3
Shared Docs
3
Same-Page
3 / 3
Mentions
CK OF THE VOICE RECORDER AND RECORDER INDEPENDENT POWER SUPPLY (RIPS) (IF INSTALLED). PKG PKG 12 .31 .
l (s)-Suppressed Requirement (Ern-Estimated Base Time •-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 6 Of 315 EFTA00619045 CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON
23 FUNCTIONALLY TEST CENTER TANK FUEL BOOST PUMP POWER FAILED ON PROTECTION SYSTEM. MOS 12 9.23 30-O
(s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 113 Of 315 EFTA00619152 CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICT
REF: BTC 70-818-02-01 AFL 59 863 CHAPTER 71 POWER PLANT • 71-010-01 VISUALLY CHECK THE LEFT INLET
(s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 201 Of 315 EFTA00619240 CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON
Entities connected to both Samantha Power and CNVIP

Ghislaine Maxwell
PERSONVALVE
ORGANIZATION
HONEYWELL
ORGANIZATIONVP-BBJ
ORGANIZATIONHRSAISC 0/C
ORGANIZATIONAsiaticefin Annend
LOCATIONHRSAISC
LOCATIONMSC NR
ORGANIZATIONMSC 0
ORGANIZATIONINTERNAL-GENERAL VISUAL
ORGANIZATIONMSC GM
ORGANIZATIONVP-B63
ORGANIZATIONRequIrement
ORGANIZATIONYGOO6
LOCATIONMSC 0/C
ORGANIZATIONVP-B6.1
ORGANIZATIONHRSAISC NR
ORGANIZATIONCDCCL
ORGANIZATIONOnnesiday
ORGANIZATIONCUTOUT
ORGANIZATION