CAMP AMIIIIVIfreell et1144 737-72UB3 REVISION 21 S/N 29273 (YG006) VP-BBJ OWNER: PICTON II LTD. OPERATOR: PICTON II LTD. ADDRESS: C/O JET AVIATION ADDRESS: C/O JET AVIATION GENEVA AIRPORT a+1215 GENEVA AIRPORT a+1215 PHONE: PHONE: FAX: FAX: ANALYST: DENNIS RUFFINI EMAIL: AIRCRAFT SERIAL/REGNO: 29273 (YG006)/VP-BBJ MODEL: 737-72UBJ REVISION 21 MANUFACTURER: BOEING COMPANY DATES LAST ACTUALS CURRENT ACTUAL INSERVICE DATE: 08-OCT-1999 3753:19 NC MRS as of 30-JUN-2014 NC HRS as of _i_t 922 AFL as of 30-JUN-2014 AFL as of _i_t 3455:18 APH as of 30-JUN-2014 APH as of _i_t APU SERIAL/PART: P-5180/3800702-1 MODEL: 131-9B MANUFACTURER: HONEYWELL INSTALLED ON 25-JUN-2010 LAST ACTUALS CURRENT ACTUAL 3001 AR! HRS 3455:18 APU HRS as of 30-JUN-2014 APU HRS as of _/_/ 2487 APUS 2961 APUS as of 30-JUN-2014 APUS as of _/_/ ENGINE NO. 1 SERIAL/PART: 874437/CFM56-7827/53 MODEL: CFM56-7627/63 MANUFACTURER: CFM INTERNATIONAL S.A. INSTALLED ON 05-MAY-2011 LAST ACTUALS CURRENT ACTUAL 3556:48 ENG. HRS 3525:36 NC MRS 3753:19 ENG. HRS as of 30-JUN-2014 ENG. MRS as of _/_/ 821 ENC 886 ENC as of 30-JUN-2014 ENC as of _/_/ ENGINE NO. 2 SERIAL/PART: 874438/CFM56-7827/B3 MODEL: CFM56-7627/63 MANUFACTURER: CFM INTERNATIONAL S.A. INSTALLED ON 08-OCT-1999 LAST ACTUALS CURRENT ACTUAL 44 ENG. HRS 44 NC MRS 3753:19 ENG. HRS as of 30-JUN-2014 ENG. HRS as of / / 15 ENC 886 ENC as of 30-JUN-2014 ENC as of _i_t INNING AND BM ME TRADEMAPAS OF TIE BOEING COMPANY 07-AUG-2014 Status Report CAMP SYSTEMS 1 Of 315 EFTA00619040
aMP"Mean ins Mrn.nd Status Report 737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BB3): 3753:19 HRS, 922 AFL as of 30-Jun-2014 Owner/Operator. PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX LIMIT TIME (ENNI ASH REMAINING CHAPTER 05 TIME LIMITS/MAINTENANCE CHECKS • 050010 A-1 CHECK PKG 11 if PKG 12 ,31 ,32 ,33 MOS 6 12-FEB-2014 12,AUG-2014 5a HRS/MSC 3743:34 REF: AFL 917 • 050020 A-2 CHECK PKG 12 in PKG 31 ,32 ,33 MOS 12 03-JUL-2013 03-JUL-2014 CC< HRS/MSC 372321 REF: AFL 908 + 060030 C-1 CHECK PKG 31 in PKG 32 ,33 MOS 36 -20 29-AUG-2011 09-AUG-2014 2 d HRS/MSC 3533:32 REF: AFL 863 + 050040 C-2 CHECK PKG 32 in PKG 33 MOS 72 -20 29-AUG-2011 09-AUG-2017 1098d HRS/MSC 3533:32 REF: AFL 863 + 050050 C-3 CHECK PKG 33 MOS 144 -20 29-AUG-2011 09-AUG-2023 3289 d HRS/MSC 3533:32 REF: AFL 863 050060 MONTHS CHECK PKG 1 MOS 1 -4 13-JUN-2014 09-JUL-2014 *C•C HRS/MSC 3749:42 REF: AFL 920 2-Insufficient Information +-Task exists in Inspection Manual (s)Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM CAMP SYSTEMS 2 Of 315 EFTA00619041
Status Report 737-7208) REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (EMU ALM LIMIT REMAINING CHAPTER 00 INFORMATION AC-120-93 CONDUCT AN AIRPLANE REPAIR SURVEY. IDENTIFY AND DISPOSITION REPAIRS REQUIRE IMMEDIATE ACTION, AND DEVELOP DAMAGE TOLERANCE INSPECTIONS MOS HRS/MSC 59000 59000 55246A1 REF: AFL CHAPTER 05 TIME LIMITS/MAINTENANCE CHECKS 05-00014 ACTIVE STORAGE PROCEDURE DAYS 7 54 14-JUN-2014 21-JUN-2014 «< HRSYMSC 3:37 3749:42 REF: AFL 2 920 05-10000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 10000:AFL MOS HRSYMSC REF: MPD NO REF AFL 9000 9000 8078 06-14200 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 14200:AFL MOS HR&MSC REF: MPD NO REF AFL 13200 13200 12278 05-18000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 18000:AFL MOS HRSYMSC REF: MPD NO REF AFL 17000 17000 16078 06-21600 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 21600:AFL MOS HR&MSC REF: MPD NO REF AFL 20600 20600 19678 06-24000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 24000:AFL MOS HRSYMSC REF: MPD NO REF AFL 23000 23000 22078 05-27000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 27000:AFL MOS HRS/MSC REF: MPD NO REF AFL 26000 26000 25078 05-28000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 28000:AFL MOS HRS/MSC REF: MPD NO REF AFL 27000 27000 26078 ?-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (Ern-Estimated Base Tacna •-Estimated Due (New Requirement) (EFF)-Effective CM @ CAMP SYSTEMS 3 Of 315 EFTA00619042
CAMP A.ati gap.. Mr end Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 05-34000 05-36000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 34000:AFL REF: MPD NO REF MOS HRSIMSC AFL 33000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 36000:AFL REF: MPD NO REF MOS HRSIMSC AFL 35000 05-50000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 50000:AFL REF: MPD NO REF MOS HRSIMSC AFL 49000 05-51-01 INSPECT HARD LANDING OR HIGH DRAGISIDE LOAD LANDING MOS 05.030 HRSIMSC A/R REF: AFL 05-51-04 INSPECT FOR SEVERE OR UNUSUAL TURBULENCE. STALL. BUFFET OR SPEEDS MORE THAN DESIGN LIMITS MOS 05.035 HRSIMSC A/R REF: AFL 05-51-07 INSPECT FOR HIGH ENERGY STOP/HEAT DAMAGE CONDITION MOS 05.040 HRS.IMSC A/R REF: AFL 05-51-08 INSPECT FOR FLAP/SLAT DOWN OVERSPEED CONDITION MOS 05.045 HRSIMSC A/R REF: AFL 05-51-10 INSPECT FOR DRAGGED ENGINE NACELLE/FAN BLADE OUT/ENGINE SEIZUREff HRUST REVERSER AND ATTACH POINTS DAMAGE MOS 05.050 HRSIMSC A/R REF: AFL 05-51-14 INSPECT FOR MERCURY SPILLAGE CONDITION MOS 05.055 HRSIMSC A/R REF: AFL 05-51-15 INSPECT FOR BRAKE SEIZURE CONDITION MOS 05.060 HRSIMSC A/R REF: AFL 33000 32078 35000 34078 49000 48078 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 4 Of 315 EFTA00619043
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 05-51-16 05.065 05-51-17 05.070 REF: 05-51-18 05.075 REF: 05-51-19 INSPECT FOR FLAT SPOTTED TIRES MOS HRS/MSC A/R REF: AFL INSPECT FOR WHEEL BEARING FAILURE/DAMAGE CONDITION MOS HRS/MSC A/R AFL INSPECT FOR BIRD/HAIL STRIKE CONDITION MOS HRS/MSC A/R AFL INSPECT FOR LIGHTING STRIKE CONDITION MOS 05.080 FIRS/ MSC A/R REF: AFL 05-51-22 INSPECT FOR HYDRAULIC FLUID REACTION WITH TITANIUM MOS 05.085 HRS/MSC A/R REF: AFL 05-51-24 INSPECT FOR CABIN OVERPRESSURE CONDITION MOS 05.090 HRS/MSC A/R REF: AFL 05-51-27 INSPECT FOR EXTREME DUST CONDITION MOS 05.095 HRS/MSC A/R REF: AFL 05-51-28 INSPECT FOR ICE OR SNOW CONDITION MOS 05.100 HRS/MSC A/R REF: AFL 05-51-29 INSPECT FOR EXCEEDING MAXIMUM NOSE LANDING GEAR TOWING ANGLE OR MAXIMUM TOWING LOAD MOS 05.105 HRS/MSC A/R REF: AFL 05-51-31 INSPECT FOR VOLCANIC ASH CONDITION 05.110 05-51-32 05.115 REF: MOS HRS/MSC A/R AFL INSPECT FOR TAIL STRIKE/SKID CONDITION REF: MOS HRS/MSC A/R AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (Ern-Estimated Base Time •-Estimated Due (New Requirement) (EFF)-Effective CM (L) CAMP SYSTEMS 5 Of 315 EFTA00619044
CAMP t Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 05-51-34 05.120 05-51-35 05.125 05-5142 05.130 05-51-44 05.135 05-5147 05.140 05-51-54 05.145 05-51-57 05.150 05-51-67 INSPECT FOR HOT AIR DUCT RUPTURE CONDITION MOS HRSYMSC R REF: AFL INSPECT FOR OVERWEIGHT LANDING REF: MOS HRSYMSC R AFL INSPECT FOR DAMAGE DUE TO ENGINE BLADE OUT REF: MOS HRS/MSC R AFL INSPECT FOR NACELLE/STRUT PRESSURE RELIEF DOORS OPEN CONDITION REF: MOS HRS/MSC R AFL INSPECT FOR LANDING - GEAR DOWN OVERSPEED CONDITION REF: MOS HRSYMSC R AFL INSPECT FOR TIRE TREAD LOSS OR TIRE BURST MOS HRSYMSC R REF: AFL INSPECT FOR ACID SPILLAGE CONDITION REF: MOS HRSYMSC R AFL INSPECT FOR AIRFRAME VIBRATION CONDITION MOS 05.155 HRSYMSC R REF: AFL 05-51-80 05.160 05-51-81 05.165 05-51-9I 05.170 INSPECT FOR CONDITIONED AIR PACK OUTLET DUCT SYSTEM FAILURE REF: MOS HRSYMSC R AFL INSPECT FOR CABIN DEPRESSURIZATION CONDITION REF: MOS HRSYMSC R AFL INSPECT FOR EXCESSIVE CABIN PRESSURE LEAKAGE REF: MOS HRS/MSC R AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (Ern-Estimated Base Time •-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 6 Of 315 EFTA00619045
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 05-51-92 05.175 05-55-08 05.180 06-55-10 05.185 REF: 05-55-1 I INSPECT FOR NON - ENVIRONMENTAL WING ICING MOS HRSYMSC A/R REF: AFL INSPECT/CHECK HIRFLIGHTNING FLIGHT CONTROLS BOND STRAPS MOS HRSAiSC A/R REF: AFL INSPECT/CHECK HIRFLIGHTNING ENGINE WIRING HARNESSES MOS HRS/MSC A/R AFL INSPECT/CHECK HIRF/LIGHTNING ENGINE BOND STRAPS MOS 05.190 HRSAiSC A/R REF: AFL 05-55-15 INSPECT/CHECK HIRFLIGHTNING EE BAY 05.195 REF: 05-55-23 MOS HRS/MSC A/R AFL INSPECT/CHECK HIRFLIGHTNING CONNECTORS ON LEFT SIDE OF THE AIRPLANE MOS 05.200 HRSAiSC A/R REF: AFL 05-55-24 INSPECT/CHECK HIRFLIGHTNING CONNECTORS ON RIGHT SIDE OF THE AIRPLANE 05.205 REF: 05-55-25 MOS HRSAiSC A/R AFL INSPECT/CHECK HIRFLIGHTNING WIRE BUNDLES ON THE LEFT SIDE OF THE AIRPLANE MOS 05.210 HRSAISC A/R REF: AFL 06-55-26 INSPECT/CHECK HIRFLIGHTNING WIRE BUNDLES ON THE RIGHT SIDE OF THE AIRPLANE MOS 05.215 HRSAISC A/R REF: AFL 05-55-30 INSPECT/CHECK HIRFLIGHTNING EMPENNAGE MOS 05.220 HRS/MSC A/R REF: AFL 05-56000 REVIEW D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR TASKS WITH INTERVAL OF 56000:AFL REF: MPD NO REF MOS HRSAiSC AFL 55000 55000 54078 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 7 Of 315 EFTA00619046
CAMP A.ati gap.. v,.e..,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL ( ENH ) AFH LIMIT REMAINING 057001 RENEWAL CERTIFICATE OF WORTHINESS + 05FLS1 05.010 + 05FLS2 05.020 05-22-01 72.305 05-22-01 72.305 REF: See Workcard REF: MOS HRSYMSC DUE AFL DETERMINE D626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR FLIGHT SENSITIVE (FLS) TASKS (FIG 9-1) MOS HRS1MSC 45000 REF: See Workcard AFL 30000 DETERMINE 0626A001-CMR STRUCTURAL INSPECTIONS SECTION TASKS THRESHOLD INTERVALS FOR FLIGHT SENSITIVE (FLS) TASKS (FIG 9-2) MOS HRSAISC 33000 AFL 22000 7.93 23:49 10 NO. 1 ENGINE - INSPECT AT FAN BLADE EXPOSURE THE MANUFACTURERS SERIAL NUMBER MARKED ON THE BLADE DOVETAIL AND COMPARE IT TO THE LIST OF PROHIBITED SERIAL NUMBERS IN CFM SB 72-0796 REF: BTC 05-22-01 MOS HRS/MSC A/R ENC 177.97 3709:19 871 NO. 2 ENGINE - INSPECT AT FAN BLADE EXPOSURE THE MANUFACTURERS SERIAL NUMBER MARKED ON THE BLADE DOVETAIL AND COMPARE IT TO THE LIST OF PROHIBITED SERIAL NUMBERS IN CFM SB 72-07% MOS HRSAISC A/R REF: BTC 05-22-01 ENC CHAPTER 08 LEVELING AND WEIGHING 081001 WEIGHT CHECK OF AIRCRAFT 08.010 REF: MOS 60 HRS/MSC AFL CHAPTER 10 PARKING, MOORING, STORE AND RET TO SERV 10-12-02-550-803 (s) PREPARE THE AIRPLANE FOR STORAGE FOR MORE THAN SEVEN DAYS DAYS 7 10.010 HRS1MSC REF: AFL 10-12-02-550404 (a) RETURN THE AIRCRAFT BACK TO A SERVICABLE CONDITION AFTER STORAGE OF LESS THAN 60 DAYS MOS 10.055 HRS1MSC A/R 3753:19 0 REF: AFL 10-12-02-550-805 (a) RETURN RETURN THE AIRCRAFT BACK TO A SERVICABLE CONDITION AFTER STORAGE OF MORE THAN 60 DAYS MOS 10.060 HRSYMSC A/R 3753:19 0 REF: AFL 09-DEC-2013 3729:30 912 08-OCT-1999 44 15 177.97 08-OCT-1999 3709:19 44 871 15 16-DEC-2014 M I 31 d 45000 41246:41 30000 29078 33000 22000 29246:41 21078 47.93 09-AUG-2010 09-AUG-2015 367 d 304:48 3448:31 81 841 3753:19 0 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 0 CAMP SYSTEMS 8 Of 315 EFTA00619047
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 10-12-02-620-810 (s) 10.015 SERVICING/PROTECTION ON 7 DAY (1 WEEK) CYCLES REF: DAYS 7 HRSYMSC AFL 10-12-02420411 (s) SERVICING/PROTECTION ON 14 DAY (2 WEEK) CYCLES 10.020 REF: 10-12-02420412 (s) SERVICING/PROTECTION ON 30 DAY (1 MONTH) CYCLES DAYS 14 HRS/MSC AFL DAYS 30 10.025 HRS/MSC REF: AFL 10-12-02420413 (s) SERVICING/PROTECTION ON 60 DAY (2 MONTH) CYCLES DAYS 60 10.030 HRSYMSC REF: AFL 10-12-02420414 (s) SERVICING/PROTECTION FOR MORE THAN 60 DAYS (2 MONTHS) DAYS 60 10.035 HRS1MSC 3753:19 0 REF: AFL 10-12-02420415 (s) SERVICING/PROTECTION FOR MORE THAN 90 DAYS (3 MONTHS) DAYS 90 10.040 HRS/MSC 3753:19 0 REF: AFL 10-12-02420416 (s) SERVICING/PROTECTION FOR MORE THAN 180 DAYS (6 MONTHS) DAYS 180 10.045 HRSAiSC 3753:19 0 REF: AFL 10-12-02420417 (s) SERVICING/PROTECTION FOR MORE THAN 365 DAYS (1 YEAR) DAYS 365 10.050 HRS1MSC 3753:19 0 REF: AFL CHAPTER 20 STANDARD PRACTICES - AIRFRAME • 20-010-01 (s) GENERAL VISUAL INSPECTION OF HIRFil. SENSITIVE WIRE RUNS OUTSIDE THE PRESSURE VESSEL ON THE LEFT PKG SIDE OF THE AIRPLANE. LOOK FOR OBVIOUS SIGNS OF DAMAGE AND LACK OF SECURITY OF THE WIRE RUNS. 3753:19 0 3753:19 0 3753:19 0 3753:19 0 PKG 32 .33 MOS 72 35.27 29-AUG-201I 20.010 HRSAISC 219:47 3533:32 REF: BTC 20-010-01-01 AFL 59 863 + 20-010-02 (s) GENERAL VISUAL INSPECTION OF HIREL SENSITIVE WIRE RUNS OUTSIDE THE PRESSURE PKG VESSEL ON RIGHT SIDE OF THE AIRPLANE. LOOK FOR OBVIOUS SIGNS OF DAMAGE AND LACK OF SECURITY OF THE WIRE RUNS. 20.020 PKG 32 .33 REF: BTC 20-010-02-01 MOS 72 35.27 29-AUG-2011 HRSAISC 219:47 3533:32 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 9 Of 315 EFTA00619048
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING • 20-020-00 GENERAL VISUAL INSPECTION OF HIRFiL SENSITIVE WIRE RUNS INSIDE THE PRESSURE VESSEL LOOK FOR OBVIOUS DAMAGE AND CONDITION OF SECURITY OF WIRE RUNS MOS 72 71.5 22-AUG-2008 22-AUG-2014 15E 20.030 HRSAiSC 492:31 3260:48 REF: BTC 20-020-00-CH AFL 140 782 + 20-030-01 (s) DETAILED VISUAL INSPECTION OF THE LIGHTNINGIHIRF PROTECTION COMPONENTS OUTSIDE THE PRESSURE PKG VESSEL ON THE LEFT SIDE OF AIRPLANE. INSPECT FOR CONDITION OF SECURITY AND SIGNS OF CORROSION. PKG 32 .33 MOS 72 35.27 29-AUG-201I 20.060 HRSAiSC 219:47 3533:32 REF: BTC 20-030-01-01 AFL 59 863 + 20-030-02 (s) DETAILED VISUAL INSPECTION OF THE LIGHTNINGIHIRF PROTECTION COMPONENTS OUTSIDE THE PRESSURE PKG VESSEL ON THE RIGHT SIDE OF AIRPLANE. INSPECT FOR CONDITION OF SECURITY AND SIGNS OF CORROSION. PKG 32 .33 MOS 72 35.27 29-AUG-201I 20.065 HRS/MSC 219:47 3533:32 REF: BTC 20-030-02-01 AFL 59 863 + 20-040-01 (s) FUNCTIONAL CHECK OF THE HIRF/L SENSITIVE CONNECTORS OUTSIDE THE PRESSURE VESSEL ON LEFT SIDE OF PKG THE AIRPLANE. CHECK DC RESISTANCE FROM THE BLACKSHELL TO GROUND PKG 32 .33 MOS 72 35.27 29-AUG-2011 20.070 HRSAISC 219:47 3533:32 REF: BTC 20-040-01-01 AFL 59 863 + 20-040-02 (s) FUNCTIONAL CHECK OF THE HIRF/L SENSITIVE CONNECTORS OUTSIDE THE PRESSURE VESSEL ON THE RIGHT PKG SIDE OF THE AIRPLANE. CHECK DC RESISTANCE FROM THE BACKSHELL TO GROUND. PKG 32 .33 MOS 72 35.27 29-AUG-2011 20.080 HRSAiSC 219:47 3533:32 REF: BTC 20-040-02-01 AFL 59 863 + 20-050-00 DETAILED VISUAL INSPECTION OF HIRF/L SENSITIVE CONNECTORS INSIDE THE PRESSURE VESSEL. DURING THE INSPECTION DO NOT DISCONNECT CONNECTORS. LOOK FOR CONDITION. SECURITY. AND SIGNS OF CORROSION MOS 72 71.5 22-AUG-2008 22-AUG-2014 15 d 20.090 HRS/MSC 492:31 3260:48 REF: BTC 20-050-00-01 AFL 140 782 + 20-060-00 FUNCTIONAL CHECK OF HIRF/L. SENSITIVE CONNECTORS INSIDE THE PRESSURE VESSEL BY DC RESISTANCE CHECK FROM BACKSHELL TO GROUND. MOS 72 71.5 22-AUG-2008 22-AUG-2014 15 d 20.100 HRSIMSC 492:31 3260:48 REF: BTC 20-060-00-CH AFL 140 782 + 20-070-00 DETAILED VISUAL INSPECTION OF THE HIRE& SENSITIVE PIG TAILS INSIDE THE PRESSURE VESSEL. LOOK FOR CONDITION OF SECURITY AND SIGNS OF CORROSION. MOS 72 71.5 22-AUG-2008 22-AUG-2014 15E 20.110 HRSAiSC 492:31 3260:48 REF: BTC 20-070-00-CH AFL 140 782 + 20-100-00 GENERAL VISUAL INSPECTION OF THE BONDING STRAPS AT THE FOLLOWING LOCATIONS: 1 STRAP ON THE RUDDER. 2 STRAPS PER AILERON. LEADING EDGE FLAP. SPOILER AND EACH ELEVATOR SURFACE. STRUT TO WING BONDING USES 1 STRAPS PER WING. EACH AIR CONDITIONING PACK COMPARTMENT DOOR. MAIN LANDING GEAR DOOR. EACH ENGINE COWLING AND EACH STRUT TO ENGINE INSTALLATION USES 2 BONDING STRAPS 20.150 REF: BTC 20-100-00-01 MOS 177.97 08-OCT-1999 HRS)MSC 15000 3709:19 44 15044 11290:41 AFL 884 38 7-Insufficient Intent..300n +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effectlye GW O CAMP SYSTEMS 10 Of 315 EFTA00619049
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING • 20-110-01 GENERAL VISUAL INSPECTION OF THE LEFT ENGINE EXTERNAL (COWL OPEN) HARNESS CONDITION AND SECURITY 20.160 MOS HRS./MSC 6000 REF: BTC 20-110-01-01 AFL 177.97 08-OCT-1999 3709:19 44 884 38 + 20-110-02 GENERAL VISUAL INSPECTION OF THE RIGHT ENGINE EXTERNAL (COWL OPEN) HARNESS CONDITION AND SECURITY. 6044 2290:41 MOS 177.97 08-OCT-1999 20.170 HRS./MSC 6000 3709:19 44 6044 2290:41 REF: BTC 20-110-02-01 AFL 884 38 + 20-120-01 DETAILED INSPECTION OF THE LEFT ENGINE CONNECTORS FOR TIGHTNESS (ALL CONNECTORS ON HARNESS J5. ./6. J7. J8. CJ9.J9. J10. CJIO. MW0301. MW0302. MW0303. MW0304 ON THE LEFT ENGINE MOS 20.180 HRS./MSC 15000 REF: BTC 20-120-01-01 AFL 177.97 08-OCT-1999 3709:19 44 15044 11290:41 884 38 + 20-120-02 DETAILED INSPECTION OF THE RIGHT ENGINE CONNECTORS FOR TIGHTNESS (ALL CONNECTORS ON HARNESS J5. J6. J7. J8. CS. J9. J10. CJIO. MW0301. MW0302. MW0303. MW0304 ON THE RIGHT ENGINE MOS 177.97 08-OCT-1999 20.190 HRSYMSC 15000 3709:19 44 15044 11290:41 REF: BTC 20-120-02-01 AFL 884 38 + 20-130-01 GENERAL VISUAL INSPECTION OF THE TWO ENGINE BONDING STRAPS RELATED TO HIRF/LIGHTNING FOR CONDITION AND SECURITY ON THE LEFT ENGINE 20.200 MOS HRSYMSC 6000 REF: BTC 20-130-01-01 AFL 177.97 08-OCT-1999 3709:19 44 6044 2290:41 884 38 + 20-130-02 GENERAL VISUAL INSPECTION OF THE TWO ENGINE BONDING STRAPS RELATED TO HIRF/LIGHTNING FOR CONDITION AND SECURITY ON THE RIGHT ENGINE. MOS 177.97 08-OCT-1999 20.210 HRS./MSC 6000 3709:19 44 6044 2290:41 REF: BTC 20-130-02-01 AFL 884 38 20-140-00 (s) FUNCTION CHECK OF THE HIRF/L SENSITIVE CONNECTORS INSIDE THE EMPENNAGE. PKG PKG 32 .33 MOS 72 35.27 29-AUG-2011 20.230 HRSAISC 219:47 3533:32 REF: BTC 20-140-00-01 AFL 59 863 20-141-00 FUNCTIONAL CHECK OF THE LIGHTNINGMIRF PROTECTION COMPONENTS IN THE TAIL CONE FOR ELECTRICAL BOND DEGRADATION USING THE LOOP RESISTANCE TESTER (LRT). (UHIRF) MOS 216 177.97 08-OCT-1999 08OCT-2017 1158d HRSAISC 3709:19 44 REF: AFL 884 38 20-142-01 FUNCTIONALLY CHECK THE LIGHTNINGMIRF PROTECTION COMPONENTS IN THE LRRA ANTENNA INSTALLATION FOR DEGRADATION OF THE BOND BETWEEN ANTENNA TO STRUCTURE USING THE LOOP RESISTANCE TESTER (LRT) REF: MOS 144 HRS./MSC AFL (EBT) 01-APR-2025 38900 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-EffecUve CM O CAMP SYSTEMS 11 Of 315 EFTA00619050
CAMP Asia/me/in rAnnendar Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) Ani LIMIT REMAINING 200206 GROUND LOCK ASSEMBLY C32026-1 MOS 20.040 N/SN HRS,MSC O/C 3753:19 0 REF: AFL CHAPTER 21 AIR CONDITIONING + 21-010-00 REPLACE RECIRCULATION FAN HEPA FILTER(S) MOS 35.27 29-AUG-2011 21.110 HRS/MSC 6000 219:47 3533:32 9533:32 5780:13 REF: BTC 21-010-00-01 AFL 59 863 21-015-00 DETAILED INSPECTION OF THE RECIRCULATION FAN CHECK VALVE(S) FOR CONDITION. SECURITY AND. PROPER OPERATION. MOS 177.97 08-OCT-1999 21.020 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 21-015-00-01 AFL 884 38 t 21-020-00 OPERATIONAL CHECK THE ALTERNATE BE COOLING SUPPLY FAN MOS 177.97 08-OCT- I 999 21.120 HRSYMSC 4000 3709:19 44 4044 290:41 REF: BTC 21-020-00-01 AFL 884 38 + 21-030-00 OPERATIONAL CHECK ALTERNATE SE COOLING EXHAUST FAN MOS 177.97 08-OCT-1999 21.130 HRSAiSC 4000 3709:19 44 4044 290:41 REF: BTC 21-030-00-01 AFL 884 38 + 21-040-00 REPLACE THE E/E COOLING SUPPLY FAN FILTER MOS 35.27 29-AUG-2011 21.140 HRSYMSC 6000 219:47 3533:32 9533:32 5780:13 REF: EITC 21-040-00-0I AFL 59 863 + 21-050-00 OPERATIONAL CHECK THE OVERBOARD EXHAUST VALVE IN SMOKE CLEARANCE MODE MOS 177.97 08-OCT-1999 21.150 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 21-050-00-01 AFL 884 38 + 21-060-00 OPERATIONAL CHECK THE OUTFLOW VALVE MANUAL MODE (MOTOR). SELECTOR PANEL INDICATOR. INDICATOR FEEDBACK MODULE MOS 177.97 08-OCT-1999 21.160 HRS/MSC 6000 3709:19 44 6044 2290:41 REF: BTC 21-060-00-01 AFL 884 38 + 21-070-00 FUNCTIONAL CHECK THE POSITIVE PRESSURE RELIEF VALVES MOS 177.97 08-OCT-1999 21.170 HRSYMSC 10000 3709:19 44 10044 6290:41 REF: BTC 21-070-00-01 AFL 884 38 + 21-080-00 REPLACE THE POSITIVE PRESSURE RELIEF VALVE FILTERS MOS 177.97 08-OCT- I 999 21.180 FIRS/MSC 10000 3709:19 44 10044 6290:41 REF: BTC 21-080-00-01 AFL 884 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 12 Of 315 EFTA00619051
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE PART/SERIAL (ENH) AFH MAX TIME LIMIT REMAINING + 21-090-00(s) FUNCTIONAL CHECK THE NEGATIVE PRESSURE RELIEF DOOR PKG PKG 33 MOS 144 35.27 29-AUG-201I 21.190 HRSYMSC 219:47 3533:32 REF: BTC 21-090-00-01 AFL 59 863 + 21-100-00 CLEAN THE PRIMARY AND SECONDARY HEAT EXCHANGERS MOS 177.97 08-OCT-1999 21.200 HRSAISC 5000 3709:19 44 5044 1290:41 REF: BTC 21-100-00-CH AFL 884 38 + 21-140-01 (s) CHECK THE LEFT WATER SEPARATOR INDICATION DISK (WITH THE AIR CONDITIONING SYSTEM OPERATING) PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 21.240 HRS/MSC 29:58 3723:21 REF: BIC 21-140-01-01 AFL 14 908 + 21-140-02 (s) CHECK THE RIGHT WATER SEPARATOR INDICATION DISK (WITH THE AIRCONDITIONING SYSTEM OPERATING) PKG PKG 12.31 .32 .33 MOS 12 13.13 03-JUL-2013 21.250 HRSYMSC 29:58 3723:21 REF: BTC 21-140-02-01 AFL 14 908 + 21-150-00 CLEAN/REPLACE THE CABIN TEMPERATURE SENSOR FILTERS (737-700 HAS ONE EACH IN THE CONTROL AND PASSENGER CABIN. 737-800/SC0ER HAS 3 FILTERS) MOS 83.43 24-AUG-2007 21.260 HRS/MSC 1003 784:51 2968:28 3968:28 215:09 REF: BTC 21-150-00-0 I AFL 223 699 21-160-00 CLEAN (OFF-AIRCRAFT) THE OZONE CONVERTERS (IF INSTALLED). MOS 177.97 08-OCT-1999 21.060 HRSAISC 12030 3709:19 44 12044 8290:41 REF: BTC 21-160-00-01 AFL 884 38 21-190-00(s) DISCARD APU BLEED AIR DUCT FLEXIBLE PRESSURE SEAL. PKG DISCARD PKG 32 .33 MOS 72 35.27 29-AUG-2011 21.635 HRSYMSC 219:47 3533:32 REF: BTC 21-190-00-01 AFL 59 863 21-25-02 (2) RIGHT RECIRCULATION FAN 645405-1 MOS 177.97 08-OCT-1999 21.300 78-3019 HRS/MSC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 21-25-03 (2) RIGHT RECIRCULATION FAN CHECK VALVE 3202096-2 MOS 177.97 08-OCT-1999 21.340 5292 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-27-02 (1) NORMAL SUPPLY EQUIPEMENT FAN 4101054 MOS 177.97 08-OCT-1999 21.530 1866 HRSYMSC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 21-27-02 (2) ALTERNATE SUPPLY EQUIPMENT FAN 4101054 MOS 177.97 08-OCT-I999 21.540 1895 HRSYMSC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 13 Of 315 O CAMP SYSTEMS EFTA00619052
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 21-27-03(1) LOW FLOW SUPPLY SENSOR 0123FA2 MOS 177.97 08-OCT-I999 21.610 0413 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-27-03(2) LOW FLOW EXHAUST SENSOR 0123FA2 MOS 177.97 08-OCT-1999 21.610 0398 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-27-04 (1) NORMAL EXHAUST EQUIPMENT FAN 4101054 MOS 177.97 08-OCT-I999 21.550 1421 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-27-04 (2) ALTERNATE EXHAUST EQUIPMENT FAN 4101054 MOS 177.97 08-OCT-1999 21.560 1905 HRSAiSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-27-05 EXHAUST OVERBOARD VALVE 20798-01 MOS 177.97 08-OCT-1999 21.390 9846927 HRSAiSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-31-01 (1) NO. 1 CABIN PRESSURE CONTROLLER 7121-19971-0IAB MOS 70.03 06-OCT-2008 21.460 9811907 HRSYMSC 0./C TSN:3288:55 3752 3288:55 REF: AFL TSN:787 922 787 21-31-01 (2) NO. 2 CABIN PRESSURE CONTROLLER 7121-19971-OIAB MOS 70.03 06-OCT-2008 21.460 9819595 HRS/MSC 0/C TSN:3288:55 3752 3288:55 REF: AFL TSN:787 922 787 21-31-02 CABIN PRESSURE P5-6 MODULE SELECTOR 7123-19973-02AB MOS TSR:0 35.27 29-AUG-2011 21.450 93077214 HRSAISC 0./C TSR:0 219:47 3533:32 REF: AFL TSR:0 59 863 21-31-03 CABIN OUTFLOW VALVE 4663-19972-0IAA MOS 177.97 08-OCT-1999 21.380 9819804 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-32-01 (1) NO. 1 POSITIVE PRESSURE RELIEF VALVE 7207374 MOS 177.97 08-OCT-I 999 21.440 9803050 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-32-01 (2) NO. 2 POSITIVE PRESSURE RELIEF VALVE 7207374 MOS 177.97 08-OCT-1999 21.440 9803052 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 14 Of 315 EFTA00619053
