug 18, 2015, at 7:08 AM rote: I just spoke to the engineer and they could mobilize and do the soil =oring test tomorrow which is Wednesday if that is acceptable. Please let me know and I will confirm the schedule with them Sent from my iPhone On Aug 17, 2015, at 10:37 PM, Leighton Allenby wrote: If Mr. Epstien isn't coming this week can they do sooner - I am trying =o find out 3 EFTA_R1_01612146 EFTA02490848
Leighton Allenby Director =f Properties On Mon, Aug 17, 2015 at 5:14 PM, wrote: Leighton, I met with Nutting Engineers this afternoon at 358 El Brillo and =iscussed the location of the soil boring test and the damage it may =ause to the site. It will be sand from the boring auger on a large =ripod of which we will contain on tarps. We discussed this work in =etail with Janusz and he informed us Mr. Epstein may be visiting this =eek so I scheduled the work for the following Wed. I have contacted all of my subcontractors and we should have all the =ork quotes ready for you late tomorrow afternoon. Thank you, Dan Original Message From: Leighton Allenby To: labontedw Sent: Thu, Aug 13, 2015 11:07 am Subject: Re: Wind mitigation report =20 price both ways please - thanks Leighton Allenby Director of Properties On Thu, Aug 13, 2015 at 10:59 AM, wrote: He told me the existing louvered shutters are not Miami Dade approved. = He said we could use armor screen rather than rigid shutters if you are =nterested in that option Sent from my iPhone 4 EFTA_R1_01612147 EFTA02490849
On Aug 13, 2015, at 10:52 AM, Leighton Allenby < wrote: can they certify any of the items that AIG would accept instead of =eplacing? Leighton Allenby Director of Properties On Thu, Aug 13, 2015 at 10:16 AM, wrote: Leighton I just met with All American windows and shutters, I asked him to provide alternate =ricing with options along with pricing to replace the front and rear =oors. He will be sending us an itemized quote with a brochure of the products =hey're proposing to use. They are the company that did the original shutters on the house 10 =ears ago. Thank you Dan Sent from my iPhone 5 EFTA_R1_01612148 EFTA02490850