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 21-33-01 RATE OF CLIMB INDICATOR WL5OIRCI MOS 177.97 08-OCT-1999 21.410 AR539/088 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-33-02 ALTITUDE/DIFFERENTIAL PRESSURE INDICATOR AW2835AB06 MOS TSN:0 58.3 28-SEP-2009 21.420 08083354A HRSAISC O/C TSN:0 375 3378:04 REF: AFL TSN:0 110 812 21-33-04 (1) CABIN ALTITUDE WARNING (S128) PRESSURE SWITCH 214C50-2 MOS 177.97 08-OCT-1999 21.430 W54916 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-45-01 (1) FORWARD DOOR AREA HEATER PN MOS SN-UNKNOWN HRSAISC O/C 3753:19 0 REF: AFL 21-45-01 (2) AFT DOOR AREA HEATER PN MOS SN-UNKNOWN HRS/MSC 0/C 3753:19 0 REF: AFL 21-51-01 (1) LEFT FLOW CONTROL AND SHUTOFF VALVE 396498-2 MOS 177.97 08-OCT-1999 21.290 1362 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-01 (2) RIGHT FLOW CONTROL AND SHUTOFF VALVE 396498-2 MOS 177.97 08-OCT-1999 21.290 1408 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-02(1) AIR CONDITIONING ACCESSORY UNIT 65-52810-57 MOS 177.97 08-OCT-1999 21.520 D03602 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-03(1) LEFT SECONDARY A/C PACK ASSEMBLY 2215250-1 MOS 177.97 08-OCT-1999 21.070 48-204 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-03 (2) RIGHT SECONDARY NC PACK ASSEMBLY 2215280-1 MOS 177.97 08-OCT-1999 21.080 48-240 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-03 (3) LEFT PRIMARY NC PACK ASSEMBLY 2215240-1 MOS 177.97 08-OCT-I999 21.070 48-227 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 15 Of 315 O CAMP SYSTEMS EFTA00619054
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT PART/SERIAL INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 21-51-03(4) 21.080 RIGHT PRIMARY NC PACK ASSEMBLY 2215290-1 MOS 48-194 HRS/MSC REF: AFL 0/C TSN:44 TSN:38 177.97 3753 922 08-OCT-1999 44 38 21-51-03 (5) LEFT SECONDARY HEAT EXCHANGER 182820-3 MOS SN-UNKNOWN HRSAISC CNC 3753:19 0 REF: AFL 21-51-03 (6) RIGHT SECONDARY HEAT EXCHANGER 182820-3 MOS SN-UNKNOWN HRS/MSC 0/C 3753:19 0 REF: AFL 21-51-03 (7) LEFT PRIMARY HEAT EXCHANGER 182820-3 MOS SN-UNKNOWN HRS/MSC OiC 3753:19 0 REF: AFL 21-51-03 (8) RIGHT PRIMARY HEAT EXCHANGER 182820-3 MOS SN-UNKNOWN HRS/MSC VC 3753:19 0 REF: AFL 21-51-04 (1) LEFT AIR CYCLE MACHINE 2206400-2 MOS TSN:0 177.97 08-OCT-1999 21.010 SN-UNKNOWN HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-04 (2) RIGHT AIR CYCLE MACHINE 2206400-2 MOS TSN:0 177.97 08-OCT-1999 21.010 SN-UNKNOWN HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-05(1) LEFT WATER SEPARATOR 183010-4 MOS 160.43 24-MAR-2001 21.210 48-3438 HRS/MSC 0/C 3074:19 679 REF: AFL 739 183 21-51-05 (2) RIGHT WATER SEPARATOR 183010-4 MOS 160.43 24-MAR-2001 21.210 48-3448 HRSAiSC VC 3074:19 679 REF: AFL 739 183 21-51-07(1) LEFT AIR CONDITIONING CHECK VALVE 123268-1-1 MOS 177.97 08-OCT-1999 21.370 7156 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-07 (2) RIGHT AIR CONDITIONING CHECK VALVE 123268-1-1 MOS 177.97 08-OCT-1999 21.370 7163 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (Ern-Estimated Base Time I.-Estimated Due (New Requirement) (EFF)-Effective CM (f) CAMP SYSTEMS 16 Of 315 EFTA00619055
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL PART/SERIAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 21-51-09 0) 21.330 21-51-09 (2) LEFT LOW PRESSURE WATER SYSTEM MIX MUFF 2215625-1 MOS 78-313 FIRS/ MSC Or/C REF: AFL RIGHT LOW PRESSURE WATER SYSTEM MIX MUFF TSN:44 TSN:38 177.97 3753 922 08-OCT-1999 44 38 2215625-1 MOS 177.97 08-OCT-1999 21.330 78-315 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-20(1) LEFT RAM AIR CONTROLLER 607518-2 MOS 177.97 08-OCT-1999 21.220 048C-6190 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-20(2) RIGHT RAM AIR CONTROLLER 607518-2 MOS 177.97 08-OCT-1999 21.220 048C-6191 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-21 (1) LEFT RAM AIR INLET ACTUATOR 541674-4 MOS 177.97 08-OCT-1999 21.270 107-7186 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-21 (2) RIGHT RAM AIR INLET ACTUATOR 541674-4 MOS 177.97 08-OCT-1999 21.270 48-7449 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-30O) LEFT TEMPERATURE VALVE 321942-1-1 MOS 177.97 08-OCT-1999 21.490 9502 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-30(2) RIGHT TEMPERATURE VALVE 321942-1-1 MOS 177.97 08-OCT-1999 21.490 9510 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-31 (1) LEFT LOW LIMIT (35 DEGREE F) TEMPERATURE CONTROLLER 607510-3 MOS 177.97 08-OCT-1999 21.470 048C-9470 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-31 (2) RIGHT LOW LIMIT (35 DEGREE F) TEMPERATURE CONTROLLER 607510-3 MOS 177.97 08-OCT-1999 21.470 048C-9472 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-32(1) LEFT TEMPERATURE SENSOR 627570-1 MOS 177.97 08-OCT-1999 21.480 048C-12936 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 17 Of 315 EFTA00619056
CAMP Ana/no/in Onnesiday Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 21-51-32(2) RIGHT TEMPERATURE SENSOR 627570-I MOS 177.97 08-OCT-1999 21.480 038C-12851 HRSAiSC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-41 (1) LEFT TURBINE INLET OVERHEAT SWITCH 572757-I MOS 177.97 08-OCT-1999 21.230 7786 HRSAISC Cl/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-41 (2) RIGHT TURBINE INLET OVERHEAT SWITCH 572757-1 MOS 177.97 08-OCT-1999 21.230 7781 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-50 (I) LEFT RAM AIR CONTROL TEMPERTURE SENSOR 617166-1 MOS 177.97 08-OCT-1999 21.310 078C-12690 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-50(2) RIGHT RAM AIR CONTROL TEMPERTURE SENSOR 617166-1 MOS 177.97 08-OCT-1999 21.310 048C-12554 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 21-51-65 AIR CONDITIONING MODULE 69-37319-308 MOS 90.83 12-JAN-2007 D03379 HRSAISC Or/C 939:11 2814:08 REF: AFL 255 667 21-61-01 CABIN TEMPERATURE CONTROLLER 5483764 MOS 177.97 08-OCT-1999 21.600 068C-10403 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 2141-02 (I) LEFT DUAL MIX VALVE 398116-1-1 MOS 177.97 08-OCT-1999 21.320 6373 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2141-02 (2) RIGHT DUAL MIX VALVE 398116-1-1 MOS 177.97 08-OCT-1999 21.320 6399 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2141-03 (I) LEFT HOT AIR CHECK VALVE 123266-1-1 MOS 177.97 08-OCT-1999 21.360 11492 HRS/MSC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2141-03 (2) RIGHT HOT AIR CHECK VALVE 123266-1-1 MOS 177.97 08-OCT-1999 21.360 11494 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 18 Of 315 O CAMP SYSTEMS EFTA00619057
CAMP t Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 21-61-07 (1) 21.590 2141-07 (2) CONTROL CABIN TEMPERATURE SELECTOR 607000-1-1 MOS 058C-6881 HRSYMSC 0./C TSN:44 REF: AFL TSN:38 PASSENGER CABIN TEMPERATURE SELECTOR 177.97 3753 922 08-OCT-1999 44 38 607400-1-1 MOS 90.83 12-JAN-2007 21.590 019C-4523 HRSYMSC 0/C 939:11 2814:08 REF: AFL 255 667 2141-20 0) NO.1 PACK2ONE TEMPERATURE CONTROLLER 7121-19971-OIAB MOS 70.03 06-OCT-2008 21.025 9811907 HRS/MSC 0/C 464:24 3288:55 REF: AFL 135 787 2141-20 (2) NO. 2 PACK2ONE TEMPERATURE CONTROLLER 7121-19971-OIAB MOS 70.03 06-OCT-2008 21.025 9819595 HRSAISC 0./C 464:24 3288:55 REF: AFL 135 787 21-61-32 CABIN TEMPERATURE INDICATOR 162BL902 MOS 177.97 08-OCT-1999 21.570 A1223 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 21-61-330) LEFT AIR MIX INDICATOR 154LUA104 MOS 177.97 08-OCT-1999 21.510 98090478 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 2141-33 (2) RIGHT AIR MIX INDICATOR 154LUA104 MOS 177.97 08-OCT-1999 21.510 98090477 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 2141-350) CABIN TEMPERATURE MODULE ASSEMBLY 69-37324-18 MOS 177.97 08-OCT-1999 21.580 D02768 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 21 -BBJ-01 (s) INSPECT AND CLEAN OR REPLACE THE LEFT HAND NC COALESCER BAG PKG PKG 12.31 .32 .33 MOS 12 13.13 03-JUL-2013 21.620 HRSAISC 29:58 3723:21 REF: BTC 21-B8J-01-01 AFL 14 908 21 -BBJ-02 (s) INSPECT AND CLEAN OR REPLACE THE RIGHT HAND NC COALESER BAG PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 21.625 HRSAISC 29:58 3723:21 REF: BTC 21-BBJ-02-01 AFL 14 908 212102 EQUIPMENT CHECK VALVE 2810015-101 MOS 177.97 08-OCT-1999 21.100 4134 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 19 Of 315 EFTA00619058
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 IRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 213026 21.400 216080 CABIN ALMUDE/RATE OF CLIMB MODULE 69-37334-12 MOS D02616 HRSYMSC REF: AFL CABIN PRESSURE MODULE PN MOS SN-UNKNOWN HRSAiSC REF: AFL Or/C Or/C TSN:44 TSN:38 177.97 3753 922 3753:19 08-OCT-1999 44 38 0 CHAPTER 22 AUTO FLIGHT 22-11-11 (1) LEFT ELEVATOR TRANSDUCER GM5341-7 MOS 177.97 08-OCT-1999 22.150 4923 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-11 (2) RIGHT ELEVATOR TRANSDUCER GM5341-7 MOS 177.97 08-OCT-1999 22.150 4926 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-14 ELEVATOR NEUTRAL SENSOR H5058 MOS 177.97 08-OCT-1999 27.165 77281 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-24 MACH TRIM ACTUATOR 2A72068 MOS 177.97 08-OCT-1999 22.050 80181 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-25(1) INBOARD AILERON ACTUATOR 158300-101 MOS 177.97 08-OCT-1999 27.390 8639 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-25 (2) OUTBOARD AILERON ACTUATOR 158300-101 MOS 177.97 08-OCT-1999 27.390 8600 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-26(1) B AUTOPILOT ELEVATOR ACTUATOR 158300-101 MOS 177.97 08-OCT-1999 27.045 8748 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-26 (2) A AUTOPILOT ELEVATOR ACTUATOR 158300-101 MOS 177.97 08-OCT-1999 27.045 8601 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 74nsufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 20 Of 315 EFTA00619059
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL PART/SERIAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 22-11-27 (1) AUTOPIOLT SYSTEM NO 4 SPOILER POSITION TRANSMITTER PN MOS SN-UNKNOWN HRS1MSC 0/C 3753:19 0 REF: AFL 22-11-27 (2) AUTOPIOLT SYSTEM NO 9 SPOILER POSITION TRANSMITTER PN MOS TSN:0 177.97 08-OCT-1999 27.856 SN-UNKNOWN HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-30 ELEVATOR POSITION SENSOR H5048 MOS 177.97 08-OCT-1999 27.010 78164 HRS1MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-31 (1) UPPER STABILIZER POSITION SENSOR H5048 MOS 177.97 08-OCT-1999 27.640 78646 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-31 (2) LOWER STABILIZER POSITION SENSOR H5048 MOS 177.97 08-OCT-1999 27.640 78095 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-32(1) CAPTAIN AUTOFLIGHT ANNUNCIATOR D434-56-00I MOS 177.97 08-OCT-1999 22.070 3551/05-98 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-32 (2) FIRST OFFICER AUTOFLIGHT ANNUNCIATOR D434-56-00I MOS 177.97 08-OCT-1999 22.070 3573/05-98 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-33(1) NO. I FLIGHT CONTROL COMPUTER 4082499-902 MOS 177.97 08-OCT-1999 22.270 98080506 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-33 (2) NO. 2 FLIGHT CONTROL COMPUTER 4082499-902 MOS 177.97 08-OCT-1999 22.270 98080508 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-34 DFCS MODE CONTROL PANEL 4082260-939 MOS 177.97 08-OCT-1999 22.060 98071464 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-37 INTERGRATED FLIGHT SYSTEM ACCESSORY MODULE 65-52820-2 MOS 177.97 08-OCT-I999 22.305 D01300 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 21 Of 315 EFTA00619060
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT PART/SERIAL INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 22-11-40(1) 22.090 22-11-40 (2) AUTOPILOT SYSTEM A (LOWER SWITCH) ELEVATOR PRESSURE SWITCH 2I1C223-278 MOS W02866 HRSYMSC 0./C TSN:44 REF: AFL TSN:38 AUTOPILOT SYSTEM B (UPPER SWITCH) ELEVATOR PRESSURE SWITCH 177.97 3753 922 08-OCT-1999 44 38 2I1C223-278 MOS 177.97 08-OCT-1999 22.090 W02690 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-40 (3) AUTOPILOT SYSTEM A AILERON PRESSURE SWITCH 211C223-527 MOS 177.97 08-OCT-1999 22.100 W02796 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-11-40 (4) AUTOPILOT SYSTEM 8 AILERON PRESSURE SWITCH 211C223-527 MOS 177.97 08-OCT-1999 22.100 V01702 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-31-10 AUTOTHROTTLE COMPUTER 760SUE1- I MOS 177.97 08-OCT-1999 22.110 AT00279 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-31-91(1) LEFT AUTOTHROTTLE SERVO MOTOR 2P305RAA1 MOS 177.97 08-OCT-1999 22.120 AS00504 HRSAiSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 22-31-91 (2) RIGHT AUTOTHROTTLE SERVO MOTOR 2P305RAAI MOS 177.97 08-OCT-1999 22.120 AS00514 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 221071 SURFACE POSITION INDICATOR 253884 MOS 177.97 08-OCT-1999 22.080 98081524A HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 223120 AUTO-THROTTLE LH SWITCH PACK 254A1150-13 MOS 41.53 21-FEB-2011 NSN HRSAISC 0./C 227:43 3525:36 REF: AFL 65 857 224020 RIGHT CUTOUT SWITCH ASSEMBLY PN MOS SN-UNKNOWN FIRS/MSC 0/C 3753:19 0 REF: AFL 224025 FCC OPS DISK PN MOS SN-UNKNOWN HRSIMSC 0/C 3753:19 0 REF: AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effeclive CM O CAMP SYSTEMS 22 Of 315 EFTA00619061
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 224030 RIGHT POSITION TRANSMITTER PN MOS SN-UNKNOWN HRS1MSC 0/C 3753:19 0 REF: AFL 224035 SYNCHRO TRANSMITTER U221557 MOS SN-UNKNOWN HRSAISC O/C 3753:19 0 REF: AFL 224040 LEFT DRUM ASSEMBLY TRANSMITTER U221557 MOS SN-UNKNOWN HRSAISC O/C 3753:19 0 REF: AFL 224045 RIGHT TRANSFER TRANSMITTER U221557 MOS SN-UNKNOWN FIRS/MSC O/C 3753:19 0 REF: AFL 224050 LEFT COLUMN TRANSMITTER U221557 MOS SN-UNKNOWN HRS1MSC 3753:19 0 REF: AFL 224055 RIGHT CUTOUT TRANSMITTER U221557 MOS SN-UNKNOWN FIRS/MSC 0/C 3753:19 0 REF: AFL 226001 FLT CONTL COMP OPS SOFTWARE PN MOS 71.5 22-AUG-2008 SN-UNKNOWN FIRS/MSC O/C 492:31 3260:48 REF: AFL 140 782 226002 FCC OPS SOFTWARE SOFTWARE PN MOS 71.5 22-AUG-2008 SN-UNKNOWN HRSAISC 0/C 492:31 3260:48 REF: AFL 140 782 CHAPTER 23 COMMUNICATIONS * 23-030-00 (s) FUNCTIONAL CHECK OF RESISTANCE OF STATIC DISCHARGERS PKG PKG 32 .33 MOS 72 35.27 29-AUG-2011 23.060 FIRS/MSC 219:47 3533:32 REF: BTC 23-030-00-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-EffecUve CM O CAMP SYSTEMS 23 Of 315 EFTA00619062
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE PART/SERIAL ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING • 23-040-00 (s) OPERATIONAL CHECK OF THE VOICE RECORDER AND RECORDER INDEPENDENT POWER SUPPLY (RIPS) (IF INSTALLED). PKG PKG 12 .31 .32 .33 MOS 13.13 03-JUL-2013 23.070 HRS/MSC 300 29:58 3723:21 REF: BTC 23-040-00-01 AFL 14 908 + 23-050-00 FUNCTIONAL CHECK OF THE VOICE RECORDER FOR AUDIO FIDELITY MOS 24 9.23 30-OCT-2013 30-OCT-2015 449d 23.080 HRSAISC 24:26 3728:53 REF: BTC 23-050-00-01 AFL II 911 23-060-00 OPERATIONAL CHECK OF THE ULB MOS 24 9.23 30-OCT-2013 30-OCT-2015 449d 23.090 HRS/MSC 24:26 3728:53 REF: BTC 23-060-00-01 AFL 11 911 23-070-00 REPLACE THE ULB BATTERY AT VENDORS RECOMMENDATION MOS 56.17 02-DEC-2009 31-DEC-2014 IA 146d 23.090 HRSAISC DUE 351 3402:19 REF: BTC 23-070-00-01 AFL 98 824 23-080-00 OPERATIONAL CHECK OF OXYGEN MASK MICROPHONE MOS 177.97 08-OCT-1999 23.010 HRS/MSC 4000 3709:19 44 4044 290:41 REF: BTC 23-080-00-01 AFL 884 38 + 23-090-00 OPERATIONAL CHECK OF THE PASSENGER ADDRESS SPEAKERS MOS 177.97 08-OCT-1999 23.100 HRSAiSC 10000 3709:19 44 10044 6290:41 REF: BTC 23-090-00-01 AFL 884 38 23-100-00 OPERATIONALLY CHECK (FIXED) EMERGENCY LOCATOR TRANSMITTER VENDOR RECOMMENDATION MOS 23.67 17-AUG-2012 23.020 HRS/MSC NR 98:10 3655:09 REF: BTC 23-100-00-01 AFL 34 888 23-11-21 (1) NO. I HF COMM TRANSCEIVER 822-0330-001 MOS 177.97 08-OCT-1999 23.150 113580 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-11-21 (2) NO. 2 HF COMM TRANSCEIVER 822-0330-001 MOS 177.97 08-OCT-1999 23.150 112867 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-11-61 (1) NO. I HF ANTENNA COUPLER 822-0987-002 MOS 177.97 08-OCT-1999 23.160 721 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-11-61 (2) NO. 2 HF ANTENNA COUPLER 822-0987-002 MOS 177.97 08-OCT-I 999 23.160 1005 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 24 Of 315 O CAMP SYSTEMS EFTA00619063
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING 23-110-00 (001.0) (AUTOMATICIF IXED) EMERGENCY LOCATOR TRANSMITTER 453-5004 MOS 23.67 17-AUG-2012 23.020 10966 HRSYMSC 98:10 3655:09 REF: AFL 34 888 23-110-00 (001.1) DISCARD (AUTOMATIC/FIXED) EMERGENCY LOCATOR TRANSMITTER BATTERY DISCARD MOS 53.7 16-FEB-2010 28-FEB-2015 M 205d 23.020 HRSAISC DUE 335:28 3417:51 REF: BTC 23-110-00-01 AFL 93 829 23-110-00 (FM 91.207) (s) INSPECT (FIXED) EMERGENCY LOCATOR TRANSMITTER IAW FM 91.207(0) PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 HRS/MSC 29:58 3723:21 REF: FAR 91.207 (D) AFL 14 908 23-12-11 (1) NO. I VHF ANTENNA DMC50-17 MOS 177.97 08-OCT-1999 23.140 15239 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-12-11 (2) NO. 2 VHF ANTENNA DMC50-17 MOS 177.97 08-OCT-1999 23.140 14931 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-12-11 (3) NO. 3 VHF ANTENNA DMC50-17 MOS 177.97 08-OCT-1999 23.140 15027 HRSYMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-12-21 (1) NO. I VHF COMMUNICATION TRANSCEIVER 822-1047-003 MOS 177.97 08-OCT-1999 23.130 4151 HRSYMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-12-21 (2) NO. 2 VHF COMMUNICATION TRANSCEIVER 822-1047-003 MOS 177.97 08-OCT-1999 23.130 4437 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-12-21 (3) NO. 3 VHF COMMUNICATION TRANSCEIVER 822-1047-003 MOS 177.97 08-OCT-1999 23.130 4431 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-12-41 (1) LEFT RADIO TUNING PANEL G7404-04 MOS 177.97 08-OCT-1999 23.110 1018 HRS/MSC 0/C 3730:19 23 REF: AFL 901 21 23-12-41 (2) RIGHT RADIO TUNING PANEL G7404-04 MOS 178.8 13-SEP-1999 23.110 1010 HRS/MSC 0/C 3730:19 23 REF: AFL 901 21 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 25 Of 315 EFTA00619064
C4A4IP Status Report 737-72UB3 REVISION 21 S/N 29273 (YGOO6) (VP-B63): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: O7-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 23-12-41 (3) CENTER RADIO TUNING PANEL G7404-04 MOS 177.97 08-OCT-1999 23.110 1020 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-28-11 SELCAL DECODER 1200008-000 MOS 177.97 08-OCT-1999 23.220 861 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-30-00 (1) UE2033J SWITCH PANEL 1678-1-12 MOS TSR:0 26.7 16-MAY-2012 16053 HRSIMSC O/C TSR:0 118:54 3634:25 REF: AFL TSR:0 40 882 23-30-00 (2) UE2039J SWITCH PANEL 1678-1-16 MOS TSR:0 16.6 19-MAR-2013 16071 HRSAISC O/C TSR:0 51:06 3702:13 REF: AFL TSR:0 25 897 23-30-00 (3) UE2006J SWITCH PANEL 1678-1-7 MOS TSR:0 26.7 16-MAY-2012 16109 HRSIMSC 0/C TSR:0 118:54 3634:25 REF: AFL TSR:0 40 882 23-30-00 (4) RH DIVAN. AFT SWITCH PANEL 1678-1-12 MOS TSR:0 26.7 16-MAY-2012 16062 HRSAISC 0./C TSR:0 118:54 3634:25 REF: AFL TSR:0 40 882 23-31-01 PASSENGER ADDRESS AMPLIFIER 622-4096-001 MOS 86.2 0I-JUN-2007 23.250 8062 HRSIMSC 0/C 797:55 2955:24 REF: AFL 231 691 23-31-06 TAPE REPRODUCER RDAX7308-01 MOS 177.97 08-OCT-1999 23.240 142077 HRSAISC 0!C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-42-01 CABIN INTERFONE HANDSET 285W0024-18 MOS 177.97 08-OCT-1999 23.260 D03515 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-51-01 REMOTE ELECTRONIC UNIT 5140-1-6 MOS 177.97 08-OCT-1999 23.050 2415 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-51-02 (1) LEFT AUDIO SELECTOR PANEL 5145-1-77 MOS 71.5 22-AUG-2008 23.025 6345 HRSIMSC 0/C 492:31 3260:48 REF: AFL 140 782 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (E87)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 26 Of 315 EFTA00619065
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 23-51-02(2) CENTER AUDIO SELECTOR PANEL 5145-1-77 MOS TSN:0 177.97 08-OCT-1999 23.025 6581 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-51-02 (3) RIGHT AUDIO SELECTOR PANEL 5145-1-77 MOS TSR:3 5.83 12-FEB-2014 23.025 8889 HRS/MSC 0/C TSR:0 9:45 3743:34 REF: AFL TSR:0 5 917 23-51-03 (1) CAPTAINS LOUD SPEAKER ASSEMBLY 5142-1 MOS 177.97 08-OCT-1999 23.190 4023 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-51-03 (2) FIRST OFFICERS LOUD SPEAKER ASSEMBLY 5142-1 MOS 177.97 08-OCT-1999 23.190 4409 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-51-51 (3) HAND MIC 903-1341 MOS 177.97 08-OCT-1999 23.290 N/SN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-71-11 COCKPIT VOICE RECORDER 2100-1020-00 MOS 177.97 08-OCT-1999 23.170 00256 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-71-12 COCKPIT VOICE RECORDER CONTROL PANEL S152-0020-00 MOS 177.97 08-OCT-1999 23.300 00249 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 23-71-21 COCKPIT VOICE RECORDER LOCATOR BEACON DK 120 MOS 56.17 02-DEC-20:/9 23.180 SC58436 HRSYMSC 0./C 351 3402:19 REF: AFL 98 824 231010 TELELINK ROUTER MANAGEMENT UNIT (TRMU) 8400021-30-B MOS 99.3 28-APR-2006 00379 FIRS/MSC 0./C 1147:01 2606:18 REF: AFL 296 626 231011 AFT CARGO RF-600 RADIO FREQUENCY UNIT 7516240-60050 MOS 9.23 30-OCT-2013 99041311 HRSAISC 0./C 24:26 3728:53 REF: AFL 11 911 233000 NV DISTRIBUTION UNIT 1025-1-3 MOS TSR:0 35.27 29-AUG-2011 9847001 HRS/MSC 0/C TSR:0 219:47 3533:32 REF: AFL TSR:0 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 27 Of 315 EFTA00619066
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 233002 #2 AN DISTRIBUTION UNIT 1025-1-3 MOS TSR:0 26.7 16-MAY-2012 115 HRS/MSC 0/C TSR:0 118:54 3634:25 REF: AFL TSR:0 40 882 234001 CAPTAIN S BOOM MIC HEADSET 64000-702 MOS 177.97 08-OCT-1999 23.270 N/SN HRSAISC CNC TSN:44 3753 44 REF: AFL TSN:38 922 38 234002 FIRST OFFICERS BOOM MIC HEADSET 64000-702 MOS 177.97 08-OCT-1999 23.270 NiSN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 234003 3RD CREW HEADPHONE 20046-I MOS 177.97 08-OCT-1999 23.280 N/SN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 237001 AFT CARGO SD-600 SATCOM SDU 7516100-60050 MOS 9.23 30-OCT-2013 99041937 HRS1MSC 0/C 24:26 3728:53 REF: AFL 11 911 237001(01) (a) REPLACE AFT CARGO SD-60D SATCOM SDU CORDED TELEPHONE BATTERY PKG 7516100-60050 PKG 31 .32 .33 MOS 36 99041937 HRSAISC REF: AFL 237002 SATCOM HIGH GAIN ARRAY ANTENNA 8185804 MOS 98.87 11-MAY-2006 46 HRSAiSC 1134:09 2619:10 REF: AFL 293 629 CHAPTER 24 ELECTRICAL POWER + 24-010-01 CHANGE LEFT INTEGRATED DRIVE GENERATOR LEFT IDG OIL 761574 MOS 71.5 22-AUG-2008 24.120 0034 HRS/MSC 1600 492:31 3260:48 4860:48 1107:29 REF: BTC 24-010-01-01 AFL 140 782 + 24-010-02 CHANGE RIGHT INTEGRATED DRIVE GENERATOR RIGHT IDG OIL 761574 MOS 71.5 22-AUG-2008 24.121 0358 HRSAISC 1600 492:31 3260:48 4860:48 1107:29 REF: BTC 24-010-02-01 AFL 140 782 + 24-020-01 DETAIL INSPECTION LEFT INTEGRATED DRIVE GENERATOR OF LEFT IDG DELTA P INDICATOR 761574 MOS 23.67 17-AUG-2012 24.140 0034 HRSAISC 400 98:10 3655:09 4055:09 301:50 REF: BTC 24-020-01-01 AFL 34 888 + 24-020-02 DETAIL INSPECTION RIGHT INTEGRATED DRIVE GENERATOR OF RIGHT IDG DELTA P INDICATOR 761574 MOS 23.67 17-AUG-2012 24.150 0358 HRSAISC 400 98:10 3655:09 4055:09 301:50 REF: BTC 24-020-02-01 AFL 34 888 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 28 Of 315 EFTA00619067
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE PART/SERIAL ADJ TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 24-030-01 DETAIL INSPECTION LEFT INTEGRATED DRIVE GENERATOR OF LEFT IDG OIL LEVEL 761574 MOS 23.67 17-AUG-2012 24.160 0034 HRSAISC 400 98:10 3655:09 4055:09 301:50 REF: BTC 24-030-01-01 AFL 34 888 + 24-030-02 DETAIL INSPECTION RIGHT INTEGRATED DRIVE GENERATOR OF RIGHT IDG OIL LEVEL 761574 MOS 23.67 17-AUG-2012 24.170 0358 HRSAISC 400 98:10 3655:09 4055:09 301:50 REF: BTC 24-030-02-01 AFL 34 888 + 24-040-01 REPLACE LEFT IDG CHARGE/SCAVENGE FILTERS MOS 71.5 22-AUG-2008 24.180 HRS./MSC 1600 492:31 3260:48 4860:48 1107:29 REF: EITC 24-040-01-0I AFL 140 782 + 24-040-02 REPLACE RIGHT IDG CHARGE/SCAVENGE FILTERS MOS 71.5 22-AUG-2008 24.190 FIRSOASC 1600 492:31 3260:48 4860:48 1107:29 REF: BTC 24-040-02-01 AFL 140 782 + 24-050-01 TORQUE CHECK LEFT INTEGRATED DRIVE GENERATOR QUICK ATTACH/DETACH 762246 MOS 71.5 22-AUG-2008 24.200 0334 HRS./MSC 1600 492:31 3260:48 4860:48 1107:29 REF: BTC 24-050-01-01 AFL 140 782 + 24-050-02 TORQUE CHECK RIGHT INTEGRATED DRIVE GENERATOR QUICK ATTACH/DETACH 762246 MOS 71.5 22-AUG-2008 24.210 0333 HRSYMSC 1600 492:31 3260:48 4860:48 1107:29 REF: BTC 24-050-02-01 AFL 140 782 + 24-100-00 (s) OPERATIONAL CHECK OF THE STANDBY POWER CONTROL UNIT (SPCU). PKG PKG 1 MOS 1 1.8 13-JUN-2014 24.220 HRS./MSC 3:37 3749:42 REF: BTC 24-100-00-01 AFL 2 920 24-11-11 (1) LEFT INTEGRATED DRIVE GENERATOR 761574 MOS 177.97 08-OCT-1999 24.030 0034 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-11-11 (2) RIGHT INTEGRATED DRIVE GENERATOR 761574 MOS 177.97 08-OCT-1999 24.030 0358 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 24-11-21 (1) LEFT INTEGRATED DRIVE OIL COOLER UA538551-3 MOS 177.97 08-OCT-1999 24.130 0064 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 24-11-21 (2) RIGHT INTEGRATED DRIVE OIL COOLER UA538551-3 MOS 177.97 08-OCT-1999 24.130 0080 HRS./MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effeclive CM 29 Of 315 O CAMP SYSTEMS EFTA00619068
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE PART/SERIAL NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING 24-11-61 (1) LEFT INTEGRATED DRIVE GENERATOR QUICK ATTACH/DETACH 762246 MOS 177.97 08-OCT-1999 24.040 0334 HRSYMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-11-61 (2) RIGHT INTEGRATED DRIVE GENERATOR QUICK ATTACH/DETACH 762246 MOS 177.97 08-OCT-1999 24.040 0333 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 + 24-110-00 CHECK THE REMOTE CONTROL CIRCUIT BREAKER (FOR DUAL BATTERY INSTALLATION) MOS 177.97 08-OCT-1999 24.230 HRS/MSC 3709:19 44 REF: BTC 24-110-00-CH AFL 10000 884 38 10038 9116 + 24-120-00 (001.0) MAIN BATTERY 539CH-1 MOS TSO:1 5.83 12-FEB-2014 24.240 0905200103220 HRSAISC GM TSOO 9:45 3743:34 REF: AFL TSOO 5 917 24-120-00(001.1) RESTORE MAIN BATTERY RESTORE 539CH-I MOS 6 6.47 23-JAN-2014 234UL-2014 <CC. 24.240 0905200103220 HRSAISC REF: BTC 24-120-00-CH AFL + 24-120-00 (002.0) AUXILIARY BATTERY 539CH-1 MOS TSO:1 5.83 12-FEB-2014 24.240 09052000364DC HRSAISC GM TSOO 9:45 3743:34 REF: AFL TSOO 5 917 24-120-00 (002.1) RESTORE AUXILIARY BATTERY RESTORE 539CH-I MOS 6 6.47 23-JAN-2014 23-JUL-2014 <CC 24.240 09052000364DC HRS/MSC REF: EITC 24-120-00-CH AFL 24-130-00 (s) FUNCTIONAL CHECK OF THE EXTERNAL POWER RECEPTACLE PINS FOR EXCESSIVE WEAR PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 HRSAISC 219:47 3533:32 REF: BTC 24-130-00-01 AFL 59 863 24-140-00 (s) DETAILED INSPECTION OF THE EXTERNAL POWER RECEPTACLE PINS FOR SINGS OF OVERHEAT AND SECURITY PKG OF INSTALLATION. PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 HRSAISC 219:47 3533:32 REF: BTC 24-140-00-01 AFL 59 863 24-21-21 (1) P91 POWER PANEL PN MOS SN-UNKNOWN HRSYMSC O/C 3753:19 0 REF: AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 30 Of 315 EFTA00619069
C4IMA.anP "In. Mr gnad wp' Status Report 737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-B63): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT PART/SERIAL INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 24-21-21 (2) P92 POWER PANEL PN MOS SN-UNKNOWN HRS,MSC 0./C 3753:19 0 REF: AFL 24-21-51 GENERATOR/APU AC SYSTEM MODULE 233A3204-1 MOS 177.97 08-OCT-1999 24.020 D00181 HRS,MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-21-52 GENERATOR DRIVE/STANDBY MODULE 233A3205-2 MOS 95.63 18-AUG-2006 24.010 D00014 HRS,MSC 0/C 1119:29 2633:50 REF: AFL 289 633 24-21-53 ELECTRIC METER MODULE 285A1840-4 MOS 177.97 08-OCT-1999 24.060 D00190 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-21-81 (1) LEFT GENERATOR CONTROL UNIT 762185E MOS TSN:0 151.53 21-DEC-2031 24.270 517 HRSIMSC 0/C TSN:0 2866 887 REF: AFL TSN:0 690 232 24-21-81 (2) RIGHT GENERATOR CONTROL UNIT 762185E MOS 177.97 08-OCT-1999 24.270 0492 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-31-21 MAIN BATTERY CHARGER 8-930-03 MOS 177.97 08-OCT-1999 24.300 C525 HRS,MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-31-31 AUXILIARY BATTERY CHARGER 8-930-03 MOS 177.97 08-OCT-1999 24.310 C526 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-32-11 (1) NO. I TRANSFORMER/RECTIFIER 080-20705-01 MOS 177.97 08-OCT-1999 24.250 0516 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-32-11 (2) NO. 2 TRANSFORMER/RECTIFIER 080-20705-01 MOS 177.97 08-OCT-1999 24.250 0514 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 24-32-11 (3) NO. 3 TRANSFORMER/RECTIFIER 080-20705-01 MOS 177.97 08-OCT-I999 24.250 0517 HRS,MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 31 Of 315 EFTA00619070
CAMP Anshayina Mnreinslar Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 24-34-11 STANDBY POWER CONTROL UNIT 11519524 MOS TSN:0 151.53 21-DEC-2001 24.330 079C-0864 HRSAISC 0/C TSN:0 2866 887 REF: AFL TSN:0 690 232 24-34-21 24V/115V STATIC INVERTER 1-002-0102-1000 MOS 177.97 08-OCT-1999 24.260 CJ001288 HRSAISC 0./C TSN:44 3753 44 REF: BLANK AFL TSN:38 922 38 24-41-21 BUS POWER CONTROL UNIT 762187F MOS 35.27 29-AUG-2011 24.320 115 HRS/MSC 0/C 219:47 3533:32 REF: AFL 59 863 240040 (s) PERFORM IDG OIL LEVEL SERVICEING PKG PKG 1 MOS 1 1.8 13-JUN-2014 HRSMSC 3:37 3749:42 REF: AFL 2 920 CHAPTER 25 EQUIPMENT/FURNISHINGS + 25-010-01 25.100 + 25-010-02 25.105 25-020-00 (s) 25.110 + 25-030-00 25.120 25-080-00 25.056 25-090-00 25.091 FUNCTIONAL CHECK THE HORIZONTAL ADJUSTMENT HOLES IN CAPTAIN SEAT TRACKS FOR ELONGATION AND VERIFY CAPTAIN SEAT TRACKS FOR WEAR. CONDITION AND SECURITY MOS 177.97 HRS/MSC 4003 3709:19 REF: BTC 25-010-01-01 AFL 884 FUNCTIONAL CHECK THE HORIZONTAL ADJUSTMENT HOLES IN FIRST OFFICER SEAT TRACKS FOR ELONGATION AND VERIFY FIRST OFFICER SEAT TRACKS FOR WEAR. CONDITION AND SECURITY MOS 177.97 HRS/MSC 4000 3709:19 REF: BTC 25-010-02-01 AFL 884 DETAIL INSPECTION OF THE CAPTAIN. FIRST OFFICER. FIRST OBSERVER AND SECOND OBSERVER (IF INSTALLED) SEAT HARNESSES. CROTCH STRAPS. AND SHOULDER BELTS (AS APPLICABLE) FOR WEAR. CONDITION AND SECURITY. PKG 12 .31 .32 .33 MOS 12 13.13 HRSAISC 29:58 REF: BTC 25-020-00-01 AFL 14 OPERATIONAL CHECK THE CAPTAIN. FIRST OFFICER. AND THE FIRST OBSERVER SEAT HARNESS INERTIA REELS MOS HRSYMSC REF: BTC 25-030-00-01 AFL 71.5 3500 492:31 140 INSPECT (DETAILED) THE ATTENDANT SEAT BOTTOMS FOR PROPER RETRACTION. CONDITION AND SECURITY MOS HRSAISC 4003 REF: BTC 25-080-00-01 AFL INSPECT (DETAILED) THE ATTENDANT SEAT HARNESS AND ATTACHMENTS W/O REMOVAL FOR WEAR. CONDITION. AND SECURITY. MOS HRSAISC 4003 REF: BTC 25-090-00-01 AFL 177.97 3709:19 884 177.97 3709:19 884 08-OCT-1999 44 38 08-OCT-1999 44 38 PKG 03-JUL-2013 3723:21 908 22-AUG-2008 3260:48 782 08-OCT-1999 44 38 08-OCT-1999 44 38 4044 4044 6760:48 4044 4044 290:41 290:41 3007:29 290:41 290:41 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effectlye CM O CAMP SYSTEMS 32 Of 315 EFTA00619071
Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 25-100-00 OPERATIONAL CHECK THE ATTENDANT SEAT HARNESS INERTIA REEL LOCK FEATURE. MOS 177.97 08-OCT-1999 25.010 HRSYMSC 4000 3709:19 44 4044 290:41 REF: BTC 25-100-00-01 AFL 884 38 25-11-01 (1) CAPTAIN SEAT ASSEMBLY 3A226-0007-0 1-1 MOS 177.97 08-OCT-1999 25.145 30773 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 25-11-01 (2) FIRST OFFICER SEAT ASSEMBLY 3A226-0008-0I-1 MOS 177.97 08-OCT-1999 25.145 30543 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 25-11-02(1) FIRST OBSERVER SEAT ASSEMBLY 1106-3AB MOS 177.97 08-OCT-1999 25.145 188 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 25-11-02 (2) SECOND OBSERVER SEAT ASSEMBLY 1097-1AA MOS 177.97 08-OCT-1999 25.585 SN-UNKNOWN HRSAASC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 25-11-22 (1) CAPTAIN MAP HOLDER 69-42136-29 MOS 177.97 08-OCT-1999 25.090 N/SN HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 25-11-22 (2) FIRST OFFICER MAP HOLDER 69-42136-29 MOS 177.97 08-OCT-1999 25.090 N/SN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 25-110-00 OPERATIONAL CHECK THE ATTENDANT SEAT HARNESS INERTIA REELS MOS 177.97 08-OCT-1999 25.150 HRSAISC 4000 3709:19 44 4044 290:41 REF: BTC 25-110-00-01 AFL 884 38 25-120-00 OPERATIONAL CHECK THE LAVATORY WASTE COMPARTMENT FLAPPER DOOR AND THE WASTE COMPARTMENT ACCESS DOOR LATCHING MECHANISM FOR WEAR. CONDITION. AND SECURITY. MOS 28.57 20-MAR-2012 25.020 HRSAISC 1000 143:27 3609:52 4609:52 856:33 REF: BTC 25-120-00-01 AFL 43 879 25-130-00 DETAILED INSPECTION THE LAVATORY WASTE COMPARTMENT FLAPPER DOOR AND THE WASTE COMPARTMENT ACCESS DOOR LATCHING MECHANISM FOR WEAR. CONDITION. AND SECURITY. MOS 28.57 20-MAR-2012 25.030 HRS/MSC 1000 143:27 3609:52 4609:52 856:33 REF: BTC 25-130-00-CH AFL 43 879 + 25-140-00 INSPECT (GENERAL VISUAL) THE STA 396 BULKHEAD PANELS FOR CONDITION AND SECURITY MOS 71.5 22-AUG-2008 25.163 HRSOASC 900 492:31 3260:48 4160:48 407:29 REF: BTC 25-140-00-01 AFL 140 782 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time •-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 33 Of 315 EFTA00619072
Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING + 25-150-00 (s) 25.168 INSPECT (GENERAL VISUAL) THE ELECTRONIC COMPARTMENT MOISTURE SHROUDS FOR OBVIOUS CRACKS/TEARS. CLOGGED DRAINS. CONDITION AND SECURITY PKG 31 .32 .33 REF: See Workcard MOS 36 MRS/MSC AFL PKG 35.27 29-AUG-2011 219:47 3533:32 59 863 + 25-160-00 (01) INSPECT (GENERAL VISUAL) THE CARGO COMPARTMENT FLOOR. CEIUNG. SIDEWALL. BULKHEAD. AND BLOWOUT (PRESSURE RELIEF) PANELS/LINERS FOR HOLESfTEARS. CONDITION. AND SECURITY. MOS 71.5 22-AUG-2008 25.188 HRSAiSC 900 492:31 3260:48 4160:48 407:29 REF: EITC 25-160-00-CH AFL 140 782 + 25-160-00 (02) INSPECT (GENERAL VISUAL) THE CARGO COMPARTMENT FLOOR. CEIUNG. SIDEWALL. BULKHEAD. AND BLOWOUT (PRESSURE RELIEF) PANELS/LINERS FOR HOLES/TEARS. CONDITION. AND SECURITY. MOS 25.177 MRS/MSC 900 REF: BTC 25-160-00-02 AFL + 25-170-00 (01) INSPECT (GENERAL VISUAL) THE FORWARD CARGO DOOR RESTRAINT SYSTEM FOR CONDITION AND SECURITY. 71.5 22-AUG-2008 492:31 3260:48 4160:48 407:29 140 782 MOS 177.97 08-OCT-1999 25.182 HRSYMSC 3709:19 44 REF: BTC 25-170-00-CH AFL 3500 884 38 3538 2616 + 25-170-00 (02) INSPECT (GENERAL VISUAL) THE AFT CARGO DOOR RESTRAINT SYSTEM FOR CONDITION AND SECURITY MOS 177.97 08-OCT-1999 25.183 MRS/MSC 3709:19 44 REF: BTC 25-170-00-02 AFL 3500 884 38 3538 2616 + 25-180-01(s) OPERATIONAL CHECK THE LEFT EMERGENCY EXIT HATCH ESCAPE STRAP PKG PKG 33 MOS 144 35.27 29-AUG-2011 25.193 HRSYMSC 219:47 3533:32 REF: EITC 25-180-01-CH AFL 59 863 + 25-180-02 (s) OPERATIONAL CHECK THE RIGHT EMERGENCY EXIT HATCH ESCAPE STRAP PKG PKG 33 MOS 144 35.27 29-AUG-201I 25.194 HRSAISC 219:47 3533:32 REF: BTC 25-180-02-CH AFL 59 863 + 25-190-01 (s) INSPECT (DETAILED) THE LEFT EMERGENCY EXIT HATCH ESCAPE STRAP FOR CONDITION AND SECURITY PKG PKG 33 MOS 144 35.27 29-AUG-2017 25.203 MRS/MSC 219:47 3533:32 REF: BTC 25-190-01-CH AFL 59 863 + 25-190-02 (s) INSPECT (DETAILED) THE RIGHT EMERGENCY EXIT HATCH ESCAPE STRAP FOR CONDITION AND SECURITY PKG PKG 33 MOS 144 35.27 29-AUG-2011 25.204 HRSAiSC 219:47 3533:32 REF: BTC 25-190-02-CH AFL 59 863 + 25-210-00 (s) INSPECT (DETAILED) THE FLIGHT COMPARTMENT ESCAPE LANYARDS (2) FOR CONDITION AND SECURITY PKG PKG 33 MOS 144 35.27 29-AUG-2011 25.208 HRS/MSC 219:47 3533:32 REF: BTC 25-210-00-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 34 Of 315 EFTA00619073
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING • 25-230-00 (01) (s) INSPECT (DETAILED) THE ENTRY AND SERVICE DOOR EMERGENCY ESCAPE SYSTEMS (AT ALL 4 DOORS) INCLUDING THE EMERGENCY ESCAPE SLIDE COMPARTMENTS AND THE ESCAPE SLIDE COMPONENTS WITHOUT REMOVING THE ESCAPE SLIDE FOR CONDITION AND SECURITY. PKG 31 .32 .33 MOS 36 25.215 HRS/MSC REF: BTC 25-230-00-01 AFL + 25-230-00 (02) (s) 25.216 + 25-230-00 (03) (s) 25.217 PKG 35.27 29-AUG-2011 219:47 3533:32 59 863 INSPECT (DETAILED) THE ENTRY AND SERVICE DOOR EMERGENCY ESCAPE SYSTEMS (AT ALL 4 DOORS) PKG INCLUDING THE EMERGENCY ESCAPE SLIDE COMPARTMENTS AND THE ESCAPE SLIDE COMPONENTS WITHOUT REMOVING THE ESCAPE SLIDE FOR CONDITION AND SECURITY. PKG 31 .32 .33 REF: BTC 25-230-00-02 MOS 36 HRS/MSC AFL 35.27 29-AUG-2011 219:47 3533:32 59 863 INSPECT (DETAILED) THE ENTRY AND SERVICE DOOR EMERGENCY ESCAPE SYSTEMS (AT ALL 4 DOORS) PKG INCLUDING THE EMERGENCY ESCAPE SLIDE COMPARTMENTS AND THE ESCAPE SLIDE COMPONENTS WITHOUT REMOVING THE ESCAPE SLIDE FOR CONDITION AND SECURITY. PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 HRSAISC 219:47 3533:32 REF: BTC 25-230-00-03 AFL 59 863 + 25-230-00 (04) (s) INSPECT (DETAILED) THE ENTRY AND SERVICE DOOR EMERGENCY ESCAPE SYSTEMS (AT ALL 4 DOORS) INCLUDING THE EMERGENCY ESCAPE SLIDE COMPARTMENTS AND THE ESCAPE SLIDE COMPONENTS WITHOUT REMOVING THE ESCAPE SLIDE FOR CONDITION AND SECURITY. PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 25.218 HRSYMSC 219:47 3533:32 REF: BTC 25-230-00-04 AFL 59 863 + 25-240-00 (001.0) FORWARD ENTRY ESCAPE SLIDE 5A3086-301 MOS TSO:1 9.23 30-OCT-2013 25.220 83F476 HRS/MSC Cl/C 24:26 3728:53 REF: AFL 11 911 25-240-00(001.1) RESTORE FORWARD ENTRY ESCAPE RESTORE SLIDE AT THE MANUFACTURERS RECOMMENDED INTERVAL. 5A3086-301 MOS 36 10.23 30-SEP-2013 30-SEP-2016 7850 B3F476 HRSAISC REF: BTC 25-240-00-CH AFL + 25-240-00 (002.0) FORWARD SERVICE ESCAPE SLIDE 5A3086-301 MOS TSO:1 9.23 30-OCT-2013 25.225 B3F481 HRSAISC Cl/C 24:26 3728:53 REF: AFL 11 911 25-240-00 (002.1) RESTORE FORWARD SERVICE ESCAPE SLIDE AT THE MANUFACTURERS RECOMMENDED INTERVAL. RESTORE 5A3086-301 MOS 36 10.23 30-SEP-2013 30-SEP-2016 7850 B3F481 HRSAISC REF: BTC 25-240-00-02 AFL + 25-240-00 (003.0) AFT ENTRY ESCAPE SLIDE 5A3088-301 MOS TSO:1 9.23 30-OCT-2013 25.230 83A333 HRSAISC Cl/C 24:26 3728:53 REF: AFL 11 911 74nsufficlent Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effecllve CM O CAMP SYSTEMS 35 Of 315 EFTA00619074
CAMPt Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING 25-240-00 (003.1) RESTORE AFT ENTRY ESCAPE SLIDE AT THE MANUFACTURERS RECOMMENDED INTERVAL. RESTORE 5A3088-301 MOS 36 10.23 30-SEP-2013 30-SEP-2016 785 d 83A333 HRSYSASC REF: BTC 25-240-00-03 AFL + 25-240-00 (004.0) AFT SERVICE ESCAPE SLIDE 5A3088-301 MOS TSO:1 9.23 30-OCT-2013 25.235 83A315 HRSYMSC 0./C 24:26 3728:53 REF: AFL 11 911 25-240-00 (004.1) RESTORE AFT SERVICE ESCAPE SLIDE AT THE MANUFACTURERS RECOMMENDED INTERVAL. RESTORE 5A3088-301 MOS 36 10.23 30-SEP-2013 30-SEP-2016 7850 83A315 HRS/MSC REF: BTC 25-240-00-04 AFL + 25-290-00 (002.1) RESTORE PASSENGER ADULT/CHILDMFANT LIFE JACKETS-VESTS MOS 120 TSI:9 58.3 28-SEP-2009 31-DEC-2018 IA 1607d 25.500 HRSAISC 375:15 3378:04 REF: BTC 25-290-00-0I AFL 110 812 25-300-00 (001.0) FORWARD LIFE RAFT INSPECT 5A3212-10121 MOS TS0:0 8.27 29-NOV-2013 25.335 12R100 HRSAISC 0./C TS0:0 23:49 3729:30 REF: AFL TS0:0 10 912 25-300-00(001.1) INSPECT FORWARD LIFE RAFT INSPECT 5A3212-10121 MOS 12 9.2 CH-NOV-2013 30-NOV-2014 IA 115a 12R 10O HRSAISC REF: BTC 25-300-00-01 AFL 25-300-00(002.0) AFT LIFE RAFT INSPECT 5A3212-10121 MOS 9.23 30-OCT-2013 25.335 12R099 HRS/MSC 0/C 24:26 3728:53 REF: AFL 11 911 25-300-00(002.1) INSPECT AFT LIFE RAFT INSPECT 5A3212-10121 MOS 12 10.23 30-SEP-2013 30-SEP-2014 54 a 12R099 HRS/MSC REF: BTC 25-300-00-01 AFL 25-300-00(003.0) NO. 3 LIFE RAFT INSPECT 5A3212-I0121 MOS 9.23 30-OCT-2013 25.335 12R098 HRSAISC 0./C 24:26 3728:53 REF: AFL 11 911 25-300-00(003.1) INSPECT NO. 3 LIFE RAFT INSPECT 5A3212-I0121 MOS 12 10.23 30-SEP-2013 30-SEP-2014 54 a 12R098 HRS/MSC REF: BTC 25-300-00-01 AFL 25-310-00 (s) VISUALLY CHECK THE LIFE RAFT PRESSURE BOTTLES FOR PROPER PRESSURE AT THE MANUFACTURERS RECOMMENDED INTERVAL MOS 12 71.5 22-AUG-2008 25.346 HRSAISC 492:31 3260:48 REF: BTC 25-310-00-01 AFL 140 782 74nsufficlent Infommtion +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time •-Estimated Due (New Requirement) (EFF)-Effective CM CAMP SYSTEMS 36 Of 315 EFTA00619075
CAMP t Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 IRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL ( ENH ) AFH LIMIT REMAINING 25-310-CO (001.1) 25-310-00 (002.1) 25-310-00 (003.1) + 25-370-00 25.395 25-380-00 25.401 25-390-00 RESTORE FORWARD LIFE RAFT PRESSURE BOTTLE SA321240121 12R100 REF: MOS 60 FIRS/ MSC AFL RESTORE NO. 2 LIFE RAFT PRESSURE BOTTLE 5A3212-10121 MOS 60 12R099 HRSAISC REF: AFL RESTORE NO. 3 LIFE RAFT PRESSURE BOTTLE 5A3212-10121 MOS 60 12R098 HRS/MSC REF: AFL 92 31-OCT-2013 31-OCT-2018 RESTORE 1546 d RESTORE 11.2 31-AUG-2013 31-AUG-2018 1485d RESTORE 11.23 30-AUG-2013 30-AUG-2018 1484 d VISUALLY CHECK ALL DETACHABLE EMERGENCY EQUIPMENT (GLOVES. SMOKE GOGGLES. CRASH AXE. FLASH LIGHTS. FIRST AID KITS. AND MEDICAL KITS. AS APPLICABLE) FOR CONDITION AND PRESENCE. MOS 24 HRSAiSC REF: BTC 25-370-00-01 AFL OPERATIONALLY CHECK THE EMERGENCY FLASHUGHTS. REF: BTC 25-380-00-01 9.23 30-OCT-2013 30-OCT-2015 449O 24:26 3728:53 11 911 MOS 58.3 28-SEP-2009 HRS/MSC WC 375:15 3378:04 AFL 110 812 REPLACE THE EMERGENCY FLASHLIGHT (NON-RECHARGEABLE) BATTERIES AT THE MANUFACTURER'S RECOMMENDED INTERVAL. VENDOR RECOMMENDATION MOS 24 23.67 17-AUG-2012 17-AUG-2014 10E 25.421 HRSAISC 98:10 3655:09 REF: BTC 25-390-00-01 AFL 34 888 25-410-00 (001.0) NO. I SMOKE HOOD 119-003 MOS TSN:119 TSO:0 202.43 24-AUG-2007 17687 HRSOASC 0/C TSN:2968:28 3752 2%8:28 REF: AFL TSN:699 922 699 25-410-00(001.1) RESTORE NO.1 SMOKE HOOD RESTORE 119-003 MOS 120 83.43 24-AUG-2007 24-AUG-2017 1113d 17687 HRS/MSC 784:51 2%8:28 REF: BTC 25-410-00-CH AFL 223 699 25-410-00 (002.0) NO. 2 SMOKE HOOD 119-003 MOS TSN:119 202.43 24-AUG-2007 17690 HRS/MSC 0/C TSN:2968:28 3752 2%8:28 REF: AFL TSN:699 922 699 25-410-00 (002.1) RESTORE SMOKE HOOD RESTORE 119-003 MOS 120 83.43 24-AUG-2007 24-AUG-2017 1113d 17690 FIRS/MSC 784:51 2%8:28 REF: BTC 25-410-00-CH AFL 223 699 25-420-00 (001.0) FORWARD FIRST AID KIT RE1013-107 MOS TSO:OTSN:168 179.17 02-SEP-2013 FA5Z009 HRSIMSC 0/C TSN:3728:50 TSO:0 3752 3728:53 REF: AFL TSN:911 TSO:0 922 911 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time I.-Estimated Due (New Requirement) (EFF)-Effective CM CAMP SYSTEMS 37 Of 315 EFTA00619076
CAMPt Status Report 737-72U83 REVISION 21 S/N 29273 (YGOO6) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: O7-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 25-420-00 (001.1) RESTORE FORWARD FIRST AID KIT RESTORE RE1013-107 MOS 12 11.17 02-SEP-2013 02-SEP-2014 26d FA52009 HRS/MSC 24:26 3728:53 REF: BTC 25-420-00-0i AFL 11 911 25-420-00 (002.0) AFT FIRST AID KIT RE1013-107 MOS TSN:l68 TS0:0 179.17 02-SEP-2013 FA52007 HRS04SC Or/C TSO:OTSN:3728:50 3752 3728:53 REF: AFL TSO:OTSN:9I1 922 911 25-420-00 (002.1) RESTORE AFT FIRST AID KIT RESTORE RE1013-107 MOS 12 11.17 02-SEP-2013 02-SEP-2014 26d FA52007 HRS04SC 24:26 3728:53 REF: BTC 25-420-00-CH AFL 11 911 25-430-00 (001.0) MEDAIRE - BLUE FIRST AID MEDICAL KIT IFAK MOS TSN:I68 TS0:0 179.17 02-SEP-2013 DUMI 50710 HRS04SC Or/C TSN:3728:50 TS0:0 3752 3728:53 REF: AFL TSN:911 TSO:0 922 911 25-430-00 (001.1) RESTORE MEDAIRE - BLUE FIRST AID MEDICAL KIT IFAK MOS 12 11.17 02-SEP-2013 02-SEP-2014 26d 25.461 DUMI 50710 HRS04SC 24:26 3728:53 REF: BTC 25-430-00-CH AFL 11 911 25-60-00 GENERAL VISUAL INSPECTION OF ALL COCKPIT / CABIN EMERGENCY EQUIPMENT MOS 12 09-AUG-2014 M 2 d HRS04SC REF: AFL 251005 COMB/OHU BRACKETS 9762-0810-001 MOS 25.180 N/SN HRS04SC 0/C 3753:19 0 REF: AFL 251009 CHART LIGHT 9762-0814-002 MOS 25.200 N/SN HRS04SC O/C 3753:19 0 REF: AFL 251010 SUNVISOR TRACK 9762-0817-002 MOS 25.205 N/SN HRS04SC Or/C 3753:19 0 REF: AFL 251011 PROJECTOR COMBINER 9762-0819-001 MOS 25.210 N/SN HRS04SC Or/C 3753:19 0 REF: AFL 251031 FORWARD ATTENDANT SEAT ASSEMBLY 2110-30I FG MOS 177.97 08-OCT-1999 868 HRS04SC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 38 Of 315 EFTA00619077
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 251032 AFT ATTENDANT SEAT ASSEMBLY 5414A201-3301FG MOS 177.97 08-OCT-1999 SN-UNKNOWN HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 251100 SUNSHADE SUNVISOR 9762-0821-001 MOS 25.213 N/SN HRSAISC O/C 3753:19 0 REF: AFL + 252501 VISUALLY CHECK FORWARD ENTRY DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER PRESSURE MOS 2 1.77 14-JUN-2014 14-AUG-2014 7 0 HRSAISC 3:37 3749:42 REF: BTC 25-250-O0-01 AFL 2 920 + 252502 VISUALLY CHECK FORWARD SERVICE DOOR EMERGENCY ESCAPE SUDE PRESSURE BOTTLE FOR PROPER PRESSURE MOS 2 1.77 14-JUN-2014 14-AUG-2014 7 0 HRSAISC 3:37 3749:42 REF: BTC 25-250-00-01 AFL 2 920 + 252503 VISUALLY CHECK AFT ENTRY DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER PRESSURE MOS 2 1.77 14-JUN-2014 14-AUG-2014 7 d HRS/MSC 3:37 3749:42 REF: BTC 25-250-00-01 AFL 2 920 • 252504 VISUALLY CHECK AFT SERVICE DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER PRESSURE MOS 2 1.77 14-JUN-2014 14-AUG-2014 7 d HRSAISC 3:37 3749:42 REF: BTC 25-250-00-01 AFL 2 920 + 252901 CAPTAIN LIFE JACKET RESTORE S-51150-7300 MOS 60 TSO:0 47.93 09-AUG-2010 09-AUG-2015 3670 33973 HRSAISC 304:48 3448:31 REF: AFL 81 841 + 252902 FIRST OFFICER LIFE JACKET RESTORE S-51150-7300 MOS 60 TSO:0 47.93 09-AUG-2010 09-AUG-2015 3670 33917 HRS/MSC 304:48 3448:31 REF: AFL 81 841 + 252903 FIRST OBSERVER LIFE JACKET RESTORE S-51150-7300 MOS 60 TSO:0 47.93 09-AUG-2010 09-AUG-2015 3670 33911 HRSAISC 304:48 3448:31 REF: AFL 81 841 + 252904 NO. I FORWARD FLIGHT ATTENDANT LIFE JACKET RESTORE S-51150-7300 MOS 60 TSO:0 47.93 09-AUG-2010 09-AUG-2015 3670 33928 HRSYSASC 304:48 3448:31 REF: AFL 81 841 + 252905 NO. 2 FORWARD FLIGHT ATTENDANT LIFE JACKET RESTORE S-51150-7300 MOS 60 TSO:0 47.93 09-AUG-2010 09-AUG-2015 3670 33982 HRSIMSC 304:48 3448:31 REF: AFL 81 841 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 39 Of 315 EFTA00619078
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL ( ENH ) AFII LIMIT REMAINING 252906 NO. I AFT FLIGHT ATTENDANT LIFE JACKET RESTORE S-51150-7300 MOS 60 TS0.0 47.93 09-AUG-2010 09-AUG-2015 367 d 33936 HRSYSASC 304:48 3448:31 REF: AFL 81 841 + 252907 NO. 2 AFT FLIGHT ATTENDANT LIFE JACKET RESTORE S-51150-7300-9990015-51150-7300 MOS 60 TSN:84 TS0:0 131.93 09-AUG-2010 09-AUG-2015 367 d OAPI HRSAISC TSN:2106:28 2410 3448:31 REF: AFL TSN:490 571 841 252909 SECOND OBSERVER LIFE JACKET RESTORE S-51150-7300 MOS 60 TS00 47.93 09-AUG-2010 09-AUG-2015 367 d 33959 HRSAASC 304:48 3448:31 REF: AFL 81 841 253300 (s) OPERATIONAL CHECK POWER MEGAPHONES PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I HRSAISC 219:47 3533:32 REF: AFL 59 863 254204 DEFIBRILLATOR LAERDAL HEARTSTART FR MOS 132.2 0I-AUG-2003 23069 HRSAASC 0/C REF: AFL 254205 INSPECT DEFIBRILLATOR LAERDAL HEARTSTART FR MOS 12 3.93 09-APR-2014 09-APR-2015 245E 23069 HRSAASC 9:45 3743:34 REF: AFL 5 917 254206 LAERDAL HEARTSTART FR DEFIBRILLATOR PADS M371 3A MOS TSN:0 5.83 12-FEB-2014 01-AUG-2015 IA 359E LOT090613-01 HRSAISC DUE TSN:0 9 3743:34 REF: AFL TSN:0 5 917 Expiry Date: 01-AUG-2015 254210 #1 CONVERTER 1-002-0102-0908 MOS TSR:0 77.6 19-FEB-2008 DE000346 HRSAISC 0/C TSR:0 600:34 3152:45 REF: AFL TSR:0 174 748 254211 #2 CONVERTER 1-002-0102-0908 MOS 77.77 14-FEB-2008 DE000398 HRSYSASC GM 601:57 3151:22 REF: AFL 176 746 254212 #3 CONVERTER 1-032-0102-0908 MOS TSR:0 77.6 19-FEB-2008 DE000356 HRSAASC VC TSR:0 600:34 3152:45 REF: AFL TSR:0 174 748 254219 CABIN #5(115V) CONVERTER PN MOS 80.7 16-NOV-2007 NOT INSTALLED HRSkISC O/C 701:30 3051:49 REF: AFL 204 718 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 40 Of 315 EFTA00619079
CAMP AtisticaftwOuninslar" Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 256051 CAPTAIN SMOKE GOGGLES MXP210-00 MOS 177.97 08-OCT-1999 25.490 N/SN FIRS/MSC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 256052 FIRST OFFICER SMOKE GOGGLES MXP210-00 MOS 177.97 08-OCT-1999 25.490 N/SN HRS1MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 256053 FIRST OBSERVER SMOKE GOGGLES MXP210-00 MOS TSN:0 45.5 22-OCT-2010 25.490 N/SN HRS1MSC O/C TSN:0 292 3460:41 REF: AFL TSN:0 78 844 256054 SECOND OBSERVER SMOKE GOGGLES MX9210-00 MOS 177.97 08-OCT-1999 25.580 N/SN HRS/MSC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 + 256151 (s) INSPECT SMOKE GOGGLES PKG PKG 1 MOS 1 1.8 13-JUN-2014 HRSAISC 200 3:37 3749:42 REF: AFL 2 920 256201 LEFT FORWARD ESCAPE SLIDE BOTTLE PN MOS 10.23 30-SEP-2013 SN-UNKNOWN HRSAISC O./C 24:26 3728:53 REF: AFL 11 911 256202 RIGHT FORWARD ESCAPE SLIDE BOTTLE PN MOS 9.23 30-OCT-2013 SN-UNKNOWN HRS1MSC VC 24:26 3728:53 REF: AFL 11 911 256203 LEFT AFT ESCAPE SLIDE BOTTLE PN MOS 9.23 30-OCT-2013 SN-UNKNOWN HRS/MSC O./C 24:26 3728:53 REF: AFL 11 911 256204 RIGHT AFT ESCAPE SLIDE BOTTLE PN MOS 10.23 30-SEP-2013 SN-UNKNOWN HRSAISC O./C 24:26 3728:53 REF: AFL 11 911 256301 CRASH ME 42D8331 MOS 177.97 08-OCT-1999 25.530 N/SN HRS1MSC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 256310 CARGO NET 453A1810-10 MOS N/SN HRS/MSC O./C 3753:19 0 REF: AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 41 Of 315 EFTA00619080
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE PART/SERIAL ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING 256315 CARGO NET 453A1810-11 MOS N/SN HRS/MSC 0/C 3753:19 0 REF: AFL 256320 CARGO NET 453A1810-12 MOS N/SN HRSAiSC 0./C 3753:19 0 REF: AFL 256323 (001.0) NO. 1 FORWARD EMERGENCY FLASHLIGHT P2-07-0001-10I MOS 177.97 08-OCT-1999 N/SN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 256323 (001.1) OPERATIONAL CHECK OF THE NO. 1 FORWARD EMERGENCY FLASHLIGHT P2-07-0001-101 MOS 6 5.83 12-FEB-2014 12-AUG-2014 50 N/SN HRS/MSC 9:45 3743:34 REF: AFL 5 917 256323 (002.0) NO. 2 FORWARD EMERGENCY FLASHLIGHT P2-07-0001-101 MOS 177.97 08-OCT-1999 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 256323 (002.1) OPERATIONAL CHECK OF THE NO. 2 FORWARD EMERGENCY FLASHLIGHT P2-07-0001-101 MOS 6 5.83 12-FEB-2014 12-AUG-2014 5d SN-UNKNOWN HRSAISC 9:45 3743:34 REF: AFL 5 917 256323 (003.0) NO. 1 COCKPIT FLASHLIGHT UNKNOWN MOS NSN HRSAISC 0./C REF: AFL 256323 (003.1) OPERATIONAL CHECK OF THE NO. 1 COCKPIT FLASHLIGHT UNKNOWN MOS 6 5.83 12-FEB-2014 12-AUG-2014 5d NSN HRSAISC 9:45 3743:34 REF: AFL 5 917 256323 (004.0) NO. 2 COCKPIT FLASHLIGHT PN-UNKNOWN MOS SN-UNKNOWN HRSAiSC 0./C REF: AFL 256323 (004.1) OPERATIONAL CHECK OF THE NO. 2 COCKPIT FLASHLIGHT PN-UNKNOWN MOS 6 5.83 12-FEB-2014 12-AUG-2014 5d SN-UNKNOWN HRSAISC 9:45 3743:34 REF: AFL 5 917 256323 (005.0) NO. I AFT EMERGENCY FLASHLIGHT P2-07-0001-101 MOS 177.97 08-OCT-1999 SN-UNKNOWN HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 42 Of 315 EFTA00619081
C4A4IP Status Report 737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-B63): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 256323 (005.1) OPERATIONAL CHECK OF THE NO. 1 AFT EMERGENCY FLASHLIGHT P2-07-0001-101 MOS 6 5.83 12-FEB-2014 12-AUG-2014 50 SN-UNKNOWN HRS/MSC 9:45 3743:34 REF: AFL 5 917 256325 CARGO NET 453A1810-13 MOS N/SN HRSAiSC 0./C 3753:19 0 REF: AFL 256325 (003.1) OPERATIONAL CHECK OF THE CARGO NET 453A1810-13 MOS 6 5.83 12-FEB-2014 12-AUG-2014 5 0 N/SN FIRS/MSC 9:45 3743:34 REF: AFL 5 917 256330 CARGO NET 453A1810-14 MOS N/SN HRSAISC 0/C 3753:19 0 REF: AFL 256335 CARGO NET 453A1810-5 MOS N/SN HRSAISC 0/C 3753:19 0 REF: AFL 256340 CARGO NET 453A1810-6 MOS N/SN HRSAISC 0!C 3753:19 0 REF: AFL 256345 CARGO NET 453A1810-7 MOS N/SN HRSAISC 0/C 3753:19 0 REF: AFL 256350 CARGO NET 453A1810-8 MOS N/SN FIRS/MSC 0/C 3753:19 0 REF: AFL 256355 CARGO NET 453A1810-9 MOS TSN:0 177.97 08-OCT-1999 N/SN FIRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 + 257001 (s) GENERAL VISUAL INSPECTION HEADLINER CEILING PANELS PKG PKG 12.31 .32 .33 MOS 12 13.13 03-JUL-2013 HRS/MSC 29:58 3723:21 REF: AFL 14 908 + 257002 (s) GENERAL VISUAL INSPECTION INTERIOR BULKHEADS PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 FIRS/MSC 29:58 3723:21 REF: AFL 14 908 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effeclive CM O CAMP SYSTEMS 43 Of 315 EFTA00619082
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING • 257003 (s) GENERAL VISUAL INSPECTION COMPARTMENT DOORS PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 HRSYMSC 29:58 3723:21 REF: AFL 14 908 • 257004 (s) GENERAL VISUAL INSPECTION SEATS ANDTABLES PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 HRSAiSC 29:58 3723:21 REF: AFL 14 908 • 257005 (s) GENERAL VISUAL INSPECTION CLOSET AND CABINETS PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 HRS./MSC 29:58 3723:21 REF: AFL 14 908 + 257006 (s) GENERAL VISUAL INSPECTION CLOSET AND CABINET DOORS PKG PKG 12.31 .32 .33 MOS 12 13.13 03-JUL-2013 HRSAISC 29:58 3723:21 REF: AFL 14 908 + 257007 (s) GENERAL VISUAL INSPECTION BED AND DIVANS PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 HRS./MSC 29:58 3723:21 REF: AFL 14 908 + 257008 CHECK WASTE BINS MOS 83.43 24-AUG-2007 HRSYMSC 1000 784:51 2968:28 3968:28 215:09 REF: AFL 223 699 + 257011 (s) CHECK SAFETY BELTS PKG PKG 12.31 .32 .33 MOS 12 13.13 03-JUL-2013 HRS./MSC 29:58 3723:21 REF: AFL 14 908 258001 REFRIGERATOR 155000 MOS 177.97 08-OCT-1999 300698/19 HRSYMSC O/C 3709:19 44 REF: AFL 884 38 258005 STEAM OVEN 72072102 MOS 177.97 08-OCT-I999 0134 HRSAISC CPC 3709:19 44 REF: AFL 884 38 258006 STEAM OVEN 72072102 MOS 177.97 08-OCT-I999 0333 HRS./MSC CPC 3709:19 44 REF: AFL 884 38 258030 WINE CHILLER AL-RF6S-400-3 MOS 177.97 08-OCT-1999 034 HRSMSC O/C 3709:19 44 REF: AFL 884 38 CHAPTER 26 FIRE PROTECTION 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 44 Of 315 EFTA00619083
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 26-00-01 ENGINE AND APU PANEL 69-37307-300 MOS 177.97 08-OCT-1999 26.060 D03132 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-00-02 CARGO FIRE PANEL 473955-1 MOS 177.97 08-OCT-1999 26.015 0116 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 + 26-010-00 OPERATIONAL CHECK LAVATORY SMOKE DETECTORS MOS 177.97 08-OCT-1999 26.140 HRS/MSC 6000 3709:19 44 6044 2290:41 REF: BTC 26-010-00-CH AFL 884 38 + 26-020-00 (s) RESTORE LAVATORY SMOKE DETECTOR GRILL BY CLEANING PKG PKG 31 .32 .33 MOS 36 26.150 HRSAiSC REF: BTC 26-020-00-CH AFL + 26-030-00 OPERATIONAL CHECK APU REMOTE FIRE DETECTION SYSTEM (M279 FIRE DETECTION CONTROL MODULE AND P28 REMOTE APU CONTROL PANEL) MOS 177.97 08-OCT- I 999 26.160 HRSYMSC 10000 3709:19 44 10044 6290:41 REF: BIC 26-030-00-01 AFL 884 38 + 26-050-00 VISUALLY CHECK ENGINE FIRE BOTTLE PRESSURE GAGES FOR CORRECT PRESSURE. (AND APU FIRE BOTTLE PRESSURE GAUGE IF INSTALLED) MOS 71.5 22-AUG-2008 26.170 HRSYMSC 1600 492:31 3260:48 4860:48 1107:29 REF: EITC 26-050-00-CH AFL 140 782 26-061-00(001.0) NO. 1 ENGINE FIRE EXTINGUISHER BOTTLE RESTORE 33700002 MOS TSO:0 11.3 28-AUG-2013 26.040 33297D1 HRSYMSC 0./C TSO:0 26:19 3727 REF: AFL TSO:0 12 910 26-061-00(001.1) HYDROSTATIC TEST NO. 1 ENGINE FIRE EXTINGUISHER BOTTLE RESTORE 33700002 MOS 120 11.47 23-AUG-2013 23-AUG-2023 3303d 26.040 33297D1 HRS/MSC REF: EITC 26-061-00-CH AFL 26-061-00 (002.0) NO. 2 ENGINE FIRE EXTINGUISHER BOTTLE 33700002 MOS TSO:0 11.3 28-AUG-2013 26.041 27076D1 HRSAiSC 0./C ISO.° 26:19 3727 REF: AFL TSO:0 12 910 26-061-00(002.1) HYDROSTATIC TEST NO. 2 ENGINE FIRE EXTINGUISHER BOTTLE 33700002 MOS 120 11.47 23-AUG-2013 23-AUG-2023 3303d 26.041 27076D1 HRS/MSC REF: BTC 26-061-00-CH AFL + 26-070-00(001.0) NO. I ENGINE FIRE EXTINGUISHER BOTTLE - FORWARD SQUIB LIFE LIMIT 30903871 MOS TSN: I 0 21.3 28-AUG-2013 26.040 02133 HRSIMSC 0/C 36 3727 REF: AFL 22 910 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM 45 Of 315 O CAMP SYSTEMS EFTA00619084
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 26-070-00 (001.1) REPLACE NO. I ENGINE FIRE EXTINGUISHER BOTTLE - FORWARD SQUIB LIFE LIMIT 30903871 MOS 120 21.2 31-OCT-2012 31-OCT-2022 3007 CI 26.040 02133 HRSYMSC REF: BTC 26-070-00-01 AFL + 26-070-00 (002.0) NO. I ENGINE FIRE EXTINGUISHER BOTTLE - AFT SQUIB LIFE LIMIT 30903872 MOS TSN:6 17.3 28-AUG-2013 26.040 01769 HRSAISC 0/C 32 3727 REF: AFL 18 910 26-070-00 (002.1) REPLACE NO. I ENGINE FIRE EXTINGUISHER BOTTLE - AFT SQUIB LIFE LIMIT 30903872 MOS 120 17.3 28-FEB-2013 28-FEB-2023 3127d 26.040 01769 HRS1MSC REF: BTC 26-070-00-0I AFL + 26-070-00 (003.0) NO. 2 ENGINE FIRE EXTINGUISHER BOTTLE - FORWARD SQUIB LIFE LIMIT 30909871 MOS TSN:I1 22.3 28-AUG-2013 26.041 02073 HRSAISC 0/C TSN:0 26 3727 REF: AFL TSN:0 12 910 26-070-00 (003.1) REPLACE NO.2 ENGINE FIRE EXTINGUISHER BOTTLE - FORWARD SQUIB LIFE LIMIT 30909871 MOS 120 22.23 30-SEP-2012 30-SEP-2022 2976d 26.041 02073 HRSAISC REF: BTC 26-070-00-0I AFL + 26-070-00 (004.0) NO. 2 ENGINE FIRE EXTINGUISHER BOTTLE - AFT SQUIB LIFE LIMIT 30903972 MOS TSN:8 19.3 28-AUG-2013 26.041 01734 HRS1MSC 0/C TSN:0 26 3727 REF: AFL TSN:0 12 910 26-070-00 (004.1) REPLACE NO.2 ENGINE FIRE EXTINGUISHER BOTTLE - AFT SQUIB LIFE LIMIT 30903972 MOS 120 19.2 31-DEC-2012 31-DEC-2022 3068d 26.041 01734 HRSAISC REF: BTC 26-070-00-01 AFL 26-080-00 FUNCTIONAL CHECK THE ENGINE SQUIB FIRING CIRCUIT USING THE ENGINE FIRE HANDLE SWITCH MOS 177.97 08-OCT-1999 26.250 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 26-080-00-0I AFL 884 38 26-090-00 (01) OPERATIONAL CHECK OF ENGINE FIRE EXTINGUISHER SYSTEM CHECK VALVES FOR FREEDOM OF MOVEMENT MOS 177.97 08-OCT-1999 26.040 HRS1MSC C/C 3709:19 44 REF: BTC 26-090-00-01 AFL 884 38 26-090-00 (02) 26.041 26-10-00 OPERATIONAL CHECK ENGINE FIRE EXTINGUISHER SYSTEM CHECK VALVES FOR FREEDOM OF MOVEMENT REF: BTC 26-090-00-01 MOS HRSYMSC C/C AFL VISUAL INSPECTION/CLEAN PN CGA81500-00 SMOKE DETECTORS PER JBSL-M-000491CA-01 REF: 177.97 08-OCT-1999 3709:19 44 884 38 MOS HRSAISC 9000 3753:19 0 9000 5246:41 AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 46 Of 315 EFTA00619085
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 IRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 26-10-01 26.070 26-100-00 (01) ENGINE AND APU FIRE DETECTION CONTROL (NOTE: ETOPS SIGNIFICANT TASK) MODULE 901950-02 MOS 407 HRS,MSC Or/C TSN:44 REF: AFL TSN:38 FUNCTIONAL CHECK OF NO. 1 ENGINE FIRE BOTTLE PRESSURE SWITCH (OFF AIRCRAFT). 177.97 3753 922 08-OCT-1999 44 38 VENDOR RECOMMENDATION MOS 131.5 22-AUG-2003 26.040 HRS,MSC C/C 2411:19 1342 REF: BTC 26-100-00-0I AFL 571 351 26-100-00 (02) FUNCTIONAL CHECK OF NO. 2 ENGINE FIRE BOTTLE PRESSURE SWITCH (OFF AIRCRAFT). VENDOR RECOMMENDATION MOS 131.5 22-AUG-2003 26.041 HRS1MSC CfC 2411:19 1342 REF: BTC 26-100-00-0I AFL 571 351 26-11-01 (01) # 1 ENGINE LOWER FAN FIRE DETECTOR ASSEMBLY PN MOS 26.010 SN-UNKNOWN HR&MSC Or/C 3753:19 0 REF: AFL 26-11-01 (02) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.010 SN-UNKNOWN HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (03) 'Br ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.010 SN-UNKNOWN HR&MSC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (04) # 2 ENGINE LOWER FAN FIRE DETECTOR ASSEMBLY PN MOS 26.020 SN-UNKNOWN HRS1MSC VC 3753:19 0 REF: AFL 26-11-01 (05) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.020 SN-UNKNOWN HR&MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (06) 'Br ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.020 SN-UNKNOWN HR&MSC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (07) # 1 ENGINE RIGHT CORE FIRE DETECTOR ASSEMBLY PN MOS 26.030 SN-UNKNOWN HR&MSC Or/C 3753:19 0 REF: AFL 26-11-01 (08) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.030 SN-UNKNOWN HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM CAMP SYSTEMS 47 Of 315 EFTA00619086
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 26-11-01 (09) 13" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.030 SN-UNKNOWN FIRS/ MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (10) ft 2 ENGINE RIGHT CORE FIRE DETECTOR ASSEMBLY PN MOS 26.045 SN-UNKNOWN HRSAISC 0./C 3753:19 0 REF: AFL 26-11-01 (II) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.045 SN-UNKNOWN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (12) "B" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.045 SN-UNKNOWN HRSYMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (13) # 1 ENGINE LEFT CORE FIRE DETECTOR ASSEMBLY PN MOS 26.030 SN-UNKNOWN HRS/MSC 0/C 3753:19 0 REF: AFL 26-11-01 (14) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.030 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (15) "Br ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.030 SN-UNKNOWN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (16) # 2 ENGINE LEFT CORE FIRE DETECTOR ASSEMBLY PN MOS 26.045 SN-UNKNOWN HRSAISC 0./C 3753:19 0 REF: AFL 26-11-01 (17) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.045 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (18) I? ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.045 SN-UNKNOWN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (19) # 1 ENGINE UPPER FAN FIRE DETECTOR ASSEMBLY 902864 MOS TSR:0 30.6 19-JAN-2012 26.010 4943 HRS/MSC 0/C TSR:0 143:27 3609:52 REF: AFL TSR:0 43 879 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM CAMP SYSTEMS 48 Of 315 EFTA00619087
C a " Muni.. Mr gnad Bp' Status Report 737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 26-11-01 (20) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.010 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (21) 'V ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.010 SN-UNKNOWN FIRS/ MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (22) # 2 ENGINE UPPER FAN FIRE DETECTOR ASSEMBLY PN MOS 26.020 SN-UNKNOWN FIRSIMSC 0/C 3753:19 0 REF: AFL 26-11-01 (23) 'A" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.020 SN-UNKNOWN FIRS/ MSC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 26-11-01 (24) 13" ELEMENT PN MOS TSN:0 177.97 08-OCT-1999 26.020 SN-UNKNOWN HRS/MSC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 + 26-110-00 26.250 OPERATIONAL CHECK ENGINE FIRE HANDLE (INCLUDING FIRE HANDLE LOCK OVERRIDE CIRCUITRY) FOR ENGINE SHUTDOWN AND ISOLATION MOS 177.97 FIRS/MSC 6000 3709:19 REF: BTC 26-110-00-01 AFL 884 08-OCT-1999 44 38 6044 229041 26-120-00 (01) FUNCTIONAL CHECK OF THE NO.1 ENGINE FIRE BOTTLE PRESSURE GAGE (OFF AIRCRAFT) VENDOR RECOMMENDATION MOS 131.5 22-AUG-2003 26.040 FIRS/MSC C/C 2411:19 1342 REF: BTC 26-120-00-01 AFL 571 351 26-120-00 (02) FUNCTIONAL CHECK OF THE NO.2 ENGINE FIRE BOTTLE PRESSURE GAGE (OFF AIRCRAFT) VENDOR RECOMMENDATION MOS 131.5 22-AUG-2003 26.041 HRSIMSC C/C 2411:19 1342 REF: BTC 26-120-00-01 AFL 571 351 26-13-01 FUNCTIONALLY CHECK EXTINGUISHER MONITOR UNIT PER WALTER KIDDE DOCUMENT R-6179 OR R-6664. PARAGRAPH 5.7 FOR HOLLINGSEAD INSTALLED FIRE BOTTLE (HIGH RATE DISCHARGE) MOS 71.5 22-AUG-2008 26.065 HR&MSC 6000 492:31 3260:48 9260:48 5507:29 REF: ICA 26-13-01-01 AFL 140 782 26-13-02 FUNCTIONALLY CHECK THE HIGH RATE DISCHARGE CARGO COMPARTMENT FIRE BOTTLE SOUIB PER WALTER KIDDE DOCUMENT R-6179 OR R-6664. PARAGRAPH 5.9 MOS 26.085 HR&MSC 6000 REF: ICA 26-13-02-01 AFL 107 07-SEP-2005 1550:58 2202:21 381 541 8202:21 4419:02 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 49 Of 315 EFTA00619088
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YGOO6) (VP-883): 3753:19 IRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: O7-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE ( ENH ) AFH MAX TIME LIMIT REMAINING 26-130-00 (01) 26.040 26-130-00 (02) REPLACE THE NO.1 ENGINE FIRE BOTTLE OVERPRESSURE RELIEF DISC (OFF AIRCRAFT). MOS HRS/MSC CfC REF: BTC 26-130-00-01 AFL REPLACE THE NO.2 ENGINE FIRE BOTTLE OVERPRESSURE RELIEF DISC (OFF AIRCRAFT). 131.5 2411:19 571 22-AUG-2003 1342 351 VENDOR RECOMMENDATION VENDOR RECOMMENDATION MOS 131.5 22-AUG-2003 26.041 HRSAISC CJC 2411:19 1342 REF: EITC 26-130-00-CH AFL 571 351 26-15-01 (I) APU DOOR FIRE DETECTOR ASSEMBLY 902014 MOS 177.97 08-OCT-1999 26.080 1102 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 26-15-01 (2) APU EXHAUST DUCT FIRE DETECTOR ASSEMBLY 902020 MOS 177.97 08-OCT-1999 26.090 1090 HRSAiSC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 26-15-01 (3) APU UPPER FIRE WALL DETECTOR ASSEMBLY 902013-01 MOS 126.93 09-JAN-2004 26.130 21147 HRS1MSC 0/C 2205:49 1547:30 REF: AFL 531 391 + 26-150-00 FUNCTIONAL CHECK OF THE ENGINE FIRE EXTINGUISHING DISTRIBUTION SYSTEM (FLOW AND PRESSURE CHECK). MOS 177.97 08-OCT-1999 26.241 HRSAISC 6000 3753:19 0 6000 2246:41 REF: BTC 26-150-00-CH AFL 922 0 26-16-02 (I) FORWARD CARGO CONTROL ELECTRONIC UNIT 473925 MOS SN-UNKNOWN HRSAISC O/C 3753:19 0 REF: AFL 26-16-02 (2) AFT CARGO CONTROL ELECTRONIC UNIT 473925 MOS SN-UNKNOWN HRSYMSC O/C 3753:19 0 REF: AFL + 26-170-00 26.242 GENERAL VISUAL INSPECTION OF THE ENGINE FIRE EXTINGUISHING DISTRIBUTION SYSTEM (INCLUDING EXTINGUISHER BOTTLES). MOS 177.97 HRS/MSC 6000 3753:19 REF: BTC 26-170-00-01 AFL 922 08-OCT-1999 0 6000 2246:41 0 26-18-01 OVERHEAT DETECTION CONTROL UNIT 10-62187 MOS 35.27 29-AUG-2011 26.050 B1701 HRSAISC GM 219:47 3533:32 REF: AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 50 Of 315 EFTA00619089
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 26-181-00 (001.0) APU FIRE EXTINGUISHER BOTTLE 33000027-1 MOS TSO:10 23.67 17-AUG-2012 26.290 3942481 HRSAISC 0/C T500 98:10 3655:09 REF: AFL T500 34 888 26-181-00 (001.1) HYDROSTATIC TEST APU FIRE EXTINGUISHER BOTTLE 33000027-1 MOS 60 34.13 03-OCT-2011 31-0G7-2016 M 816d 26.290 3942481 HRSAISC REF: BTC 26-181-00-01 AFL + 26-210-00 (001.0) APU FIRE EXTINGUISHER BOTTLE FORWARD SQUIB 30903872 MOS TSN:41 64.67 17-AUG-2012 26.290 0108MD HRSAASC 0/C 139 3655:09 REF: AFL 75 888 26-210-00 (001.1) REPLACE APU FIRE EXTINGUISHER BOTTLE FORWARD SQUIB LIFE LIMIT 30903872 MOS 120 63.23 30-APR-2009 30-APR-2019 1727 d 26.290 0108MD HRSOASC REF: BTC 26-210-00-CH AFL 26-220-00 FUNCTIONAL CHECK OF APU SQUIB FIRING CIRCUIT USING THE APU FIRE HANDLE SWITCH AND VERIFY SQUIB CONTINUITY MOS 177.97 08-OCT-1999 26.250 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 26-220-00-01 AFL 884 38 26-230-00 OPERATIONAL CHECK APU FIRE HANDLE (INCLUDING FIRE HANDLE LOCK OVERRIDE CIRCUITRY AND P28 REMOTE APU CONTROL PANEL) FOR APU SHUTDOWN AND ISLOLATION MOS 177.97 08-OCT-1999 26.250 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 26-230-00-01 AFL 884 38 + 26-250-00 GENERAL VISUAL INSPECTION APU REMOTE CONTROL PANEL FOR CONDITION AND SECURITY OF INSTALLATION MOS 177.97 08-OCT-1999 26.320 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 26-250-00-CH AFL 884 38 26-260-00 FUNCTIONAL CHECK THE APU FIRE BOTTLE PRESSURE SWITCH (OFF AIRCRAFT). MOS 143.33 27-AUG-2002 26.290 HRSAASC CC 2695:31 1057:48 REF: BTC 26-260-00-CH AFL 651 271 + 26-280-00 DETAILED VISUAL INSPECTION APU FIRE EXTINGUISHER DISTRIBUTION SYSTEM AND APU FIRE BOTTLE MOS 177.97 08-OCT-1999 26.330 HRSAASC 6000 3709:19 44 6044 2290:41 REF: BTC 26-280-00-01 AFL 884 38 + 26-300-00 DETAILED VISUAL INSPECTION LAVATORY FIRE BOTTLES FUSIBLE TIPS AND DISCHARGE TUBES MOS 83.43 24-AUG-2007 26.370 HRSYSASC 3000 784:51 2%8:28 5968:28 2215:09 REF: BTC 26-300-00-01 AFL 223 699 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 51 Of 315 EFTA00619090
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING • 26-320-00 26.380 + 26-330-00 (001.0) VISUAL CHECK LAVATORY WASTE COMPARTMENT TEMPERATURE INDICATOR STRIP FOR HEAT EXPOSURE (NOTE: ETOPS SIGNIFICANT TASK) MOS 83.43 HRS1MSC 1000 784:51 REF: BTC 26-320-00-01 AFL 223 (LRD2) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SOUIB 24-AUG-2007 2968:28 699 3968:28 215:09 M446617 MOS TSN:14 85.5 22-AUG-2008 26.035 00173 HRSAiSC 0/C 506 3260:48 REF: AFL 154 782 26-330-00 (001.1) REPLACE (LRD2) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SQUIB LIFE LIMIT M446617 MOS 120 85.23 30-JUN-2007 30-JUN-2017 IA 1058 d 26.035 00173 HRS/MSC REF: BTC 26-330-00-02 AFL + 26-330-00 (002.0) (LRD2) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB M446616 MOS TSN:35 106.5 22-AUG-2008 26.035 00078 HRSAiSC 0./C 527 3260:48 REF: AFL 175 782 26-330-00 (002.1) REPLACE (LRD2) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB LIFE LIMIT M446616 MOS 120 106.23 30-SEP-2005 30-SEP-2015 M 419d 26.035 00078 HRS/MSC REF: BTC 26-330-00-02 AFL + 26-330-00(003.0) (LRD1) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SQUIB 446616 MOS TSN:6 17.23 30-AUG-2013 26.036 ACT1067 HRSAISC 0./C TSN:0 24 3728:53 REF: AFL TSN:0 II 911 26-330-00(003.1) REPLACE (LRDI) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SQUIB LIFE LIMIT 446616 MOS 120 18.2 01-FEB-2013 01-FEB-2023 3100d 26.036 ACT1067 HRS/MSC REF: BTC 26-330-00-02 AFL + 26-330-00 (004.0) (LRD1) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB 446617 MOS TSN:4 15.23 30-AUG-2013 26.036 ACU9626 HRS/MSC 0./C TSN:0 24 3728:53 REF: AFL TSN:0 11 911 26-330-00(004.1) REPLACE (LRDI) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB LIFE LIMIT 446617 MOS 120 16.2 01-APR-2013 01-APR-2023 3159 d 26.036 ACU9626 HRSAiSC REF: BTC 26-330-00-02 AFL 26-330-00 (005.0) (HRD) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SQUIB 446307 MOS TSN:12 83.5 22-AUG-2008 26.600 03010 HRSYMSC 0./C 504 3260:48 REF: AFL 152 782 26-330-00 (005.1) REPLACE (HRD) CARGO FIRE EXTINGUISHER BOTTLE FORWARD SQUIB LIFE LIMIT 446307 MOS 120 83.2 31-AUG-2007 31-AUG-2017 M 1120 d 26.600 03010 HRSAISC REF: BTC 26-330-00-02 AFL 7-Insufficient Intonation +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 52 Of 315 EFTA00619091
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 26-330-00 (006.0) (HRD) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB 446290 MOS TSN:11 825 22-AUG-2008 26.600 05004 HRSYMSC 0/C 503 3260:48 REF: AFL 151 782 26-330-00 (006.1) REPLACE (HRD) CARGO FIRE EXTINGUISHER BOTTLE AFT SQUIB LIFE LIMIT 446290 MOS 120 82.23 30-SEP-2007 30-SEP-2017 1150 d 26.600 05004 HRSAiSC REF: BTC 26-330-00-02 AFL + 26-340-00 FUNCTIONALLY CHECK THE CARGO FIRE EXTINGUISHING DISTRIBUTION SYSTEM (FLOW AND PRESSURE CHECK). MOS 26.460 HRSAiSC 12000 3753:19 0 12000 8246:41 REF: See Workcard AFL 922 0 26-351-00 (001.0) (LRD2) CARGO HALON FIRE EXTINGUISHER BOTTLE 473957 MOS TSO:1 71.5 22-AUG-2008 26.035 25627EL HRSAISC 0./C 492:31 3260:48 REF: AFL 140 782 26-351-00(001.1) HYDROSTATIC TEST (LRD2) CARGO HALON FIRE EXTINGUISHER BOTTLE RESTORE 473957 MOS 120 72.4 25-JUL-2008 25-JUL-2018 1448d 26.035 25627EL HRS/MSC REF: BTC 26-351-00-02 AFL 26-351-00 (002.0) (LRD1) CARGO HALON FIRE EXTINGUISHER BOTTLE 34600010-28 MOS TSN:175 246.5 22-AUG-2008 26.036 10661F1 HRSAiSC 0./C 667 3260:48 REF: AFL 315 782 26-351-00(002.1) HYDROSTATIC TEST (LRDI) CARGO HALON FIRE EXTINGUISHER BOTTLE RESTORE 34600010-28 MOS 120 72.4 25-JUL-2008 25-JUL-2018 1448d 26.036 10661F1 HRSAISC REF: BTC 26-351-00-02 AFL 26-351-00 (003.0) (HRD) CARGO HALON FIRE EXTINGUISHER BOTTLE 474089-I MOS 71.5 22-AUG-2008 26.600 10033EL HRSAISC 0/C 492:31 3260:48 REF: AFL 140 782 26-351-00 (003.1) HYDROSTATIC TEST (HRD) CARGO HALON FIRE EXTINGUISHER BOTTLE RESTORE 474089-1 MOS 120 72.2 0I-AUG-2008 01-AUG-2018 1455d 26.600 10033EL HRS/MSC REF: BTC 26-351-00-02 AFL 26-360-00 (01) FUNCTIONAL CHECK (LRD2) CARGO FIRE EXTINGUISHING BOTTLE PRESSURE SWITCH (OFF AIRCRAFT). VENDOR RECOMMENDATION MOS 71.5 22-AUG-2008 26.035 HRSYMSC C/C 492:31 3260:48 REF: BTC 26-360-00-02 AFL 140 782 26-360-00(02) FUNCTIONAL CHECK (LRD1) CARGO FIRE EXTINGUISHING BOTTLE PRESSURE SWITCH (OFF AIRCRAFT). VENDOR RECOMMENDATION MOS 71.5 22-AUG-2008 26.036 HRSAISC C/C 492:31 3260:48 REF: BTC 26-360-00-02 AFL 140 782 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 53 Of 315 EFTA00619092
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YGOO6) (VP-883): 3753:19 IRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: O7-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 26-360-00 (03) 26.600 + 26-370-00 26.500 26-390-00 (01) FUNCTIONAL CHECK (HRD) CARGO FIRE EXTINGUISHING BOTTLE PRESSURE SWITCH (OFF AIRCRAFT). MOS 71.5 HRS/SASC CfC 492:31 REF: BTC 26-360-00-02 AFL 140 OPERATIONAL CHECK CARGO FIRE EXTINGUISHING ARM/DISCHARGE SWITCHES TO VERIFY CIRCUITRY MOS 177.97 HRSAISC 6000 3709:19 REF: See Workcar0 AFL 884 REPLACE (LDR2) CARGO FIRE EXTINGUISHING SYSTEM FILTER/DRIER 22-AUG-2008 3260:48 782 08-OCT-1999 44 38 6044 VENDOR RECOMMENDATION 2290:41 MOS 71.5 22-AUG-2008 26.035 MRS/MSC C/C 492:31 3260:48 REF: BTC 26-390-00-01 AFL 140 782 26-390-00 (02) REPLACE (LRDI) CARGO FIRE EXTINGUISHING SYSTEM FILTER/DRIER MOS 71.5 22-AUG-2008 26.036 HRS/MSC C/C 492:31 3260:48 REF: BTC 26-390-00-01 AFL 140 782 26-390-00 (03) REPLACE (HRO) CARGO FIRE EXTINGUISHING SYSTEM FILTER/DRIER MOS 71.5 22-AUG-2008 26.600 HRS/MSC C/C 492:31 3260:48 REF: BTC 26-390-00-01 AFL 140 782 + 26-400-00 FUNCTIONALLY CHECK CARGO FIRE EXTINGUISHING 60 MINUTE TIMER MOS 177.97 08-OCT-1999 26.530 MRS/MSC 6000 3709:19 44 6044 2290:41 REF: See Workcard AFL 884 38 26-450-00 (s) INSPECT (DETAILED) THE PORTABLE HALON FIRE EXTINGUISHERS FOR PROPER PRESSURE (IF GAUGE PKG INSTALLED). WEIGHT AND CONDITION. PKG 12.31 .32 .33 MOS 12 13.13 03-JUL-2013 26.540 MRS/MSC 29.58 3723:21 REF: BTC 26-450-00-01 AFL 14 908 26-461-00 (007.0) ENTRANCE WAY PORTABLE FIRE EXTINGUISHER BOTTLE 898052 MOS 17.53 21-FEB-2013 26.400 X402285 MRS/MSC 0/C 51:06 3702:13 REF: AFL 25 897 26-461-00 (007.1) HYDROSTATIC TEST ENTRANCE WAY PORTABLE FIRE EXTINGUISHER BOTTLE RESTORE 898052 MOS 120 35.27 29-AUG-201I 29-AUG-2021 2579d 26.400 X402285 HRSAISC REF: BTC 26-461-00-01 AFL 26-AWL-13-01 PATS DETAIL VISUAL INSPECTION OF THE HOLLINGSEAD INSTALLED FIRE BOTTLE (HIGH RATE DISCHARGE) AND BRACKET INSTALLATION AT STATION 540. LBL 10. WL 195. MOS 177.97 08-OCT-1999 26.075 HRS/MSC 3709:19 44 REF: AFL 4000 884 38 4038 3116 262401 COCKPIT PORTABLE FIRE EXTINGUISHER BOTTLE 898052 MOS 17.53 21-FEB-2013 X-841371 HRSIMSC 0/C 51:06 3702:13 REF: AFL 25 897 74nsufficlent Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Elective CM O CAMP SYSTEMS 54 Of 315 EFTA00619093
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 262404 MID CABIN PORTABLE HALON FIRE EXTINGUISHER BOTTLE 898052 MOS 17.53 21-FEB-2013 X-840288 HRSAISC 0./C 51:06 3702:13 REF: AFL 25 897 262405 GALLEY PORTABLE HALON FIRE EXTINGUISHER BOTTLE 898052 MOS 17.53 21-FEB-2013 X-841372 HRSAISC 0/C 51:06 3702:13 REF: AFL 25 897 + 262901 WEIGHT CHECK COCKPIT PORTABLE FIRE EXTINGUISHER BOTTLE 898052 MOS 18 17.77 14-FEB-2013 14-AUG-2014 7 0 X-841371 HRS/MSC REF: AFL + 262902 WEIGHT CHECK ENTRANCE WAY PORTABLE FIRE EXTINGUISHER BOTTLE 898052 MOS 18 17.77 14-FEB-2013 14-AUG-2014 7 0 X402285 HRSAISC REF: AFL + 262903 WEIGHT CHECK GALLEY PORTABLE HALON FIRE EXTINGUISHER BOTTLE 898052 MOS 18 17.77 14-FEB-2013 14-AUG-2014 70 X-841372 HRS/MSC REF: AFL 262904 WEIGHT CHECK MID CABIN PORTABLE HALON FIRE EXTINGUISHER BOTTLE 898052 MOS 18 17.77 14-FEB-2013 14-AUG-2014 70 X-840288 HRS/MSC REF: AFL 264001 HYDROSTATIC TEST COCKPIT PORTABLE FIRE EXTINGUISHER BOTTLE 898052 MOS 120 35.27 29-AUG-2011 29-AUG-2021 25790 X-841371 HRSAISC REF: AFL 264004 HYDROSTATIC TEST MID CABIN PORTABLE HALON FIRE EXTINGUISHER BOTTLE 898052 MOS 120 35.27 29-AUG-2011 29-AUG-2021 25790 X-840288 HRSAISC REF: AFL 264005 HYDROSTATIC TEST GALLEY PORTABLE HALON FIRE EXTINGUISHER BOTTLE 898052 MOS 120 35.27 29-AUG-2011 29-AUG-2021 25790 X-841372 HRSAISC REF: AFL • 265001 GENERAL VISUAL INSPECTION SMOKE DETECTORS MOS 177.97 08-OCT-1999 HRSAISC NCO TSI:0 3709:19 44 9044 5290:41 REF: AFL 884 38 265171 FWD LAV SMOKE DETECTOR PU90-439 MOS 15555 HRS/MSC 0/C REF: AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 55 Of 315 EFTA00619094
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 265176 BEDROOM SMOKE DETECTOR CGABI 500-03 MOS 923 30-OCT-2013 SN-UNKNOWN HRSAiSC O./C 24:26 3728:53 REF: AFL 11 911 265177 AFT LAV SMOKE DETECTOR CGABI500-O3 MOS 007 HRS/MSC O./C REF: AFL 265179 COCKPIT SMOKE DETECTOR CONTROL PANEL PN MOS SN-UNKNOWN HRS/MSC O/C REF: AFL 265180 (s) FUNCTIONALLY CHECK THE BONDING/GROUND RESISTANCE OF THE HOLLINGSEAD INSTALLED FIRE BOTTLE PKG (HIGH RATE DISCHARGE) GROUND STRAP PER THE BOEING SWPM CHAPTER 20-20-00 PKG 32 .33 MOS 72 35.27 29-AUG-2011 26.095 HRSAISC 219:47 3533:32 REF: See Workcard AFL 59 863 265195 FORWARD CARGO STATION 430 RIGHT HAND SIDE SMOKE DETECTOR 473597-5 MOS SN-UNKNOWN HRS/MSC OC 3753:19 0 REF: AFL 265200 FORWARD CARGO STATION 470 LEFT HAND SIDE SMOKE DETECTOR 473597-5 MOS SN-UNKNOWN HRSthlSC OC 3753:19 0 REF: AFL 265205 FORWARD CARGO STATION 500 RIGHT HAND SIDE SMOKE DETECTOR 473597-5 MOS SN-UNKNOWN HRSAISC OC 3753:19 0 REF: AFL 265210 FORWARD CARGO STATION 500A RIGHT HAND SIDE SMOKE DETECTOR 473597-5 MOS SN-UNKNOWN HRS/MSC OC 3753:19 0 REF: AFL 265215 AFT CARGO STATION 727C LEFT HAND SIDE SMOKE DETECTOR 473597-5 MOS SN-UNKNOWN HRSAISC OC 3753:19 0 REF: AFL 265220 AFT CARGO STATION 7378 RIGHT HAND SIDE SMOKE DETECTOR 473597-5 MOS SN-UNKNOWN HRS/MSC OC 3753:19 0 REF: AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 56 Of 315 EFTA00619095
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL PART/SERIAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 265225 AFT CARGO STATION 757 RIGHT HAND SIDE SMOKE DETECTOR 4735974 SN-UNKNOWN REF: MOS HRSYMSC O./C AFL 265230 AFT CARGO STATION 777 LEFT HAND SIDE SMOKE DETECTOR 265235 265240 267001(s) CHAPTER 27 • 27-011-00 27.170 + 27-012-00 27.175 + 27-013-01 27.180 473597-5 SN-UNKNOWN REF: AFT CARGO STATION 4735974 SN-UNKNOWN REF: AFT CARGO STATION MOS HRSYMSC O/C AFL 857 RIGHT HAND SIDE SMOKE DETECTOR MOS HRS/MSC O./C AFL 877 RIGHT HAND SIDE SMOKE DETECTOR 4735974 MOS SN-UNKNOWN HRS/MSC O/C REF: AFL 3753:19 0 3753:19 0 3753:19 0 3753:19 0 VISUAL INSPECT PORTABLE HALON FIRE EXTINGUISHERS FOR GENERAL CONDITION AND SERVICEABILITY PKG 1 MOS 1 HRS/MSC REF: AFL FLIGHT CONTROLS GENERAL VISUAL INSPECTION OF THE FORWARD AILERON MECHANICAL COMPONENTS MOS HRS/MSC 4000 REF: BTC 27-011-00-CH AFL GENERAL VISUAL INSPECTION OF THE AILERON TRANSFER MECHANISM MOS HRSAiSC REF: BTC 27-012-00-CH AFL 1.8 3:37 2 177.97 3709:19 884 177.97 6000 3709:19 884 GENERAL VISUAL INSPECTION LEFT WING AILERON MECHANICAL COMPONENTS FROM THE AILERON PCU TO THE AILERON AND THE FLIGHT SPOILER MECHANICAL CONTROL PATH REF: BTC 27-013-01-CH MOS HRSAiSC 4000 AFL 177.97 3709:19 884 + 27-013-02 GENERAL VISUAL INSPECTION RIGHT WING AILERON MECHANICAL COMPONENTS FROM THE AILERON PCU TO THE AILERON AND THE FLIGHT SPOILER MECHANICAL CONTROL PATH 27.181 + 27-016-00 27.190 REF: EITC 27-013-02-01 MOS HRS/MSC 4000 AFL OPERATIONAL CHECK THE AILERON SPRING CARTRIDGE AND TRANSFER MECHANISM REF: EITC 27-016-00-CH MOS HRS/MSC 6000 AFL 177.97 3709:19 884 177.97 3709:19 884 PKG 13-JUN-2014 3749:42 920 08-OCT-1999 44 38 08-OCT-1999 44 38 08-OCT-1999 44 38 08-OCT-1999 44 38 08-OCT-1999 44 38 4044 6044 4044 4044 6044 290:41 2290:41 290:41 290:41 2290:41 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 57 Of 315 EFTA00619096
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING + 27-018-00 (s) 27.195 + 27-022-00 (s) 27.205 FUNCTIONAL CHECK THE AILERON SPRING CARTRIDGE AND TRANSFER MECHANISM PKG 33 REF: BTC 27-018-00-01 MOS 144 HRSAISC AFL 35.27 219:47 59 PKG 29-AUG-201I 3533:32 863 FUNCTIONAL CHECK THE FORCE REQUIRED TO EXTEND AND COLLAPSE THE A AND B SYSTEM AILERON POWER PKG CONTROL UNIT INPUT POGO'S PKG 33 REF: BTC 27-022-00-01 MOS 144 HRSAiSC AFL 35.27 219:47 59 27-024-00 FUNCTION CHECK THE 'A" AND'S' SYSTEM AILERON POWER CONTROL UNIT INTERNAL LEAKAGE IN A LOADED CONDITION. 27.260 + 27-026-01 (s) 27.210 + 27-026-02 (s) 27.211 + 27-028-00 27.215 + 27-030-00 27.220 + 27-032-00 (s) 27.230 27-033-00 (01) 27.267 27-033-00 (02) 27.380 REF: BTC 27-024-00-01 MOS HRS/MSC 12500 AFL LUBRICATE LEFT WING AILERON MECHANICAL CONTROL PATH AND AILERON POWER CONTROL UNITS PKG 31 .32 .33 MOS 36 HRSYMSC REF: BTC 27-026-01-CH AFL LUBRICATE RIGHT WING AILERON MECHANICAL CONTROL PATH PKG 31 .32 .33 MOS 36 HRSYMSC REF: BTC 27-026-02-01 AFL DETAILED VISUAL INSPECTION OF THE AILERON FEEL AND CENTERING SPRINGS 177.97 3709:19 884 35.27 219:47 59 35.27 219:47 59 MOS 177.97 HRSAISC 6000 3709:19 REF: BTC 27-028-00-01 AFL 884 OPERATIONAL CHECK HYDRAUUC POWER OFF. THE AILERON CONTROL SURFACES FOR FULL RANGE OF TRAVEL AND FREEDOM OF MOVEMENT REF: BTC 27-030-00-01 MOS HRSAiSC 6000 AFL FUNCTIONAL CHECK THE AILERON SYSTEM CONTROL WHEEL FORCES PKG 33 MOS 144 HRSYMSC REF: BTC 27-032-00-01 AFL FUNCTIONALLY CHECK THE REF: BTC 27-033-00-01 FUNCTIONALLY CHECK THE REF: BTC 27-033-00-02 LEFT WING AILERON TAB FREEPLAY. MOS HRSAiSC 8000 AFL RIGHT WING AILERON TAB FREEPLAY. MOS HRS/MSC 8000 AFL 177.97 3709:19 884 35.27 219:47 59 177.97 3709:19 884 177.97 3709:19 884 29-AUG-2011 3533:32 863 08-OCT-1999 44 38 PKG 29-AUG-2011 3533:32 863 PKG 29-AUG-2011 3533:32 863 08-OCT-1999 44 38 08-OCT-1999 44 38 PKG 29-AUG-2011 3533:32 863 08-OCT-1999 44 38 08-OCT-1999 44 38 12544 6044 6044 8044 8044 8790:41 2290:41 2290:41 4290:41 4290:41 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-EffecUve GW O CAMP SYSTEMS 58 Of 315 EFTA00619097
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING + 27-034-01 (s) 27.235 + 27-034-02 (s) 27.236 + 27-035-00(01) 27.240 + 27-035-00 (02) DETAILED VISUAL INSPECTION LEFT WING AILERON BALANCE BAY SEALS PKG 31 .32 .33 MOS 36 HRS/MSC REF: BTC 27-034-01-01 AFL DETAILED VISUAL INSPECTION RIGHT WING AILERON BALANCE BAY SEALS PKG 31 .32 .33 MOS 36 HRSAISC REF: BTC 27-034-02-01 AFL FUNCTIONALLY CHECK LEFT WING AILERON SURFACE FREEPLAY MOS HRS/MSC 8000 REF: BTC 27-035-00-01 AFL FUNCTIONALLY CHECK RIGHT WING AILERON SURFACE FREEPLAY 35.27 219:47 59 PKG 29-AUG-201I 3533:32 863 PKG 35.27 29-AUG-2011 219:47 3533:32 59 863 177.97 08-OCT-1999 3709:19 44 8044 4290:41 884 38 MOS 177.97 08-OCT-1999 27.241 HRSAISC 8000 3709:19 44 8044 4290:41 REF: BTC 27-035-00-02 AFL 884 38 + 27-036-00 DETAIL INSPECTION OF AFT RUDDER QUADRANT TORQUE TUBE ASSEMBLY. FEEL AND CENTERING UNIT AND ASSOCIATED INPUT/OUTPUT RODS. 1. AFT RUDDER QUADRANT. 2. AFT RUDDER QUADRANT INPUT ROD. 3. AFT RUDDER LOWER BELLCRANK 4. RUDDER POWER CONTROL INPUT CRANK. 5. RUDDER TRIM AND FEEL ROD. 6. RUDDER TORQUE TUBE. 7. RUDDER TORQUE TUBE CENTER CRANK. 8. RUDDER TORQUE TUBE UPPER CRANK. 9. FEEL AND CENTERING UNIT. 10. FEEL AND CENTERING UNIT OUTPUT ROD. MOS 177.97 08-OCT-1999 27.245 HRS/MSC 6000 3709:19 44 6044 2290:41 REF: EITC 27-036-00-CH AFL 884 38 + 27-038-00 GENERAL VISUAL INSPECTION OF RUDDER FORWARD MECHANICAL CONTROL PATH MOS 177.97 08-OCT-1999 27.250 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 27-038-00-01 AFL 884 38 27-040-00 (s) LUBRICATE RUDDER FEEUCENTERING UNIT THE RUDDER FEEL AND CENTERING UNIT SPRING SLIDER PKG 65C25410-6 PKG 32 .33 MOS 72 35.27 29-AUG-2011 27.255 2070 HRSAISC 219:47 3533:32 REF: BTC 27-040-00-01 AFL 59 863 27-041-00 OPERATIONAL CHECK THE MAIN RUDDER PCU FORCE FLIGHT MONITOR MOS 71.5 22-AUG-2008 27.925 HRS/MSC 10000 492:31 3260:48 13260:48 9507:29 REF: BTC 27-041-004N AFL 140 782 27-043-00 (s) OPERATIONAL CHECK THE RUDDER PCU OVERRIDES PKG PKG 32 .33 MOS 72 35.27 29-AUG-2011 27.930 HRS/MSC 219:47 3533:32 REF: BTC 27-043-00-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-EffecUve CM O CAMP SYSTEMS 59 Of 315 EFTA00619098
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING + 27-046-00 (s) 27.270 27-047-00 27.935 27-048-01 LUBRICATE MAIN AND STANDBY RUDDER POWER CONTROL UNIT ROD ENDS AND RUDDER HINGES PKG 32 .33 MOS 72 HRSYSASC REF: BTC 27-046-00-01 AFL 35.27 219:47 59 FUNCTIONAL CHECK THE RUDDER POWER CONTROL UNIT INTERNAL LEAKAGE IN A LOADED CONDITION REF: BTC 27-047-00-01 MOS HRSAISC 10000 AFL PKG 29-AUG-201 3533:32 863 71.5 22-AUG-2008 492:31 3260:48 13260:48 9507:29 140 782 FUNCTIONALLY CHECK THE RUDDER PCU RELIEF VALVE (AUTHORITY LIMITER) DURING RUDDER PCU LEAKAGE. THIS TASK IS SATISFIED BY ACCOMPLISHMENT OF TASK 27-047-00. MOS 71.5 22-AUG-2008 27.936 HRSAISC 10000 492:31 3260:48 13260:48 9507:29 REF: BTC 27-048-00-01 AFL 140 782 27-052-00 OPERATIONAL CHECK OF THE STANDBY RUDDER SYSTEM POWER CONTROL UNIT. DAYS 176 12-FEB-2014 27.920 HRSAISC 5000 9:45 3743:34 8743:34 4990:15 REF: BTC 27-052-00-01 AFL 5 917 27-054-00 FUNCTIONALLY CHECK THE STANDBY RUDDER POWER CONTROL UNIT FOR INTERNAL LEAKAGE IN A LOADED CONDITION. MOS 177.97 08-OCT-1999 27.960 HRS/MSC 12500 3709:19 44 12544 8790:41 REF: BTC 27-054-00-01 AFL 884 38 + 27-056-00 GENERAL VISUAL INSPECTION STANDBY RUDDER POWER CONTROL UNIT WITH HYDRAULIC POWER ON MOS 177.97 08-OCT-1999 27.280 HRSAISC 5000 3709:19 44 5044 1290:41 REF: BTC 27-056-00-CH AFL 884 38 + 27-058-00 DETAILED VISUAL INSPECTION STANDBY RUDDER POWER CONTROL UNIT FORE AND AFT ATTACHMENT POINTS (STRUCTURE TO PCU TO RUDDER SURFACE) MOS 177.97 08-OCT-1999 27.285 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 27-058-00-01 AFL 884 38 + 27-060-00 OPERATIONAL CHECK WHEEL TO RUDDER INTERCONNECT SYSTEM (WTRIS) MOS 177.97 08-OCT-1999 27.290 HRSYSASC 6000 3709:19 44 6044 2290:41 REF: See Workcard AFL 884 38 + 27-062-00 OPERATIONAL CHECK RUDDER TRIM THROUGH THE FULL RANGE OF MOVEMENT MOS 177.97 08-OCT-1999 27.291 HRSAISC 6000 3709:19 44 6044 2290:41 REF: See Workcard AFL 884 38 + 27-064-00 FUNCTIONAL CHECK THE RUDDER SURFACE FREEPLAY MOS 177.97 08-OCT-1999 27.300 HRS/MSC 8000 3709:19 44 8044 4290:41 REF: See Workcard AFL 884 38 CMR 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective GW O CAMP SYSTEMS 60 Of 315 EFTA00619099
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-065-00 (s) DETAILED VISUAL INSPECTION OF THE RUDDER SINGLE ELEMENT DUAL LOAD PATH FEEL AND CENTERING COMMAND AND GROUND PATH COMPONENTS PKG 32 .33 MOS 72 27.305 HRSYMSC REF: BTC 27-065-00-01 AFL 27-066-00 (s) PKG 35.27 29-AUG-2011 219:47 3533:32 59 863 DETAILED VISUAL INSPECTION OF THE RUDDER SINGLE ELEMENT DUAL LOAD PATH RUDDER PCU INPUT PKG COMPONENTS. PKG 32 .33 MOS 72 27.310 HRSAISC REF: BTC 27-066-00-01 AFL + 27-068-00 OPERATIONAL CHECK ELEVATOR FEEL SHIFT FUNCTION MOS 27.311 MRS/MSC 6000 REF: BTC 27-068-00-0I AFL + 27-070-00 (s) LUBRICATE ELEVATOR MECHANICAL CONTROL PATH PKG 32 .33 MOS 72 27.318 HRSAiSC REF: See Workcard AFL + 27-073-00 GENERAL VISUAL INSPECTION OF THE ELEVATOR MECHANICAL CONTROL PATH MOS 27.320 HRSAISC 6000 REF: BTC 27-073-00-01 AFL 35.27 29-AUG-201I 219:47 3533:32 59 863 177.97 08-OCT-1999 3709:19 44 6044 2290:41 884 38 PKG 35.27 29-AUG-2011 219:47 3533:32 59 863 177.97 08-OCT-1999 3709:19 44 6044 2290:41 884 38 + 27-074-00 OPERATIONAL CHECK HYDRAUUC POWER OFF. THE ELEVATOR CONTROL SURFACES FOR FULL RANGE OF TRAVEL AND FREEDOM OF MOVEMENT MOS 177.97 08-OCT-1999 27.325 MRS/MSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-074-00-01 AFL 884 38 + 27-075-01 GENERAL VISUAL INSPECTION OF THE LEFT ELEVATOR BALANCE WEIGHT INSTALLATION AND ELEVATOR TAB CONTROL MECHANISM MOS 177.97 08-OCT-1999 27.330 FIRS/MSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-075-01-0I AFL 884 38 + 27-075-02 GENERAL VISUAL INSPECTION OF THE RIGHT ELEVATOR BALANCE WEIGHT INSTALLATION AND ELEVATOR TAB CONTROL MECHANISM 27.331 + 27-076-00 27.335 27-078-00 27.965 REF: BTC 27-075-02-01 MOS HRSAiSC 6000 AFL 177.97 08-OCT-1999 3709:19 44 6044 2290:41 884 38 GENERAL VISUAL INSPECTION OF THE ELEVATOR POWER CONTROL UNITS WITH HYDRAULIC POWER ON REF: BTC 27-076-00-01 MOS FIRS/MSC 6000 AFL 177.97 08-OCT-1999 3709:19 44 6044 2290:41 884 38 FUNCTIONALLY CHECK THE W AND "B" SYSTEM ELEVATOR POWER CONTROL UNIT FOR INTERNAL LEAKAGE IN A LOADED CONDITION. REF: BTC 27-078-00-01 MOS HRS1MSC 12500 AFL 177.97 08-OCT-1999 3709:19 44 12544 8790:41 884 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 61 Of 315 EFTA00619100
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE PART/SERIAL (ENH) AFH MAX TIME LIMIT REMAINING 27-080-00 27.340 + 27-082-00 (s) DRAIN AND LEAK CHECK ELEVATOR PITOT-STATIC SYSTEM MOS 177.97 08-OCT-1999 HRSAISC 6000 3709:19 44 REF: BTC27-080-00-01 AFL 884 38 OPERATIONAL CHECK ELEVATOR CONTROL COLUMN OVERRIDE ASSEMBLY PKG 6044 2290:41 PKG 33 MOS 144 35.27 29-AUG-2011 27.345 HRSYMSC 219:47 3533:32 REF: BTC 27-082-00-01 AFL 59 863 + 27-084-00 (s) FUNCTIONALLY CHECK FORCE NECESSARY TO BREAKOUT THE ELEVATOR CONTROL COLUMN OVERRIDE PKG ASSEMBLY PKG 33 MOS 144 35.27 29-AUG-201I 27.350 HRS/MSC 219:47 3533:32 REF: BTC 27-084-00-01 AFL 59 863 + 27-086-00 OPERATIONAL CHECK ELEVATOR TAB CONTROL SYSTEM MOS 177.97 08-OCT-1999 27.355 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 27-086-00-01 AFL 884 38 + 27-088-00 FUNCTIONAL CHECK STALL WARNING SYSTEMS MOS 177.97 08-OCT-1999 27.360 HRS/MSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-088-00-01 AFL 884 38 27-09-21 (I) SYSTEM A FLIGHT CONTROL MODULE 65-44891-7 MOS 177.97 08-OCT-1999 27.120 6597 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-09-21 (2) SYSTEM B FLIGHT CONTROL MODULE 65-44891-7 MOS 177.97 08-OCT-1999 27.120 6578 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-09-31 (I) SYSTEM A SPOILER SHUTOFF VALVE AV13J5147 MOS 177.97 08-OCT-1999 27.485 T14421 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-09-31 (2) SYSTEM A FLIGHT CONTROL SHUTOFF VALVE AV13J5147 MOS 177.97 08-OCT-1999 27.486 T14372 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-09-31 (3) SYSTEM B SPOILER SHUTOFF VALVE AV13J5147 MOS 177.97 08-OCT-1999 27.485 T17515 HRSYSASC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-09-31 (4) SYSTEM B FLIGHT CONTROL SHUTOFF VALVE AV13J5147 MOS 177.97 08-OCT-1999 27.486 T17500 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 62 Of 315 O CAMP SYSTEMS EFTA00619101
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-09-45 P5-3 FLIGHT CONTROL PANEL 233A3209-2 MOS 119.8 13-AUG-2004 27.090 D00162 HRS/MSC 0/C 1968:14 1785:05 REF: AFL 476 446 27-09-51 (1) HYDRAULIC SYSTEM A COMPENSATOR CARTRIDGE 1U1065-2 MOS 177.97 08-OCT-1999 27.065 18336A HRSYMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-09-51 (2) HYDRAULIC SYSTEM B COMPENSATOR CARTRIDGE 1U1065-2 MOS 177.97 08-OCT-1999 27.065 18331A HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 + 27-092-00 (s) FUNCTIONALLY CHECK FORCE NECESSARY TO COLLAPSE AND EXTEND THE ELEVATOR INPUT ROD POGO'S PKG PKG 33 MOS 144 35.27 29-AUG-201I 27.365 HRSAISC 219:47 3533:32 REF: BTC 27-092-00-0I AFL 59 863 27-093-00 (01) DETAILED VISUAL INSPECTION OF THE LEFT ELEVATOR TAB RODS. TAB MECHANISM CMR MOS 131.5 22-AUG-2003 27.940 HRSAiSC 4000 2411:19 1342 5342 1588:41 REF: BTC 27-093-00-01 AFL 2000 571 351 2351 1429 27-093-00 (02) DETAILED VISUAL INSPECTION OF THE RIGHT ELEVATOR TAB RODS. TAB MECHANISM CMR MOS 131.5 22-AUG-2003 27.945 HRSAiSC 4000 2411:19 1342 5342 1588:41 REF: BTC 27-093-00-02 AFL 2000 571 351 2351 1429 + 27-094-00 BITE CHECK ELEVATOR AUTOPILOT SERVO PRESSURE REGULATOR MOS 177.97 08-OCT-1999 27.370 HRSAiSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-094-00-01 AFL 884 38 27-098-01 FUNCTIONALLY CHECK THE ELEVATOR SURFACE FREEPLAY MOS 177.97 08-OCT-1999 27.378 HRSAiSC 8000 3709:19 44 6044 4290:41 REF: BTC 27-098-01-01 AFL 884 38 27-099-00 (01) FUNCTIONALLY CHECK THE LEFT ELEVATOR TAB FREEPLAY CMR MOS 131.5 22-AUG-2003 27.950 HRSYMSC 4000 2411:19 1342 5342 1588:41 REF: BTC 27-099-00-01 AFL 2000 571 351 2351 1429 27-099-00 (02) FUNCTIONALLY CHECK THE RIGHT ELEVATOR TAB FREEPLAY CMR MOS 131.5 22-AUG-2003 27.955 HRSAISC 4000 2411:19 1342 5342 1588:41 REF: BTC 27-099-00-02 AFL 2000 571 351 2351 1429 + 27-100-00 (s) DETAILED VISUAL INSPECTION ELEVATOR PUSHRODS (BETWEEN OUTPUT TOROUE TUBE AND CONTROL PKG SURFACE) AND ATTACHMENT BOLTS PKG 32 .33 MOS 72 35.27 29-AUG-2011 27.385 HRSAiSC 219:47 3533:32 REF: BTC 27-100-00-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 63 Of 315 EFTA00619102
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YGOO6) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: O7-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING • 27-101-00 (s) PERFORM DETAILED VISUAL INSPECTION OF THE SINGLE ELEMENT DUAL LOAD PATH FEEL AND CENTERING UNIT OUTPUT ROD. PKG PKG 32 .33 MOS 72 35.27 29-AUG-201I 27.395 HRSAISC 219:47 3533:32 REF: BTC 27-101-00-01 AFL 59 863 + 27-102-00 (s) LUBRICATE STABILIZER TRIM ACTUATOR AND ACTUATOR GIMBAL PINS AND BALLNUT PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 27.400 HRSAISC 29:58 3723:21 REF: EITC 27-102-00-CH AFL 14 908 + 27-104-00 (s) LUBRICATE FORWARD STABILIZER TRIM MECHANISM DRIVE TRAIN PKG PKG 33 MOS 144 35.27 29-AUG-201I 27.405 HRS/MSC 219:47 3533:32 REF: EITC 27-104-00-0I AFL 59 863 + 27-106-00 FUNCTIONAL CHECK STABILIZER TRIM ACTUATOR SECONDARY STABILIZER TRIM BRAKE 251A4510-6 MOS 71.5 22-AUG-2008 27.410 KE00324 HRSAISC 6000 492:31 3260:48 9260:48 5507:29 REF: BTC 27-106-00-01 AFL 140 782 27-107-00 SERVICE STABILIZER TRIM ACTUATOR 251A4510-6 MOS 71.5 22-AUG-2008 27.185 KE00324 HRS/MSC 6000 492:31 3260:48 9260:48 5507:29 REF: EITC 27-107-00-CH AFL 140 782 + 27-108-00 STABILIZER TRIM ACTUATOR RESTORE 251A4510-6 MOS 71.5 22-AUG-2008 27.415 KE00324 HRSAISC 25000 TS0:0 492:31 3260:48 28260:48 2450729 REF: EITC 27-108-00-CH AFL 140 782 27-11-11 (1) LEFT AILERON ASSEMBLY 113A7100-1 MOS 177.97 08-OCT-1999 27.450 HDH0125 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-11-11 (2) RIGHT AILERON ASSEMBLY 113A7100-2 MOS 177.97 08-OCT-1999 27.450 HDH0128 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 27-11-21 (1) LEFT AILERON TAB ASSEMBLY 113A7200-3 MOS 177.97 08-OCT-1999 27.465 HDH0121 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-11-21 (2) RIGHT AILERON TAB ASSEMBLY 1 I 3A7200-4 MOS 177.97 08-OCT-1999 27.465 HDH0121 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-11-54 AILERON TRIM ACTUATOR R15048 MOS 177.97 08-OCT- I 999 27.050 980613 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 64 Of 315 O CAMP SYSTEMS EFTA00619103
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-11-71 (1) 27.475 27-11-71 (2) 27.475 27-11-94 (1) 31.315 27-11-94 (2) NO. 1 AILERON PCU 251A2160-2 0638 REF: NO. 2 AILERON PCU MOS HRSAISC O/C AFL TSN:44 TSN:38 251A2160-2 MOS 0613 HRSAISC O/C TSN:44 REF: AFL TSN:38 AILERON/RUDDER TRIM MODULE ASSEMBLY 177.97 08-OCT-1999 3753 44 922 38 177.97 3753 922 08-OCT-1999 44 38 69-73703-8 MOS 177.97 08-OCT-1999 D02312 HRS./MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 AILERON/RUDDER TRIM INDICATOR 10166NO1N00 MOS 177.97 08-OCT-1999 31.265 980627338A HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 + 27-110-00 DETAILED VISUAL INSPECTION OF THE STABILIZER TRIM JACKSCREW. BALLNUT. BALLNUT RETURN TUBES AND THE UPPER AND LOWER GIMBALL PINS. MOS 24 9.23 30-OCT-2013 30-OCT-2015 449E 27.420 HRSYSASC 24:26 3728:53 REF: BTC 27-110-00-01 AFL 11 911 + 27-112-00 OPERATIONAL CHECK STABILIZER TRIM LIMIT SWITCHES (FLAPS UP AND FLAPS DOWN) MOS 177.97 08-OCT-1999 27.425 FIRSOASC 6000 3709:19 44 6044 2290:41 REF: BTC 27-112-00-CH AFL 884 38 + 27-114-00 OPERATIONAL CHECK STABILIZER TRIM CONTROL COLUMN SWITCHING. MOS 177.97 08-OCT-1999 27.430 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 27-114-00-01 AFL 884 38 + 27-116-00 OPERATIONAL CHECK MAIN CONTROL COLUMN CUTOUT SWITCHES MOS 177.97 08-OCT-1999 27.435 HRS./MSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-116-00-01 AFL 884 38 + 27-118-00 OPERATIONAL CHECK AISLE STAND STABILIZER TRIM OVERRIDE SWITCH MOS 177.97 08-OCT-1999 27.440 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 27-118-00-01 AFL 884 38 + 27-120-00 DETAILED VISUAL INSPECTION OF THE UPPER AND LOWER STABILIZER TRIM FORWARD MECHANISM RETENTION TURNBUCKLES AND TURNBUCKLE ATTACHMENT POINTS MOS 27.445 HRSYSASC 6000 REF: EITC 27-120-00-CH AFL 177.97 08-OCT-1999 3709:19 44 6044 2290:41 884 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 65 Of 315 EFTA00619104
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE PART/SERIAL NEXT DUE MAX ( ENH) AFH LIMIT TIME REMAINING • 27-121-00 GENERAL VISUAL INSPECTION OF THE FORWARD STABILIZER TRIM MECHANISM AND THE SPEEDBRAKE LEVER ASSEMBLY AND AUTO SPEEDBRAKE ELECTRIC ACTUATOR. ACTUATOR ROD END. AND FORWARD ATTACHMENT POINT MOS 177.97 08-OCT-1999 27.460 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-121-00-0I AFL 884 38 + 27-122-00 OPERATIONAL CHECK CONTROL COLUMN STABILIZER TRIM ARM AND DIRECTIONAL SWITCHES FOR MOVEMENT OF A SINGLE SWITCH TO CAUSE STABILIZER MOVEMENT MOS 177.97 08-OCT-1999 27.470 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: EITC 27-122-00-CH AFL 884 38 + 27-132-00 (s) CHECK FLAP POWER DRIVE UNIT OIL LEVEL AND SERVICE AS REQUIRED PKG 256A3515-2 PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.480 5024 HRS/MSC 219:47 3533:32 REF: BTC 27-132-00-01 AFL 59 863 + 27-134-00 (s) REPLACE FLAP POWER DRIVE UNIT OIL PKG 256A3515-2 PKG 33 MOS 144 35.27 29-AUG-201I 27.490 5024 HRSAISC 219:47 3533:32 REF: EITC 27-134-00-0I AFL 59 863 + 27-136-01 (s) LUBRICATE LEFT WING FLAP SKEW SENSOR MECHANISM PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.495 HRSAiSC 219:47 3533:32 REF: BTC 27-136-01-01 AFL 59 863 + 27-136-02 (s) LUBRICATE RIGHT WING FLAP SKEW SENSOR MECHANISM PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.496 HRS/MSC 219:47 3533:32 REF: BTC 27-136-02-01 AFL 59 863 + 27-138-00 (01) (s) LUBRICATE LEFT WING FLAP DRIVE TORQUE TUBE COUPLINGS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.500 HRSAISC 219:47 3533:32 REF: EITC 27-138-00-01 AFL 59 863 + 27-138-00 (02) (s) LUBRICATE RIGHT WING FLAP DRIVE TORQUE TUBE COUPLINGS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.501 HRSAISC 219:47 3533:32 REF: BTC 27-138-00-02 AFL 59 863 + 27-140-01 (s) CHECK LEFT WING FLAP DRIVE TRANSMISSION OIL LEVEL AND SERVICE AS REQUIRED PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.505 HRSAISC 219:47 3533:32 REF: BTC 27-140-01-01 AFL 59 863 + 27-140-02 (s) CHECK RIGHT WING FLAP DRIVE TRANSMISSION OIL LEVEL AND SERVICE AS REQUIRED PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.506 HRS/MSC 219:47 3533:32 REF: BTC 27-140-02-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 66 Of 315 EFTA00619105
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING • 27-142-01 (s) REPLACE LEFT WING FLAP DRIVE TRANSMISSION OIL PKG PKG 33 MOS 144 35.27 29-AUG-201I 27.510 HRSAISC 219:47 3533:32 REF: BTC 27-142-01-01 AFL 59 863 + 27-142-02(s) REPLACE RIGHT WING FLAP DRIVE TRANSMISSION OIL PKG PKG 33 MOS 144 35.27 29-AUG-201I 27.511 HRSAISC 219:47 3533:32 REF: BTC 27-142-02-01 AFL 59 863 + 27-144-00 (01) (s) LUBRICATE LEFT WING FLAP TRANSMISSION UNIVERSAL JOINTS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.515 HRS/MSC 219:47 3533:32 REF: BTC 27-144-00-0I AFL 59 863 + 27-144-00 (02) (a) LUBRICATE RIGHT WING FLAP TRANSMISSION UNIVERSAL JOINTS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.516 HRSAISC 219:47 3533:32 REF: BTC 27-144-00-02 AFL 59 863 27-146-00 (01) (s) LUBRICATE THE LEFT WING FLAP BALLSCREW ASSEMBLY PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.970 HRSAISC 219:47 3533:32 REF: BTC 27-146-00-0I AFL 59 863 27-146-00 (02) (a) LUBRICATE THE RIGHT WING FLAP BALLSCREW ASSEMBLY PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.975 HRSAISC 219:47 3533:32 REF: BTC 27-146-00-02 AFL 59 863 + 27-148-01 FUNCTIONAL CHECK LEFT WING TRAILING EDGE FLAPS BALLSCREW ASSEMBLY BACKLASH. MOS 177.97 08-OCT-1999 27.520 HRSYMSC 3709:19 44 REF: BTC 27-148-01-01 AFL 25000 884 38 25038 24116 + 27-148-02 FUNCTIONAL CHECK RIGHT WING TRAILING EDGE FLAPS BALLSCREW ASSEMBLY BACKLASH. MOS 177.97 08-OCT-1999 27.521 HRSAISC 3709:19 44 REF: BTC 27-148-02-01 AFL 25000 884 38 25038 24116 27-150-00 (01) (s) LUBRICATE THE LEFT WING FLAP DRIVE TORQUE TUBE SUPPORT PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.980 HRSAISC 219:47 3533:32 REF: BTC 27-150-00-CH AFL 59 863 27-150-00 (02) (s) LUBRICATE THE RIGHT WING FLAP DRIVE TORQUE TUBE SUPPORT PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.985 HRSAISC 219:47 3533:32 REF: BTC 27-150-00-02 AFL 59 863 + 27-152-01 (s) LUBRICATE #4 FLAP TRANSMISSION ANGLEJTEE GEARBOX UNIVERSAL JOINTS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.525 HRS/MSC 219:47 3533:32 REF: BTC 27-152-01-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-EffecUve CM O CAMP SYSTEMS 67 Of 315 EFTA00619106
CAMP A.ati gap.. M.a...,e.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-152-02(s) • 27.526 + 27-154-00 27.530 + 27-156-00 27.535 + 27-158-00 LUBRICATE t/5 FLAP TRANSMISSION ANGLE/TEE GEARBOX UNIVERSAL JOINTS PKG 31 .32 .33 MOS 36 HRSAISC REF: BTC 27-152-02-01 AFL OPERATIONAL CHECK FLAP LOAD RELIEF SYSTEM REF: BTC 27-154-00-0I MOS HRSAISC 2500 AFL FUNCTION CHECK THE FLAP LOAD RELIEF SYSTEM REF: BTC 27-156-00-01 MOS HRS1MSC 10000 AFL FUNCTIONAL CHECK THE ALTERNATE FLAP DRIVE SYSTEM 35.27 219:47 59 PKG 29-AUG-201I 3533:32 863 101.17 02-MAR-2006 1243:41 2509:38 5009:38 1256:19 313 609 177.97 08-OCT-1999 3709:19 44 10044 6290:41 884 38 MOS 177.97 08-OCT-1999 27.540 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-158-00-01 AFL 884 38 27-160-00 OPERATIONALLY CHECK THE FLAP SKEW SYSTEM BY INTIATING A BITE CHECK AT THE FLAP SLAT ELECTRONICS UNIT (FSEU) 27.995 27-162-00 27.990 + 27-164-00 REF: BTC 27-160-00-01 MOS HRSYMSC 1250 AFL OPERATIONALLY CHECK THE FLAP ASYMMETRY SYSTEM REF: BTC 27-162-00-01 MOS HRSAISC 750 AFL OPERATIONAL CHECK THE FLAP UN COMMANDED MOTION PROTECTION SYSTEM BY INITIATING A BITE CHECK OF THE FLAP SLAT ELECTRONICS UNIT. 95.63 18-AUG-2006 1119:29 2633:50 3883:50 130:31 289 633 35.27 29-AUG-201 I 219:47 3533:32 4283:32 530:13 59 863 MOS 177.97 08-OCT-1999 27.550 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-164-00-0I AFL 884 38 + 27-166-00 (s) DETAILED VISUAL INSPECTION OF THE TRAILING EDGE FLAP LEVER SENSOR. LINKAGE. ROD AND ROD ENDS PKG PKG 33 MOS 144 35.27 29-AUG-201I 27.555 HRSYMSC 219:47 3533:32 REF: BTC 27-166-00-0I AFL 59 863 + 27-168-01 OPERATIONAL CHECK LEFT WING TRAILING EDGE FLAP TRANSMISSION NO-BACK BRAKES MOS 177.97 08-OCT-1999 27.560 HRSAISC 3709:19 44 REF: BTC 27-168-01-0I AFL 25000 884 38 25038 24116 + 27-168-02 OPERATIONAL CHECK RIGHT WING TRAILING EDGE FLAP TRANSMISSION NO-BACK BRAKES MOS 177.97 08-OCT-1999 27.561 HRS1MSC 3709:19 44 REF: BTC 27-168-02-0I AFL 25000 884 38 25038 24116 + 27-170-01 (s) LUBRICATE LEFT WING TRAIUNG EDGE FLAP ACTUATION MECHANISM PKG PKG 12.31 .32 .33 MOS 12 13.13 03-JUL-2013 27.565 FIRS/MSC 29:58 3723:21 REF: BTC 27-170-01-01 AFL 14 908 7-Insufficient Infonnation c-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 68 Of 315 EFTA00619107
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 27-170-02(s) • LUBRICATE RIGHT WING TRAILING EDGE FLAP ACTUATION MECHANISM PKG PKG 12 .31 .32 .33 MOS 12 13.13 03-JUL-2013 27.566 HRSAISC 29:58 3723:21 REF: BTC 27-170-02-01 AFL 14 908 + 27-171-01 GENERAL VISUAL INSPECTION LEFT WING FLAP DRIVE SEAL RIB ANGLE GEAR BOX. MLG BEAM ANGLE GEAR BOX. FLAP DRIVE TORQUE TUBES. TORQUE TUBE COUPLINGS AND SUPPORTS AND FLAP TRANSMISSIONS MOS 177.97 08-OCT-1999 27.570 HRSAISC 5000 3709:19 44 REF: BTC 27-171-01-01 AFL 884 38 + 27-171-02 GENERAL VISUAL INSPECTION RIGHT WING FLAP DRIVE SEAL RIB ANGLE GEAR BOX. MLG BEAM ANGLE GEAR BOX. FLAP DRIVE TORQUE TUBES. TORQUE TUBE COUPLINGS AND SUPPORTS AND FLAP TRANSMISSIONS MOS 27.571 HRSAiSC 5003 REF: BIC 27-171-02-0I AFL + 27-172-01 DETAILED VISUAL INSPECTION OF THE LEFT WING TRAILING EDGE FLAP ACTUATION MECHANISM TO INCLUDE: 1. AFT FLAP DRIVE RODS. 2.AFT FLAP PUSH RODS. 3. INBOARD CARRIAGE ROLLERS 4. OUTBOARD CARRIAGE ROLLERS. 5. BELLCRANKS. 6. INBOARD CARRIAGE FORWARD ATTACH FITTING. 7. INBOARD CARRIAGE ATTACH LINK. 8. OUTBOARD CARRIAGE FORWARD ATTACH FITTING. 9. OUTBOARD CARRIAGE ATTACH LINK. 10. INBOARD PROGRAMMING ROLLERS. 11. AFT FLAP TRACK ATTACH FITTING. 12. AFT FLAP TRACK ROLLERS. 13. OUTBOARD PROGRAMMING ROLLERS. 177.97 08-OCT-1999 3709:19 44 884 38 MOS 177.97 08-OCT-1999 27.575 HRSYMSC 3709:19 44 REF: BIC 27-172-014N AFL 12030 884 38 + 27-172-02 DETAILED VISUAL INSPECTION OF THE RIGHT WING TRAILING EDGE FLAP ACTUATION MECHANISM TO INCLUDE: 1. AFT FLAP DRIVE RODS. 2. AFT FLAP PUSH RODS. 3. INBOARD CARRIAGE ROLLERS. 4. OUTBOARD CARRIAGE ROLLERS. 5. BELLCRANKS. 6. INBOARD CARRIAGE FORWARD ATTACH FITTING. 7. INBOARD CARRIAGE ATTACH LINK. 8. OUTBOARD CARRIAGE FORWARD ATTACH FITTING. 9. OUTBOARD CARRIAGE ATTACH LINK. 10. INBOARD FLAP PROGRAMMING ROLLERS. 11. AFT FLAP TRACK ATTACH FITTING. 12. AFT FLAP TRACK ROLLERS. 13. OUTBOARD PROGRAMMING ROLLERS. MOS 177.97 08-OCT-1999 27.576 HRSAISC 3709:19 44 REF: EITC 27-172-024N AFL 12000 884 38 + 27-174-01 LUBRICATE LEFT WING VS 1.2. AND 3 TRAILING EDGE FLAP TRACK FORWARD ATTACHMENT POINT PINS 27.580 + 27-174-02 27.581 MOS 177.97 HRSAISC 3709:19 REF: EITC 27-174-014N AFL 4003 884 LUBRICATE RIGHT WING WS 6. 7. AND 8 TRAILING EDGE FLAP TRACK FORWARD ATTACHMENT POINT PINS MOS 177.97 HRSAISC 3709:19 REF: EITC 27-174-02-0I AFL 4003 884 08-OCT-1999 44 38 08-OCT-1999 44 38 + 27-176-01 (s) LUBRICATE LEFT WING #4 INBOARD FLAP TRACK ATTACHMENT FITTINGS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.585 HRS/MSC 219:47 3533:32 REF: EITC 27-176-01-0I AFL 59 863 5044 1290:41 5044 1290:41 12038 11116 12038 11116 4038 3116 4038 3116 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 69 Of 315 EFTA00619108
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING 27-176-02(s) • LUBRICATE RIGHT WING X5 INBOARD FLAP TRACK ATTACHMENT FITTINGS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.586 HRSAiSC 219:47 3533:32 REF: BTC 27-176-02-0I AFL 59 863 + 27-178-00 CHECK ALTERNATE FLAP DRIVE GEARBOX OIL LEVEL AND SERVICE AS REQUIRED MOS 177.97 08-OCT-1999 27.590 HRSAiSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-178-00-01 AFL 884 38 + 27-182-00 (s) LUBRICATE SPOILER MIXER PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.595 HRS/MSC 219:47 3533:32 REF: BTC 27-182-00-01 AFL 59 863 + 27-182-01 (s) LUBRICATE LEFT WING SPOILER MECHANICAL CONTROL PATH PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-201I 27.600 HRSAISC 219:47 3533:32 REF: BTC 27-182-01-01 AFL 59 863 + 27-182-02 (s) LUBRICATE RIGHT WING SPOILER MECHANICAL CONTROL PATH PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.601 HRSAISC 219:47 3533:32 REF: BTC 27-182-02-01 AFL 59 863 + 27-184-00 FUNCTIONALLY CHECK THE TORQUE OF THE SPOILER RATIO CHANGER NO-BACK ASSEMBLY MOS 177.97 08-OCT-1999 27.605 HRS/MSC 22400 3709:19 44 22444 18690:41 REF: BTC 27-184-00-CH AFL 884 38 + 27-186-00 (s) LUBRICATE SPEEDBRAKE LEVER NO-BACK BRAKE PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.610 HRS/MSC 219:47 3533:32 REF: BTC 27-186-00-0I AFL 59 863 + 27-188-00 OPERATIONAL CHECK SPEEDBRAKE REFUSED TAKEOFF (RTO) SYSTEM MOS 177.97 08-OCT-1999 27.615 HRSYMSC 6000 3709:19 44 6044 2290:41 REF: BTC 27-188-00-01 AFL 884 38 + 27-190-00 OPERATIONAL CHECK SPEEDBRAKES EXTENDED LIGHT MOS 177.97 08-OCT-1999 27.620 HRSYMSC 5000 3709:19 44 5044 1290:41 REF: BTC 27-190-00-01 AFL 884 38 + 27-192-01 OPERATIONAL CHECK LEFT WING OF EACH FLIGHT SPOILER ACTUATOR OVERRIDE QUADRANT MOS 177.97 08-OCT-1999 27.625 HRS/MSC 25000 3709:19 44 25044 21290:41 REF: BTC 27-192-01-01 AFL 884 38 + 27-192-02 OPERATIONAL CHECK RIGHT WING OF EACH FLIGHT SPOILER ACTUATOR OVERRIDE QUADRANT MOS 177.97 08-OCT-1999 27.626 HRS/MSC 25000 3709:19 44 25044 21290:41 REF: BTC 27-192-02-01 AFL 884 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 70 Of 315 EFTA00619109
CAMP Atidshcafinthegnailar" Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-21-11 RUDDER 173A0100-678 MOS 177.97 08-OCT-1999 55.030 590156 HRSYMSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-21-24 STANDBY RUDDER POWER CONTROL UNIT 381200-1001 MOS 177.97 08-OCT-1999 27.150 0175 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-21-71 RUDDER CONTROL TORQUE TUBE PN MOS 27.309 SN-UNKNOWN HRS/MSC 0/C 3753:19 0 REF: AFL 27-21-82 RUDDER FEEUCENTERING UNIT 65C25410-6 MOS 27.304 2070 HRSYMSC O/C 3753:19 0 REF: AFL 27-21-87 RUDDER TRIM ACTUATOR U268 MOS 177.97 08-OCT-1999 27.635 2317 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-21-91 MAIN RUDDER POWER CONTROL UNIT 381500-1001 MOS 177.97 08-OCT-1999 27.145 0162 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-21-94 STANDBY RUDDER POWER CONTROL UNIT SHUTOFF VALVE MOTOR AV13J5147 MOS 177.97 08-OCT-1999 29.027 T14404 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-210-00 (s) FUNCTIONALLY CHECK THE INTERNAL LEAKAGE OF LEADING EDGE SLAT ACTUATORS. PKG PKG 33 MOS 144 35.27 29-AUG-2011 27.994 HRSAISC 219:47 3533:32 REF: BTC 27-210-00-01 AFL 59 863 27-212-00 (s) FUNCTIONALLY CHECK THE INTERNAL LEAKAGE OF LEADING EDGE FLAP ACTUATORS. PKG PKG 33 MOS 144 35.27 29-AUG-2011 27.996 HRSAISC 219:47 3533:32 REF: BTC 27-212-00-01 AFL 59 863 + 27-214-00 OPERATIONAL CHECK LEADING EDGE STANDBY ACTUATION SYSTEM MOS 177.97 08-OCT-1999 27.645 HRSAISC 6000 3709:19 44 6044 2290:41 REF: BTC 27-214-00-01 AFL 884 38 + 27-215-01 GENERAL VISUAL INSPECTION LEFT WING SPOILER ACTUATORS MOS 177.97 08-OCT-1999 27.650 HRSAISC 4000 3709:19 44 4044 290:41 REF: BTC 27-215-01-01 AFL 884 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 71 Of 315 EFTA00619110
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING 27-215-02 GENERAL VISUAL INSPECTION RIGHT WING SPOILER ACTUATORS MOS 177.97 08-OCT-1999 27.651 HRSAISC 4000 3709:19 44 4044 290:41 REF: BTC 27-215-02-01 AFL 884 38 27-215-03 GENERAL VISUAL INSPECTION OF THE SPOILER MECHANISM CONTROL PATH MOS 177.97 08-OCT-1999 27.017 HRSAISC 4000 3709:19 44 4044 290:41 REF: BTC 27-215-03-CH AFL 884 38 + 27-216-00 FUNCTIONAL CHECK CHECK THE AUTOSLAT SYSTEM. MOS 35.27 29-AUG-2011 27.655 HRS/MSC 1250 219:47 3533:32 4783:32 1030:13 REF: BTC 27-216-00-CH AFL 59 863 + 27-218-00 OPERATIONAL CHECK LEADING EDGE UNCOMMANDED MOTION PROTECTION SYSTEM MOS 37.1 04-JUL-2011 27.660 HRSAISC 3000 219:47 3533:32 6533:32 2780:13 REF: BTC 27-218-00-0I AFL 59 863 + 27-220-01 (s) LUBRICATE LEFT WING LEADING EDGE SLAT ROLLERS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.665 HRS/MSC 219:47 3533:32 REF: BTC 27-220-01-01 AFL 59 863 + 27-220-02 (s) LUBRICATE RIGHT WING LEADING EDGE SLAT ROLLERS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.666 HRS/MSC 219:47 3533:32 REF: BTC 27-220-02-01 AFL 59 863 + 27-222-01 (s) LUBRICATE LEFT WING LEADING EDGE SLAT TRACKS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.670 HRS/MSC 219:47 3533:32 REF: BTC 27-222-01-01 AFL 59 863 + 27-222-02 (s) LUBRICATE RIGHT WING LEADING EDGE SLAT TRACKS PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.671 HRSAISC 219:47 3533:32 REF: BTC 27-222-02-01 AFL 59 863 + 27-224-00 OPERATIONAL CHECK LEADING EDGE DEVICES UNCOMMANDED MOTION PROTECTION USING STANDBY HYDRAULIC SYSTEM MOS 27.675 HRSAiSC 1250 REF: BTC 27-224-00-01 AFL 35.27 29-AUG-2011 219:47 3533:32 4783:32 1030:13 59 863 + 27-225-01 GENERAL VISUAL INSPECTION LEFT WING LEADING EDGE FLAP AND SLAT ACTUATORS AND LEFT WING LEADING EDGE FLAP AND SLAT ACTUATION MECHANISMS MOS 27.680 FIRSOASC 6000 REF: BTC 27-225-01-0I AFL 177.97 08-OCT-1999 3709:19 44 6044 2290:41 884 38 74nsufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 72 Of 315 EFTA00619111
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 27-225-02 27.681 27-226-00 (s) GENERAL VISUAL INSPECTION RIGHT WING LEADING EDGE FLAP AND SLAT ACTUATORS AND RIGHT WING LEADING EDGE FLAP AND SLAT ACTUATION MECHANISMS MOS 177.97 HRSAISC 6000 3709:19 REF: BTC 27-225-02-01 AFL 884 DETAILED VISUAL INSPECTION OF ALL EXPOSED PORTIONS OF THE FUGHT CONTROL CABLE RUNS. 08-OCT-1999 44 6044 2290:41 38 PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 27.997 HRS/MSC 219:47 3533:32 REF: See Workcard AFL 59 863 27-228-00 (s) DETAILED VISUAL INSPECTION OF ALL INTERNAL PORTIONS OF THE FLIGHT CONTROL CABLE RUNS PKG PKG 33 MOS 144 35.27 29-AUG-2011 27.998 HRS/MSC 219:47 3533:32 REF: See Workcard AFL 59 863 27-229-00 (s) DETAILED INSPECTION OF INBORAD TRAILING EDGE AFT FLAP DRIVE CABLE PKG PKG 32 .33 MOS 72 35.27 29-AUG-2011 27.018 HRSAISC 219:47 3533:32 REF: See Workcard AFL 59 863 27-230-00 27.999 27-31-11 (I) DETAILED VISUAL INSPECTION OF ALL FLIGHT CONTROL CABLES THAT ME OVER THE CENTER WING SECTION B.S. 540 TO 663.75 AND CABLE WITHIN PILOT'S CONTROL QUADRANT MOS 216 177.97 08-OCT-1999 08-OCT-2017 HRSAISC 3709:19 44 REF: See Workcard AFL 884 38 LEFT ELEVATOR 1158d 183A0101-678 MOS 177.97 08-OCT-1999 55.040 000147 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-11 (2) RIGHT ELEVATOR 183A0102-678 MOS 177.97 08-OCT-1999 55.040 000146 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-14 (I) LEFT ELEVATOR POWER CONTROL UNIT 251A2160-2 MOS 177.97 08-OCT-1999 27.155 0615 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-14 (2) RIGHT ELEVATOR POWER CONTROL UNIT 251A2160-2 MOS 177.97 08-OCT-1999 27.155 0612 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-31 (1) LEFT ELEVATOR TAB 183A8100-1 MOS 177.97 08-OCT-1999 55.050 000145 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-31 (2) RIGHT ELEVATOR TAB 183A8100-2 MOS 177.97 08-OCT-1999 55.050 000149 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 73 Of 315 O CAMP SYSTEMS EFTA00619112
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL ( ENH) AFH LIMIT REMAINING 27-31-34 (1) LEFT ELEVATOR TAB MECHANISM ASSEMBLY PN MOS TSN:0 177.97 08-OCT-1999 SN-UNKNOWN HRSYSASC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-34 (2) RIGHT ELEVATOR TAB MECHANISM ASSEMBLY PN MOS TSN:0 177.97 08-OCT-1999 SN-UNKNOWN HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-37 ELEVATOR FEEL COMPUTER 162700-100 MOS TSOO 167.9 10-AUG-2000 27.690 200 HRSAASC 0/C 3311:19 442 REF: AFL 797 125 27-31-64 AUTOPILOT FEEUCENTERING ASSEMBLY 65C25465-23 MOS 177.97 08-OCT-1999 22.040 1727 HRSYSASC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-67 ELEVATOR FEEL ACTUATOR 65-44503-10 MOS 177.97 08-OCT-1999 27.060 SHL-2913 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-31-94 (1) L/H ELEVATOR FEEL PITOT PROBE RVSM S232N911-6 MOS TSN:0 115.2 0I-JAN-2005 34.500 234607 HRSAISC 0./C TSN:0 1788 1965:18 REF: AFL TSN:0 440 482 27-31-94 (2) Riii ELEVATOR FEEL PITOT PROBE RVSM S232N911-6 MOS TSN:0 115.2 0I-JAN-2005 34.505 234732 HRSAASC 0/C TSN:0 1788 1965:18 REF: AFL TSN:0 440 482 27-32-21 STALL WARNING MODULE 69-75978-1 MOS 177.97 08-OCT-1999 27.315 D02241 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-32-31 (I) CAPTAIN CONTROL COLUMN SHAKER C07202-2 MOS 177.97 08-OCT-1999 27.685 14195 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-32-31 (2) FIRST OFFICER CONTROL COLUMN SHAKER C07202-2 MOS 177.97 08-OCT-1999 27.685 14186 HRSAASC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-32-42(1) NO. I YAW DAMPER MODULE 285A1010-3 MOS 177.97 08-OCT-1999 27.295 D00387 HRSAASC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 74 Of 315 EFTA00619113
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-32-42(2) NO. 2 YAW DAMPER MODULE 285A1010-3 MOS 177.97 08-OCT-1999 27.295 D00388 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-41-11 (I) LEFT HORIZONTAL STABILIZER 001A8001-678 MOS 177.97 08-OCT-1999 55.020 000146 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-41-11 (2) RIGHT HORIZONTAL STABILIZER 011A8002-678 MOS 177.97 08-OCT-1999 55.020 000146 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-41-51 (1) LEFT COLUMN CUTOUT SWITCH 251A4410-1 MOS 177.97 08-OCT-1999 27.115 00176 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-41-51 (2) RIGHT COLUMN CUTOUT SWITCH 251A4430-1 MOS 177.97 08-OCT-1999 27.115 00194 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-41-71 STABILIZER TRIM MOTOR 635560001-02 MOS 177.97 08-OCT-1999 27.700 0343 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-01 FLAP/SLAT ELECTRONIC UNIT 285A1200-1 MOS 177.97 08-OCT-1999 27.710 D00192 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-02 TRAILING EDGE FLAPS BYPASS VALVE AV13J5144 MOS 177.97 08-OCT-1999 27.835 T12652 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-04 TRAILING EDGE FLAP PRIORITY VALVE 67940-2 MOS 177.97 08-OCT-1999 29.310 3327A HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-11 (1) LEFT INBOARD TRAILING EDGE FLAP ASSEMBLY 113A2100-41 MOS 177.97 08-OCT-1999 27.005 K0049 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-11 (2) RIGHT INBOARD TRAILING EDGE FLAP ASSEMBLY 113A2100-42 MOS 177.97 08-OCT-1999 27.005 K0049 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 75 Of 315 O CAMP SYSTEMS EFTA00619114
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT PART/SERIAL INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 27-51-12( ) 27.015 LEFT INBOARD AFT TRAILING EDGE FLAP ASSEMBLY 113A2700-15 MOS D-0096 HRSYMSC O./C REF: AFL TSN:44 TSN:38 177.97 3753 922 08-OCT-1999 44 38 27-51-12(2) RIGHT INBOARD AFT TRAIUNG EDGE FLAP ASSEMBLY 1 I 3A2700-16 MOS 177.97 08-OCT-1999 27.015 D-0098 HRSAISC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-13O) NO. 4 FLAP TRACK CARRIAGE ASSEMBLY PN MOS TSN:0 177.97 08-OCT-1999 SN-UNKNOWN HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-13(2) NO. 5 FLAP TRACK CARRIAGE ASSEMBLY PN MOS TSN:0 177.97 08-OCT-1999 SN-UNKNOWN HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-15O) NO. I FLAP TRACK PN MOS SN-UNKNOWN HRS/MSC REF: AFL 27-51-15(2) NO. 2 FLAP TRACK PN MOS SN-UNKNOWN HRSAiSC REF: AFL 27-51-15(3) NO. 3 FLAP TRACK PN MOS SN-UNKNOWN HRS/MSC REF: AFL 27-51-15(4) NO. 4 FLAP TRACK PN MOS SN-UNKNOWN HRSAISC REF: AFL 27-51-15(5) NO. 5 FLAP TRACK PN MOS SN-UNKNOWN HRSAISC REF: AFL 27-51-15(6) NO. 6 FLAP TRACK PN MOS SN-UNKNOWN HRS/MSC REF: AFL 27-51-15 (7) NO. 7 FLAP TRACK PN MOS SN-UNKNOWN HRS/MSC CHC REF: AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EB7)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 76 Of 315 EFTA00619115
CAMP Ana/no/in Onnesiday Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-51-15(8) NO. 8 FLAP TRACK PN MOS SN-UNKNOWN HRSAISC 0./C REF: AFL 27-51-21 (I) LEFT OUTBOARD TRAILING EDGE FLAP ASSEMBLY 113A3100-7 MOS 177.97 08-OCT-1999 27.020 000150 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-21 (2) RIGHT OUTBOARD TRAILING EDGE FLAP ASSEMBLY 113A3100-8 MOS 177.97 08-OCT-1999 27.020 000149 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-22 (1) LEFT OUTBOARD AFT TRAILING EDGE FLAP ASSEMBLY 1 I 3A3700-7 MOS 177.97 08-OCT-1999 27.025 SN-UNKNOWN HRSYMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-22 (2) RIGHT OUTBOARD AFT TRAILING EDGE FLAP ASSEMBLY 113A37008 MOS 177.97 08-OCT-1999 27.025 000149 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-31 (1) NO. 3 FLAP TRANSMISSION 256A3310-5 MOS 177.97 08-OCT-1999 27.735 0340/3310 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-31 (2) NO. 4 FLAP TRANSMISSION 256A3410-5 MOS 177.97 08-OCT-1999 27.735 0343/3410 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-31 (3) NO. 5 FLAP TRANSMISSION 256A34I0-6 MOS 177.97 08-OCT-1999 27.740 0141/3410 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-31 (4) NO. 6 FLAP TRANSMISSION 256A3310-6 MOS 177.97 08-OCT-I 999 27.740 0360./3310 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-32 (1) NO. 3 FLAP TRANSMISSION BALLSCREW 07325P000-01 MOS 177.97 08-OCT-I 999 27.795 0666 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-32 (2) NO. 4 FLAP TRANSMISSION BALLSCREW 07325P000-01 MOS 177.97 08-OCT-1999 27.795 0612 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 77 Of 315 O CAMP SYSTEMS EFTA00619116
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT PART/SERIAL INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 27-51-32(3) 27.800 NO. 5 FLAP TRANSMISSION BALLSCREW 07325P000-01 MOS 0559 HRS/MSC REF: AFL 0/C TSN:44 TSN:38 177.97 3753 922 08-OCT-1999 44 38 27-51-32(4) NO. 6 FLAP TRANSMISSION BALLSCREW 07325P000-01 MOS 177.97 08-OCT-1999 27.800 0657 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-41 (1) NO. I FLAP TRANSMISSION 256A3110-5 MOS 177.97 08-OCT-1999 27.730 0142,3110 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-41 (2) NO. 2 FLAP TRANSMISSION 256A3210-5 MOS 177.97 08-OCT-1999 27.730 0338/3210 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-41 (3) NO. 7 FLAP TRANSMISSION 256A3210-6 MOS 177.97 08-OCT-1999 27.745 0264/3210 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-41 (4) NO. 8 FLAP TRANSMISSION 256A3110-6 MOS 177.97 08-OCT-1999 27.745 0356/3110 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-42(1) NO. I FLAP TRANSMISSION BALLSCREW 07323P000-01 MOS 177.97 08-OCT-1999 27.790 0257 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-42(2) NO. 2 FLAP TRANSMISSION BALLSCREW 07324P000-01 MOS 177.97 08-OCT-1999 27.790 0363 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-42(3) NO. 7 FLAP TRANSMISSION BALLSCREW 07324P000-01 MOS 177.97 08-OCT-1999 27.805 0362 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-42(4) NO. 8 FLAP TRANSMISSION BALLSCREW 07323P000-01 MOS 177.97 08-OCT-1999 27.805 0309 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-51 FLAP POWER DRIVE UNIT 256A3515-2 MOS 107 07-SEP-2005 27.040 5024 HRS1MSC 0/C 1550:58 2202:21 REF: AFL 381 sal 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 78 Of 315 EFTA00619117
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-51-52 HYDRAULIC FLAP MOTOR 973600 MOS 107 07-SEP-2005 27.070 MX603054 HRSAISC Or/C 1550:58 2202:21 REF: AFL 381 541 27-51-53 ELECTRIC FLAP MOTOR 42217100-3 MOS 107 07-SEP-2005 27.080 1209 HRSAISC Or/C 1550:58 2202:21 REF: AFL 381 541 27-51-55O) LEFT TEE ANGLE FLAP GEARBOX 256A3650-1 MOS 177.97 08-OCT-I 999 27.840 1099 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-55 (2) RIGHT TEE ANGLE FLAP GEARBOX 256A3650-2 MOS 177.97 08-OCT-1999 27.840 1098 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-56O) LEFT WING MAIN LANDING GEAR BEAM ANGLE GEARBOX 256A3640-1 MOS 177.97 08-OCT-1999 27.725 1048 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-56 (2) RIGHT WING MAIN LANDING GEAR BEAM ANGLE GEARBOX 256A3640-2 MOS 177.97 08-OCT-1999 27.725 1051 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-57 0) LEFT WING INBOARD RIB SEAL ANGLE GEARBOX 256A3630-1 MOS 177.97 08-OCT-1999 27.720 1065 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-57 (2) RIGHT WING INBOARD RIB SEAL ANGLE GEARBOX 256A3630-1 MOS 177.97 08-OCT-1999 27.720 1056 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-61 FLAP CONTROL UNIT 256A3550-2 MOS 177.97 08-OCT-I 999 27.705 1093 HRSAISC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-65(1) TRAILING EDGE FLAP CONTROL VALVE 256A3580-1 MOS 177.97 08-OCT-1999 27.035 0178 HRS/MSC Or/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-51-65 (2) FLAP LOAD LIMITER VALVE 881600-1001 MOS 177.97 08-OCT-1999 27.035 19448 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 79 Of 315 O CAMP SYSTEMS EFTA00619118
COW Atiaficaftweidernlar Status Report 737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AR. as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL PART/SERIAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 27-58-01 (1) 27.830 LEFT FLAP POSITION TRANSMITTER 18-1738-10 MOS 0352 HRSIMSC 0/C REF: AFL TSN:44 TSN:38 177.97 08-OCT-1999 3753 44 922 38 27-58-01 (2) RIGHT FLAP POSITION TRANSMITTER 18-1738-10 MOS 177.97 08-OCT-1999 27.830 0103 HRS,MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-58-02 FLAP POSITION INDICATOR 2061-15-1 MOS 177.97 08-OCT-1999 31.050 261 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (1) NO. 1 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.810 1035 HRS,MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (2) NO. 2 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.810 0986 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (3) NO. 3 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.815 1045 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (4) NO. 4 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.815 1037 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (5) NO. 5 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.820 1027 HRS,MSC 0!C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (6) NO. 6 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.820 0979 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (7) NO. 7 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.825 1028 HRS,MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-59-01 (8) NO. 8 FLAP SKEW SENSOR 9000421-2 MOS 177.97 08-OCT-1999 27.825 1032 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time '-Estimated Due (New Requirement) (EFF)-Effective CM 80 Of 315 0 CAMP SYSTEMS EFTA00619119
~In "In. Mr gnad wp' Status Report 737-72UB3 REVISION 21 S/N 29273 (YG006) (VP-B6.1): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) ÅA., LIMIT REMAINING 2741-04 (1) FLIGHT SPOILER SYSTEM NO 3 SPOILER POSITION TRANSMITER PN MOS TSN:0 177.97 08-OCT- I 999 27.851 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-04 (2) FLIGHT SPOILER SYSTEM NO 10 SPOILER POSITION TRANSMITER PN MOS TSN:0 177.97 08-OCT-1999 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (I) NO. 2 SPOILER 113A4200-1 MOS 177.97 08-OCT-1999 27.850 000174 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (2) NO. 3 SPOILER 113A4300-1 MOS 177.97 08-OCT-1999 27.850 000177 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (3) NO. 4 SPOILER 113A4400-1 MOS 177.97 08-OCT-1999 27.855 000169 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (4) NO. 5 SPOILER 113A4500-1 MOS 177.97 08-OCT-1999 27.855 000184 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (5) NO. 8 SPOILER 113A4500-2 MOS 177.97 08-OCT-1999 27.865 000193 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (6) NO. 9 SPOILER 113A4400-2 MOS 177.97 08-OCT-1999 27.865 000180 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (7) NO. 10 SPOILER 113A4300-2 MOS 177.97 08-OCT-1999 27.870 000169 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-11 (8) NO. 11 SPOILER 113A4200-2 MOS 177.97 08-OCT-1999 27.870 000087 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2741-21 SPOILER MIXER 551A1741-4 MOS 177.97 08-OCT-1999 27.455 E0151 HRSIMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task eldste In Inspection Manual (s)-Suppressed RequIrement (EBT)-EstImated Base Time '-EatImated Due (New RequIrement) (EFF)-Effective CM O CAMP SYSTEMS 81 Of 315 EFTA00619120
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-61-31 SPOILER RATIO CHANGER 65-46370-23 MOS 177.97 08-OCT-1999 27.160 E0079 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (1) NO. 2 SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.095 1426 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (2) NO. 3 SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.095 1157 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (3) NO. 4 SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.100 1155 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (4) NO. 5 SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.100 1156 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (5) NO. 8 SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.105 1302 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (6) NO. 9 SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.105 1159 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (7) NO. 10 SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.110 1486 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-61-51 (8) NO. II SPOILER ACTUATOR 251A1240-3 MOS 177.97 08-OCT-1999 27.110 1405 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-12 (I) NO. 6 SPOILER 113A4600-1 MOS 177.97 08-OCT-1999 27.860 000170 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-12(2) NO. 7 SPOILER 113A4600-2 MOS 177.97 08-OCT-1999 27.860 000184 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 82 Of 315 O CAMP SYSTEMS EFTA00619121
CAMP Atkin a p.m Me rim Jar Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-62-21 SPEED BRAKE CONTROL 50179-3A MOS 177.97 08-OCT-1999 27.880 4570 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-31 SPEED BRAKE ACTUATOR R5303M I MOS 177.97 08-OCT-1999 27.885 980626 HRSAiSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-35 AUTO SPEED BRAKE UNIT 65-84209-21 MOS 177.97 08-OCT-1999 27.593 D02282 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-37 SPEEDBRAKE TRANSMITTER PN MOS SN-UNKNOWN HRSAISC 0/C 3753:19 0 REF: AFL 2742-61 GROUND SPOILER INTERLOCK VALVE PN MOS TSN:0 177.97 08-OCT-1999 27.006 SN-UNKNOWN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-61-B GROUND SPOILER INTRELOCK VALVE PROXIMITY SENSOR PN MOS TSN:0 177.97 08-OCT-1999 27.006 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2742-61-C GROUND SPOILER INTERLOCK VALVE PRESSURE SWITCH PN MOS TSN:0 177.97 08-OCT-1999 27.006 SN-UNKNOWN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2742-71 (I) NO. 6 GROUND SPOILER OUTBOARD ACTUATOR 30490 MOS 177.97 08-OCT-1999 27.135 00566 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-71 (2) NO. 6 GROUND SPOILER INBOARD ACTUATOR 30490 MOS 177.97 08-OCT-1999 27.135 00576 HRS,MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-71 (3) NO. 7 GROUND SPOILER INBOARD ACTUATOR 30490 MOS 177.97 08-OCT-1999 27.140 00557 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-62-71 (4) NO. 7 GROUND SPOILER OUTBOARD ACTUATOR 30490 MOS TSN:0 177.97 08-OCT-I999 27.140 00560 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time •-Estimated Due (New Requirement) (EFF)-Effective CM CAMP SYSTEMS 83 Of 315 EFTA00619122
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-62-91 (1) NO. I SPOILER 113A4100-1 MOS 177.97 08-OCT-1999 27.845 000180 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2742-91 (2) NO. 12 SPOILER 113A4100-2 MOS 177.97 08-OCT-1999 27.845 000167 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 2742-94 (1) LEFT OUTBOARD GROUND SPOILER ACTUATOR 65C26864-3 MOS 177.97 08-OCT-I 999 27.125 E-3404 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 2742-94 (2) RIGHT OUTBOARD GROUND SPOILER ACTUATOR 65C26864-3 MOS 177.97 08-OCT-1999 27.125 E-3411 HRSYMSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-11 (1) NO. I LEADING EDGE FLAP ASSEMBLY 114A1110-7 MOS 177.97 08-OCT-1999 27.770 ASTA-160 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-11 (2) NO. 2 LEADING EDGE FLAP ASSEMBLY 114A1220-7 MOS 177.97 08-OCT-1999 27.770 ASTA-159 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-11 (3) NO. 3 LEADING EDGE FLAP ASSEMBLY 114A1220-8 MOS 177.97 08-OCT-1999 27.775 ASTA-157 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-11 (4) NO. 4 LEADING EDGE FLAP ASSEMBLY 114A1110-8 MOS 177.97 08-OCT-1999 27.775 ASTA-157 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-21 (I) NO. I LEADING EDGE SLAT 114A5010-3 MOS 177.97 08-OCT-1999 27.750 000149 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-21 (2) NO. 2 LEADING EDGE SLAT 114A5020-3 MOS 177.97 08-OCT-1999 27.750 000149 HRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-21 (3) NO. 3 LEADING EDGE SLAT 114A5030-3 MOS 177.97 08-OCT-1999 27.755 000149 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 84 Of 315 O CAMP SYSTEMS EFTA00619123
Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 27-81-21 (4) NO. 4 LEADING EDGE SLAT 114A5040-3 MOS 177.97 08-OCT-1999 27.755 000149 HRSAiSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-21 (5) NO. 5 LEADING EDGE SLAT 114A5040-4 MOS 177.97 08-OCT-1999 27.760 000150 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-21 (6) NO. 6 LEADING EDGE SLAT 114A5030-4 MOS 177.97 08-OCT-1999 27.760 000150 FIRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-21 (7) NO. 7 LEADING EDGE SLAT 114A5020-4 MOS 177.97 08-OCT-1999 27.765 000150 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-21 (8) NO. 8 LEADING EDGE SLAT 114A5010-4 MOS 177.97 08-OCT-1999 27.765 000150 HRSAiSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-31 (1) NO. 1 LEADING EDGE FLAP ACTUATOR 382000-1001 MOS 177.97 08-OCT-1999 27.780 0272 FIRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-31 (2) NO. 2 LEADING EDGE FLAP ACTUATOR 382000-1001 MOS 177.97 08-OCT-1999 27.780 0618 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-31 (3) NO. 3 LEADING EDGE FLAP ACTUATOR 382000-1001 MOS 177.97 08-OCT-1999 27.785 0626 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-31 (4) NO. 4 LEADING EDGE FLAP ACTUATOR 382000-1001 MOS 177.97 08-OCT-1999 27.785 0642 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-8141 (1) NO. I LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 177.97 08-OCT-1999 27.890 1927 FIRS/MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-8141 (2) NO. 2 LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 177.97 08-OCT-1999 27.890 2043 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 85 Of 315 O CAMP SYSTEMS EFTA00619124
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL PART/SERIAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 27-81-41 (3) 27.895 NO. 3 LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 2046 HRS/MSC 0/C REF: AFL TSN:44 TSN:38 177.97 08-OCT-1999 3753 44 922 38 27-81-41 (4) NO. 4 LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 177.97 08-OCT-1999 27.895 2033 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-41 (5) NO. 5 LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 177.97 08-OCT-1999 27.900 2031 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-8141 (6) NO. 6 LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 177.97 08-OCT-1999 27.900 2042 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 27-8141 (7) NO. 7 LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 177.97 08-OCT-1999 27.905 2206 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-41 (8) NO. 8 LEADING EDGE SLAT ACTUATOR 381800-1001 MOS 177.97 08-OCT-1999 27.905 2264 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-52(1) LEADING EDGE UCM SHUTOFF VALVE 394100-1001 MOS 177.97 08-OCT-1999 27.030 0337 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-52(2) LEADING EDGE UCM DEPRESS VALVE 394100-1001 MOS 177.97 08-OCT-1999 27.030 0150 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-81 LEADING EDGE FLAP/SLAT CONTROL VALVE 4163DA MOS 177.97 08-OCT-1999 27.031 4635 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 27-81-91 LEADING EDGE STANDBY SHUTOFF VALVE MOTOR AV13J5147 MOS 177.97 08-OCT-1999 29.025 T11993 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 27-83-21 AUTO SLAT VALVE 65C26869-2 MOS 177.97 08-OCT-1999 27.833 FAH-2149 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 86 Of 315 O CAMP SYSTEMS EFTA00619125
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL PART/SERIAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 27-88-11 (1) LEADING EDGE SLAT NO. 1 RETRACT SENSOR PN MOS SN-UNKNOWN HRS/MSC 0/C 3753:19 0 REF: AFL 27-88-11 (2) LEADING EDGE SLAT NO. 2 RETRACT SENSOR PN MOS SN-UNKNOWN HRSAISC 0/C 3753:19 0 REF: AFL 27-88-1I (3) LEADING EDGE SLAT NO. 3 RETRACT SENSOR PN MOS SN-UNKNOWN HRSAISC 0/C 3753:19 0 REF: AFL 27-88-11 (4) LEADING EDGE SLAT NO. 4 RETRACT SENSOR PN MOS SN-UNKNOWN HRSAISC 0/C 3753:19 0 REF: AFL 27-88-11 (5) LEADING EDGE SLAT NO. S RETRACT SENSOR PN MOS SN-UNKNOWN HRS/MSC 0/C 3753:19 0 REF: AFL 27-88-11 (6) LEADING EDGE SLAT NO. 6 RETRACT SENSOR PN MOS SN-UNKNOWN HRSAiSC 0/C 3753:19 0 REF: AFL 271194 ROTARY SWITCH 024807-002 MOS 177.97 08-OCT-1999 27.075 2658 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 271523 AFT TIE OUTBD FLAP 113A3700-8 MOS 177.97 08-OCT-1999 000149 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 272124 INSTRUMENT MODULE 233A3206-3 MOS 177.97 08-OCT-1999 27.085 D00191 HRSAiSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 272153 LEFT ROTARY ACTUATOR W92C MOS 177.97 08-OCT-1999 27.055 C2239 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 87 Of 315 O CAMP SYSTEMS EFTA00619126
CAMP t Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION PART/SERIAL UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 2741-00 (s) PERFORM REPETITIVE GV INSPECTION OF STABILIZER CONTROL CABLE AREA MARKED WITH RED PAINT IN THE AFT/LOWER FUSELAGE REGION. FOR CONDITION DETERIORATION. PKG PKG 1 DAYS 30 55 13-JUN-2014 HRSAISC 3:37 3749:42 REF: AFL 2 920 274197 ENGINE/AUTOBRAKE MODULE 233A2224-3 MOS 177.97 08-OCT-1999 27.081 D00169 HRSAISC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 274198 STABALIZER TRIM DOOR MODULE 69-76436-7 MOS 177.97 08-OCT-1999 27.130 D01714 HRSAISC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 275115 (1) NO. 4 FLAP TRACK FORWARD FITTING ASSEMBLY PN MOS TSN:0 177.97 08-OCT-1999 SN-UNKNOWN HRSAISC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 275115 (2) NO. 5 FLAP TRACK FORWARD FITTING ASSEMBLY PN MOS TSN:0 177.97 08-OCT-1999 SN-UNKNOWN HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 275182 FLAP/SLAT ANNUNCIATOR 90-44201-2 MOS 177.97 08-OCT-1999 27.715 206 HRSAISC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 276211 SPEED BRAKE VALVE 1697EA-1 MOS 177.97 08-OCT-1999 27.875 7698 HRSAISC O./C TSN:44 3753 44 REF: AFL TSN:38 922 38 278331 OUTBOARD AUTO SLAT SOLENOID PN MOS SN-UNKNOWN HRSAISC O/C 3753:19 0 REF: AFL 278332 INBOARD AUTO SLAT SOLENOID PN MOS SN-UNKNOWN HRS/MSC O/C 3753:19 0 REF: AFL 278360 RIGHT YAW CONTROL SENSOR PN MOS SN-UNKNOWN HRSAISC O/C 3753:19 0 REF: AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 88 Of 315 EFTA00619127
CNVIP Asiaticefin emend ay Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 HRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ PART/SERIAL TOTAL TIME COMPLIANCE NEXT DUE MAX (ENH) AFH LIMIT TIME REMAINING 278365 POSITION TRANSMITTER PN MOS SN-UNKNOWN HRS/MSC 0/C 3753:19 0 REF: AFL 278400 RUDDER ACTUATOR PN MOS SN-UNKNOWN FIRS/MSC O/C 3753:19 0 REF: AFL 278405 TRANSMITTER PN MOS SN-UNKNOWN HRSAISC O/C 3753:19 0 REF: AFL 278410 TRANSMITTER PN MOS SN-UNKNOWN FIRS/MSC O/C 3753:19 0 REF: AFL 278415 TRANSMITTER PN MOS SN-UNKNOWN HRS/MSC VC 3753:19 0 REF: AFL 278420 LE CRUISE DEPRESS VALVE PN MOS SN-UNKNOWN HRS/MSC VC 3753:19 0 REF: AFL CHAPTER 28 FUEL 28-00.01 PATS GENERAL VISUAL INSPECTION OF AFS PLACARDS AND DECALS MOS 72 71.5 22-AUG-2008 22-AUG-2014 15E 28.025 HRSAISC 492:31 3260:48 REF: AFL 140 782 28-00-02 PATS INSPECT AFS ELECTRICAL COMPONENTS CONNECTORS AND CABLES FOR CHAFFING. FRAYED LEADS. BENT PINS. CORROSION. CHAFFING AND CONDITION MOS 72 71.5 22-AUG-2008 22-AUG-2014 154 28.045 HRS/MSC 492:31 3260:48 REF: AFL 140 782 + 28-010-00 28.190 GENERAL VISUAL INSPECTION OF THE MAIN AND CENTER FUEL TANK (WING) EXTERNAL LOWER SURFACES INCLUDING TANK VENTS. SUMP DRAIN VALVES. SKIN LAP JOINTS FOR OBVIOUS LEAKS. CONDITION. AND SECURITY REF: EITC 28-010-00-CH MOS HRSAISC 4000 AFL 177.97 08-OCT-1999 3709:19 44 4044 290:41 884 38 74nsufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 89 Of 315 EFTA00619128
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING • 28-020-01 (s) 28.260 + 28-020-02 (s) 28.270 + 28-030-01 (s) 28.340 + 28-030-02 (s) OPERATIONAL CHECK LEFT SURGE TANK RELIEF VALVES PKG 32 .33 MOS 72 HRSAISC REF: EiTC 28-020-01-0( AFL OPERATIONAL CHECK RIGHT SURGE TANK RELIEF VALVES PKG 32 .33 MOS 72 HRSAISC REF: BTC 28-020-02-0( AFL 35.27 219:47 59 PKG 29-AUG-201I 3533:32 863 PKG 35.27 29-AUG-201I 219:47 3533:32 59 863 INSPECT (DETAILED) LEFT SURGE TANK VENT FLAME ARRESTOR FOR CLOGGING. CONDITION. AND SECURITY PKG PKG 32 .33 MOS 72 HRS/MSC REF: BTC 28-030-01-0I AFL 35.27 29-AUG-2017 219:47 3533:32 59 863 INSPECT (DETAILED) RIGHT SURGE TANK VENT FLAME ARRESTOR FOR CLOGGING. CONDITION. AND SECURITY PKG PKG 32 .33 MOS 72 28.350 HRSAISC REF: BTC 28-030-02-0I AFL 35.27 29-AUG-201I 219:47 3533:32 59 863 + 28-040-00 OPERATIONAL CHECK THE CENTER TANK FUEL SCAVENGE SYSTEM (JET PUMP.INDUCED PORT CHECK VALVE. FLOAT VALVE. AND LINE) MOS 177.97 08-OCT-1999 28.360 HRSYMSC 10000 3709:19 44 10044 6290:41 REF: BTC 28-040-00-01 AFL 884 38 28-050-00 OPERATIONAL CHECK OF ENGINE FUEL SUCTION FEED SYSTEM MOS 177.97 08-OCT-1999 28.885 HRSYMSC 7500 3709:19 44 7544 3790:41 REF: BTC 28-050-00-0I AFL 884 38 28-054-00 OPERATIONAL CHECK (BITE) THE FUEL PUMP GFI RELAY MOS 12 9.23 30-OCT-2013 30-OCT-2014 84 E 28.890 HRS/MSC 24:26 3728:53 REF: AFL 11 911 28-056-00 FUNCTIONALLY CHECK THE CENTER TANK FUEL BOOST PUMP POWER FAILED ON PROTECTION SYSTEM MOS 12 9.23 30-OCT-2013 30-OCT-2014 84 E 28.895 HRSAISC 24:26 3728:53 REF: AFL 11 911 28-060-01 (001.0) LEFT FUEL TANK WATER SCAVENGE JET PUMP RESTORE 68E125-9 MOS 177.97 08-OCT-1999 28.650 1433 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 + 28-060-01(001.1) RESTORE LEFT FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK). RESTORE 68E125-9 MOS 143.33 27-AUG-2002 28.380 1433 HRSYMSC 4000 2695:31 1057:48 5057:48 1304:29 REF: EITC 28-060-01-0I AFL 651 271 28-060-02 (001.0) RIGHT FUEL TANK WATER SCAVENGE JET PUMP RESTORE 68E125-9 MOS 177.97 08-OCT-1999 28.650 1266 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 90 Of 315 EFTA00619129
28-060-03 (002.1) CAMP t Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL ( ENH ) AFH LIMIT REMAINING + 28-060-02 (001.1) 28.390 28-060-03 (001.0) RESTORE RIGHT FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK). 68E125-9 1266 REF: BTC 28-060-02-01 MOS HRSAISC 4000 AFL LEFT CENTER FUEL TANK WATER SCAVENGE JET PUMP 68E125-9 28.651 1441 REF: + 28-060-03(001.1) MOS HRSYMSC 0/C TSN:44 AFL TSN:38 RESTORE LEFT CENTER FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK). 68E125-9 MOS 28.065 1441 HRS/MSC 4000 REF: BTC 28-060-03-01 AFL 28-060-03 (002.0) RIGHT CENTER FUEL TANK WATER SCAVENGE JET PUMP 143.33 27-AUG-2002 2695:31 1057:48 651 271 177.97 08-OCT-1999 3753 44 922 38 143.33 27-AUG-2002 2695:31 1057:48 651 271 68E125-9 MOS 177.97 08-OCT-1999 28.651 1265 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 RESTORE RIGHT CENTER FUEL TANK WATER SCAVENGE JET PUMP (WITHOUT DEFUELING THE TANK)." 68E125-9 MOS 143.33 27-AUG-2002 1265 HRS/MSC 4000 2695:31 1057:48 5057:48 1304:29 REF: BTC 28-060-03-01 AFL 651 271 5057:48 5057:48 RESTORE 1304:29 RESTORE RESTORE 1304:29 RESTORE RESTORE + 28-070-00 FUNCTIONAL CHECK (PRESSURE DECAY) THE APU FUEL LINE SHROUD MOS 177.97 08-OCT-1999 28.410 HRSYMSC 12000 3709:19 44 12044 8290:41 REF: BTC 28-070-00-01 AFL 884 38 + 28-080-00 OPERATIONALLY (BITE) CHECK FUEL QUANTITY INDICATING SYSTEM MOS 35.27 29-AUG-2011 28.420 HRS/MSC 6000 219:47 3533:32 9533:32 5780:13 REF: BTC 28-080-00-01 AFL 59 863 28-10-01 PATS FUNCTIONAL CHECK CORE VACUUM CHECK OF INDIVIDUAL AUXILIARY FUEL CELLS 28-10-02 PATS 28-115-00 28.115 + 28-125-00 28.700 MOS 72 177.97 08-OCT-1999 22-AUG-2014 IA HRSAISC 3709:19 44 REF: AFL 884 38 DETAILED INSPECTION AUXILIARY FUEL CELL EXTERIOR STRUCTURE (INCLUDING DOORS/PANELS) FOR DAMAGE AND CONDITION 154 MOS 72 177.97 08-OCT-1999 22-AUG-2014 IA 154 HRS/MSC 3709:19 44 REF: AFL 884 38 FUNCTIONALLY CHECK THE CENTER TANK BOOST PUMP AUTO SHUTOFF SYSTEM MOS 12 9.23 30-OCT-2013 30-OCT-2014 84 E HRSYMSC 24:26 3728:53 REF: AFL 11 911 OPERATIONAL CHECK FUEL SHUT-OFF VALVE BATTERY REF: BTC 28-125-00-01 MOS HRSAiSC 6000 AFL 58.3 28-SEP-2009 375:15 3378:04 9378:04 5624:45 110 812 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 91 Of 315 EFTA00619130
CAMP Isiishca p.m Megn llar" Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 28-13-41 (I) LEFT PRESSURE RELIEF VALVE 2790175-103 MOS 101.17 02-MAR-2006 28.015 6405 HRSAISC 0/C 1243:41 2509:38 REF: AFL 313 609 28-13-41 (2) RIGHT PRESSURE RELIEF VALVE 2790175-103 MOS 101.17 02-MAR-2006 28.015 9712 HRSAISC 1243:41 2509:38 REF: AFL 313 609 28-130-00 (001.0) EMERGENCY FUEL SHUTOFF BATTERY S283W008-3 MOS TSN:0 58.3 28-SEP-2009 28.710 4363 HRS/MSC 0/C TSN:0 375 3378:04 REF: AFL TSN:0 110 812 + 28-130-00 (001.1) REPLACE EMERGENCY FUEL SHUTOFF BATTERY S283W008-3 MOS 84 TSI:10 58.3 28-SEP-2009 26-NOV-2015 M 476d 28.710 4363 HRSAISC 375:15 3378:04 REF: BTC 28-130-00-CH AFL 110 812 28-10-01 PATS FUNCTIONAL CHECK OF THE FORWARD AND AFT SUMP DRAIN UNE MOS 177.97 08-OCT-1999 HRSAISC 4009 3709:19 44 4044 290:41 REF: AFL 884 38 28-100-00 DETAILED INSPECTION IN-TANK TUBING AND EQUIPMENT STATIC GROUND STRAPS AND CLAMPS FOR CONDITION. SFAR SECURITY AND DEGRADATION (SFAR 88) MOS 120 19.87 11-DEC-2012 11-DEC-2022 30480 28.760 HRSYMSC REF: See Workcard AFL 28-150-00 (01) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) OF THE EQUIPMENT FAULT CURRENT GROUND STRAP (S). SFAR LEFT CENTER SECTION WING BOX (SFAR 88) MOS 72 9.23 30-OCT-2013 30-OCT-2019 1910d 28.730 HRSYMSC 24:26 3728:53 REF: BTC 28-150-004N AFL 11 911 28-150-00 (02) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) OF THE EQUIPMENT FAULT CURRENT GROUND STRAP (S). SFAR RIGHT CENTER SECTION WING BOX (SFAR 88) MOS 72 9.23 30-OCT-2013 30-OCT-2019 1910d 28.740 HRSYMSC 24:26 3728:53 REF: BTC 28-150-00-02 AFL 11 911 28-160-00 FUNCTIONAL CHECK (RESISTANCE MEASUREMENT) THE BONDING RESISTANCE BETWEEN THE APU DC FUEL SFAR PUMP MOTOR BONDING STRAP (IF APU DC FUEL PUMP INSTALLED). (SFAR 88 MOS 72 9.23 30-OCT-2013 30-OCT-2019 1910d 28.750 HRS/MSC 24:26 3728:53 REF: BTC 28-160-00-01 AFL 11 911 28-170-00 DETAILED VISUAL INSPECTION OF THE IN-TANK FOIS EXPOSED ELECTRICAL WIRING INTERCONNECTION SYSTEM SFAR (EWIS) AND EWIS SUPPORT FOR DAMAGE. ADEQUATE SEPERATION WITH STRUCTURE AND PROPER SECURITY (SFAR 88) (EZAP) MOS 120 19.87 11-DEC-2012 11-DEC-2022 3048 d 28.770 HRSAISC REF: See Workcard AFL 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 92 Of 315 EFTA00619131
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 28-171-00 DETAIL INSPECTION OF THE IN-TANK FOIS COMPONENTS FOR CHAFFING. RUBBING. ADEQUATE SEPARATION AND SFAR CONDITION FOR SECURITY (SFAR 88) MOS 120 58.3 28-SEP-2009 28-SEP-2019 1878d 28.910 HRSAiSC 375:15 3378:04 REF: See Workcard AFL 110 812 28-173-00 FUNCTIONALLY CHECK (RESISTANCE MEASURE) OUT TANK FOIS WIRE BUNDLE LIGHTNING SHIELD TO GROUND SFAR TERMINATION (SFAR 88) MOS 120 58.3 28-SEP-2CO9 28SEP-2019 1878 d 28.915 HRSYSASC 375:15 3378:04 REF: BTC 28-173-004N AFL 110 812 28-20-01 PATS (s) OPERATIONAL CHECK OF THE AUXILIARY FUEL CONTROL UNIT PKG PKG 12 .31 .32 .33 MOS 12 12.77 14-JUL-2013 28.075 HRSAASC 27:50 3725:29 REF: AFL 13 909 28-20-02 PATS FUNCTIONAL CHECK OF THE AUXILIARY FLOAT SWITCHES BY REMOVING FROM MASTER CELL AND VERIFY OPERATION WITH OHMMETER. (FS I.FS2.FS3.FS51. FS52.FS53) 28.085 28-20-02-01 PATS MOS 72 71.5 HRSAISC 492:31 REF: AFL 140 FUNCTIONAL CHECK OF THE CENTER WING TANK FLOAT SWITCHES BY REMOVING FROM CENTER WING TANK (CWT) AND VERIFY OPERATION WITH OHMMETER (FS4IFS5 OR FSWFS7) 22-AUG-2008 3260:48 782 22-AUG-2014 15d MOS 72 71.5 22-AUG-2008 22-AUG-2014 15d 28.086 HRSAISC 492:31 3260:48 REF: AFL 140 782 28-20-03 PATS (s) DISCARD (FWD & AFT) FILL AND VENT/TRANSFER HOSE ASSEMBLIES PKG PKG 33 MOS 144 35.27 29-AUG-2011 28.095 HRSYSASC 219:47 3533:32 REF: AFL 59 863 28-20-04 PATS (s) RESTORE CABIN AIR FILTERS (S) BY CLEANING OR REPLACEMENT (F3.F53) PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 28.105 HRSAASC 219:47 3533:32 REF: AFL 59 863 28-20-05 PATS (s) RESTORE BLEED AIR FILTERS (S) BY CLEANING OR REPLACEMENT. (FI.F2. F51. AND F52) PKG PKG 31 .32 .33 MOS 36 35.27 29-AUG-2011 28.125 HRSAISC 219:47 3533:32 REF: AFL 59 863 28-20-06 PATS GENERAL VISUAL INSPECTION OF THE AUXILIARY FUEL SYSTEM CELL INTERNAL HORIZONTAL AND VERTICAL STRUCTURAL TUBES AND ALL ATTACHMENTS FOR CRACKS AND LOOSE FASTNERS. MOS 72 177.97 08-OCT-1999 22-AUG-2014 PA 150 HRSAASC 3709:19 44 REF: AFL 884 38 28-201-00(s) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) THE BONDING RESISTANCE BETWEEN THE HYDRAULIC PKG SFAR LINE FITTING AT FUEL TANK WALL PENETRATRATIONS AND THE ADJOINING STRUCTURE (SFAR 88) PKG 33 MOS 144 35.27 29-AUG-2011 28.920 HRSAASC 219:47 3533:32 REF: BTC 28-201-00-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 93 Of 315 EFTA00619132
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX PART/SERIAL ( ENH ) AFH LIMIT TIME REMAINING 28-204-00 (s) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) THE BONDING BETWEEN THE LOWER AIR VENT STACK PKG SFAR AND THE DOOR STRUCTURE (SFAR 88) PKG 33 MOS 144 35.27 29-AUG-2011 28.925 HRSAiSC 219:47 3533:32 REF: BTC 28-204-00-01 AFL 59 863 28-205-00 28.930 FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) THE BONDING BETWEEN THE PRESSURE RELIEF VALVE AND THE STRUCTURE (SFAR 88) MOS 144 35.27 HRSYMSC 219:47 REF: BTC 28-205-00-01 AFL 59 29-AUG-201I 29-AUG-2023 3309d 3533:32 863 SFAR 28-207-00 (s) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) THE BONDING OF THE FUELING SHUTOFF VALVE PKG SFAR ACTUATOR (SOLENIOD) TO THE ADJOINING STRUCTURE (SFAR 88) PKG 33 MOS 144 35.27 29-AUG-201I 28.935 HRSYMSC 219:47 3533:32 REF: BTC 28-207-00-01 AFL 59 863 28-208-00 (s) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) THE BONDING BETWEEN THE FUELING RECEPTACLE PKG SFAR (MANIFOLD) AND THE STRUCTURE (SFAR 88) PKG 33 MOS 144 35.27 29-AUG-2011 28.940 HRSAiSC 219:47 3533:32 REF: BTC 28-208-00-01 AFL 59 863 28-21-21 REFUEL MANIFOLD 2670150-7 MOS 177.97 08-OCT-I 999 28.010 3415 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-21-71 (1) LEFT TANK FUELING FLOAT SWITCH PN MOS TSN:0 177.97 08-OCT-I 999 28.011 SN-UNKNOWN HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-21-71 (2) CENTER TANK FUELING FLOAT SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.011 SN-UNKNOWN HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-21-71 (3) RIGHT TANK FUELING FLOAT SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.011 SN-UNKNOWN HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-211-00 (s) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) THE BONDING BETWEEN MOTOR OPERATED VALVE PKG SFAR ACTUATOR AND ADJOINING STRUCTURE (SFAR 88) PKG 33 MOS 144 35.27 29-AUG-2011 28.945 HRS/MSC 219:47 3533:32 REF: BTC 28-211-00-02 AFL 59 863 28-213-00 (s) FUNCTIONALLY CHECK (RESISTANCE MEASUREMENT) THE BONDING RESISTANCE BETWEEN THE APU SHUTOFF PKG SFAR VALVE ACTUATOR AND ADJOINING STRUCTURE (SFAR 88) PKG 33 MOS 144 35.27 29-AUG-2011 28.950 HRS/MSC 219:47 3533:32 REF: BTC 28-213-00-01 AFL 59 863 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estlmated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 94 Of 315 EFTA00619133
CNVIP Asiaticefin Annend Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 28-22-11 (1) LEFT FUEL TANK SPAR VALVE 123334D2 MOS 35.27 29-AUG-201I 28.550 123153 HRSYMSC 0./C 219:47 3533:32 REF: AFL 59 863 28-22-11 (2) LEFT FUEL TANK SPAR VALVE ACTUATOR MA20A1001-1 MOS 177.97 08-OCT-1999 28.561 125123 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-22-11 (3) RIGHT FUEL TANK SPAR VALVE 123334D2 MOS 35.27 29-AUG-201I 28.550 123163 HRS/MSC 0/C 219:47 3533:32 REF: AFL 59 863 28-22-11 (4) RIGHT FUEL TANK SPAR VALVE ACTUATOR MA20A1001-1 MOS 177.97 08-OCT-1999 28.561 125126 HRSYMSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-22-15 FUEL FEED MANIFOLD AND COUPLINGS PN MOS TSN:0 177.97 08-OCT-1999 28.009 SN-UNKNOWN HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-22-16 SCAVENGE FLOAT VALVE 2910024 MOS 177.97 08-OCT-1999 28.590 0987 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-22-17 FUEL SCAVENGE JET PUMP 810E102 MOS 177.97 08-OCT-1999 28.600 0518 HRS/MSC VC TSN:44 3753 44 REF: AFL TSN:38 922 38 28-22-21 (I) ENGINE FUEL CROSSFEED VALVE 123334D2 MOS 35.27 29-AUG-201I 28.560 125920 HRSYMSC 0/C 219:47 3533:32 REF: AFL 59 863 28-22-21 (2) ENGINE FUEL CROSSFEED VALVE ACTUATOR MA20A1001-1 MOS 177.97 08-OCT-1999 28.560 RT00218 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-22-41 (I) NO. I FUEL TANK FORWARD BOOST PUMP-MOTOR 60-755100-4 MOS 143.33 27-AUG-2002 28.610 89817145 HRS/MSC 0/C 2695:31 1057:48 REF: AFL 651 271 28-22-41 (2) NO. I FUEL TANK AFT BOOST PUMP-MOTOR 60-755100-4 MOS 143.33 27-AUG-2002 28.615 69816518 HRSAISC 0./C 2695:31 1057:48 REF: AFL 651 271 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 95 Of 315 EFTA00619134
Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT PART/SERIAL INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME (ENH) AFH LIMIT REMAINING 28-2241 (3) NO. 2 FUEL TANK FORWARD BOOST PUMP-MOTOR 60-755100-4 MOS 143.33 27-AUG-2002 28.620 69816549 HRSAISC 0./C 2695:31 1057:48 REF: AFL 651 271 28-2241 (4) NO. 2 FUEL TANK AFT BOOST PUMP-MOTOR 60-755100-4 MOS 143.33 27-AUG-2002 28.625 89817140 HRSAISC 0./C 2695:31 1057:48 REF: AFL 651 271 28-2241 (5) CENTER FUEL TANK LEFT OVERRIDE PUMP-MOTOR 60-989100-4 MOS 143.33 27-AUG-2002 28.630 109802347 HRS/MSC 0/C 2695:31 1057:48 REF: AFL 651 271 28-2241 (6) CENTER FUEL TANK RIGHT OVERRIDE PUMP-MOTOR 60-989100-4 MOS 155.33 27-AUG-2001 28.635 89802251 HRSAISC 0/C 2695:31 1057:48 REF: AFL 651 271 28-25-01 APU FUEL PUMP 218387 MOS 177.97 08-OCT-1999 28.640 2877 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-25-02 (1) APU FUEL SHUTOFF VALVE AV16E1209D MOS 177.97 08-OCT-1999 T28156 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-25-02 (2) APU FUEL SHUTOFF VALVE ACTUATOR AV16E1209D MOS TSN:0 177.97 08-OCT-1999 T28156 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-26-11 (I) MANUAL DEFUEL ACTUATOR 1253290 MOS 177.97 08-OCT-1999 28.580 T20223 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-26-11 (2) DEFUEL VALVE 123334D2 MOS 35.27 29-AUG-201I 28.165 723157 HRSAISC 0./C 219:47 3533:32 REF: AFL 59 863 28-01-21 (01) NO. I FUEL TANK COMPENSATOR 20200-01 MOS 177.97 08-OCT-1999 28.680 648 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-01-21 (02) CENTER FUEL TANK COMPENSATOR 20202-01 MOS 177.97 08-OCT-1999 28.680 602 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 96 Of 315 EFTA00619135
CAMP Atishca p.m Megna Jar Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL PART/SERIAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE (ENH) AFH MAX TIME LIMIT REMAINING 28-41-21 (03) 28.680 28-41-21 (04) 28.030 NO. 2 FUEL TANK COMPENSATOR 20200-01 MOS 647 HRS/MSC 0/C REF: AFL LEFT WING W/S 484.5 TANK UNIT 20200-0104 MOS 420 HRSYMSC REF: AFL TSN:44 TSN:38 TSN:44 TSN:38 177.97 08-OCT-1999 3753 44 922 38 177.97 08-OCT-1999 3753 44 922 38 28-41-21 (05) RIGHT WING W/S 484.5 TANK UNIT 20200-0104 MOS 177.97 08-OCT-1999 28.030 409 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (06) LEFT WING W/S 537.5 TANK UNIT 20200-0103 MOS 177.97 08-OCT-1999 28.040 400 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (07) RIGHT WING W/S 537.5 TANK UNIT 20200-0103 MOS 177.97 08-OCT-1999 28.040 407 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (08) LEFT WING WS 228.25 TANK UNIT 20200-0212 MOS 177.97 08-OCT-1999 28.050 422 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (09) RIGHT WING WA 228.25 TANK UNIT 20200-0212 MOS 177.97 08-OCT-1999 28.050 421 HRS/MSC OM TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (10) LEFT WING WS 253.0 TANK UNIT 20200-0210 MOS 177.97 08-OCT-1999 28.060 427 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (II) RIGHT WING W/S 253.0 TANK UNIT 20200-0210 MOS 177.97 08-OCT-1999 28.060 429 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (12) LEFT WING W/S 277.5 TANK UNIT 20200-0211 MOS 177.97 08-OCT-1999 28.070 445 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (13) RIGHT WING W/S 277.5 TANK UNIT 20200-0211 MOS 177.97 08-OCT-1999 28.070 430 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 97 Of 315 O CAMP SYSTEMS EFTA00619136
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 28-41-21 (14) LEFT WING WIS 301.5 TANK UNIT 20200-0209 MOS 177.97 08-OCT-1999 28.080 425 HRS1MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (15) RIGHT WING W/S 301.5 TANK UNIT 20200-0209 MOS 177.97 08-OCT-1999 28.080 463 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (16) LEFT WING WS 325.5 TANK UNIT 20200-0207 MOS 177.97 08-OCT-I 999 28.090 438 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (17) RIGHT WING W/S 325.5 TANK UNIT 20200-0207 MOS 177.97 08-OCT-1999 28.090 366 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (18) LEFT WING WS 352.0 TANK UNIT 20200-0208 MOS 177.97 08-OCT-1999 28.100 452 FIRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (19) RIGHT WING W/S 352.0 TANK UNIT 20200-0208 MOS 177.97 08-OCT-1999 28.100 440 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (20) LEFT WING WIS 378.5 TANK UNIT 20200-0206 MOS 177.97 08-OCT-1999 28.110 398 HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (21) RIGHT WING W/S 378.5 TANK UNIT 20200-0206 MOS 177.97 08-OCT-1999 28.110 418 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (22) LEFT WING WS 431.5 TANK UNIT 20200-0205 MOS 177.97 08-OCT-I 999 28.120 433 HRSAISC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (23) RIGHT WING W/S 431.5 TANK UNIT 20200-0205 MOS 177.97 08-OCT-I 999 28.120 424 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (24) LEFT WING WS 590.5 TANK UNIT 20200-0202 MOS 177.97 08-OCT-1999 28.130 791 HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM 98 Of 315 O CAMP SYSTEMS EFTA00619137
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Report Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 28-41-21 (25) LEFT WING W/S 617.0 TANK UNIT 20200-0202 MOS 177.97 08-OCT-1999 28.140 804 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (26) RIGHT WING W/S 617.0 TANK UNIT 20200-0202 MOS 177.97 08-OCT-1999 28.140 792 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (27) RIGHT WING W/S 590.5 TANK UNIT 20200-0202 MOS 177.97 08-OCT-I 999 28.130 797 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (28) LEFT WING WS 202.0 TANK UNIT 20200-0213 MOS 177.97 08-OCT-1999 28.160 504 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-21 (29) RIGHT WING W/S 202.0 TANK UNIT 20200-0213 MOS 177.97 08-OCT-1999 28.160 531 HRSAISC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-42(1) NO. I TANK FUEL QUANITY INDICATING SYSTEM SPAR PENETRATION CONNECTOR PN MOS TSN:0 177.97 08-OCT-1999 28.008 SN-UNKNOWN FIRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-42 (2) NO. 2 TANK FUEL QUANTITY INDICATING SYSTEM SPAR PENETRATION CONNECTOR PN MOS TSN:0 177.97 08-OCT-1999 28.008 SN-UNKNOWN HRS1MSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-61 (1) NO. I TANK REFUEL PANEL FUEL QUANTITY INDICATOR 10037-0770 MOS 177.97 08-OCT-1999 28.655 0069 HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-61 (2) CENTER TANK REFUEL PANEL FUEL QUANTITY INDICATOR 10037-0770 MOS 177.97 08-OCT-I 999 28.655 0158 HRSAISC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-61 (3) NO. 2 TANK REFUEL PANEL FUEL QUANTITY INDICATOR 10037-0770 MOS 177.97 08-OCT-I 999 28.655 0159 HRS1MSC GM TSN:44 3753 44 REF: AFL TSN:38 922 38 28-41-81 FUEL QUANTITY PROCESSOR 30128-51 MOS 177.97 08-OCT-1999 28.670 0107 HRS1MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 99 Of 315 EFTA00619138
CAMP A.ati gap.. M.a...,d.p Status Report 737-72U83 REVISION 21 S/N 29273 (YG006) (VP-883): 3753:19 NRS, 922 AFL as of 30-3un-2014 Owner/Operator: PICTON II LTD. Re rt Date: 07-AUG-2014 TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ TOTAL TIME COMPLIANCE NEXT DUE MAX TIME PART/SERIAL (ENH) AFH LIMIT REMAINING 28-42-11 (1) LEFT WING AFT FUEL BOOST PUMP PRESSURE SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.005 SN-UNKNOWN HRSAiSC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-42-11 (2) LEFT WING FORWARD FUEL BOOST PUMP PRESSURE SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.005 SN-UNKNOWN HRSAISC 0./C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-42-11 (3) LEFT WING CENTER FUEL BOOST PUMP PRESSURE SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.005 SN-UNKNOWN HRS/MSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-42-11 (4) RIGHT WING AFT FUEL BOOST PUMP PRESSURE SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.006 SN-UNKNOWN HRSAiSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-42-11 (5) RIGHT WING FORWARD FUEL BOOST PUMP PRESSURE SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.006 SN-UNKNOWN HRSAiSC 0/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-42-11 (6) RIGHT WING CENTER FUEL BOOST PUMP PRESSURE SWITCH PN MOS TSN:0 177.97 08-OCT-1999 28.006 SN-UNKNOWN HRS/MSC O/C TSN:44 3753 44 REF: AFL TSN:38 922 38 28-AWL-0 I DETAILED INSPECTION OF THE WIRE BUNDLES ROUTED ON MAIN DECK OVER THE CENTER FUEL TANK AND UNDER THE MAIN DECK FLOOR BOARDS PER AMM 28-11-00 ALI MOS 120 58.3 28-SEP-2009 28-SEP-2019 1878d 28.210 HRSAISC 375:15 3378:04 REF: BTC 28-200-00-01 AFL 110 812 28-AWL-01 PATS DETAILED INSPECTION OF THE CRITICAL WIRE HARNESS SEPARATION. BRACKETS. CLAMPS. SHIELDING. SHIELDING TERMINATION POINTS. DIELECTRIC SLEEVING. AND ROUTING (EWIS) MOS 72 71.5 22-AUG-2008 22-AUG-2014 ALI 154 28.146 HRS/MSC 492:31 3260:48 REF: AFL 140 782 28-AWL-0 I-05 PATS INSPECT THE CELL INTERIOR TO ENSURE FOREIGN OBJECTS DO NOT REMAIN IN THE CELL MOS 177.97 08-OCT-1999 CDCCL HRS/MSC A/R 3709:19 44 REF: AFL 884 38 28-AWL-0 I -06 PATS INSPECT THE MASTER FUEL CELL DRY BAY OR CENTER WING TANK MINI DRY BAYS FOR PRESENCE OF FUEL OR CDCCL FUEL VAPOR. MOS 177.97 08-OCT-1999 HRSAISC AIR 3709:19 44 REF: AFL 884 38 7-Insufficient Information +-Task exists In Inspection Manual (s)-Suppressed Requirement (EBT)-EstImated Base Time *-Estimated Due (New Requirement) (EFF)-Effective CM O CAMP SYSTEMS 100 Of 315 EFTA00619139