3
Shared Docs
3
Same-Page
3 / 3
Mentions
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
70.400 22 30 00 Replace Kitchen Sink and Bath Fixtures $ 29,850 23 30 00 Wall A/C Units - Allowance $ 16,000 26 00 00 Replace Receptacles. Switch Plates $ 7,000 26 50 00 Lighting Installation $ 11.350 Subtotal $ 624,742 Overhead/Profit (17%) $ 104.300 Construction Total $ 729,042 EFTA_R1
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
70.400 22 30 00 Replace Kitchen Sink and Bath Fixtures $ 29,850 23 30 00 Wall A/C Units - Allowance $ 16,000 26 00 00 Replace Receptacles. Switch Plates $ 7,000 26 50 00 Lighting Installation $ 11,350 Subtotal $ 624,742 Overhead/Profit (17%) $ 104.300 Construction Total $ 729,042 EFTA_R1
00 Plaster and Gypsum Board $ 2,000 09 30 00 Stone and Tile - Allowance $ 83.122 09 60 00 Sand,
70.400 22 30 00 Replace Kitchen Sink and Bath Fixtures S 29,850 23 30 00 Wall A/C Units - Allowance $ 16,000 26 00 00 Replace Receptacles. Switch Plates $ 7,000 26 50 00 Lighting Installation $ 11.350 Subtotal $ 624,742 Overhead/Profit (17%) $ 104.300 Construction Total $ 729,042 EFTA_R1
Entities connected to both Oliver Stone and Switch Plates
Bath Fixtures
ORGANIZATIONArchitectural Woodwork
ORGANIZATIONCloset Doors - Allowance
ORGANIZATIONPlaster and Gypsum Board
ORGANIZATIONParquet Floors
ORGANIZATIONCalifornia Closets - Allowance
ORGANIZATIONCNY Construction Management, Inc.
ORGANIZATIONGeneral Contractors / Construction Managers
ORGANIZATIONTerrace Decking
ORGANIZATIONOPENINGS
ORGANIZATIONIIVAC
ORGANIZATIONCatena Carty
ORGANIZATIONSlone Camtettap
PERSONINWPAL
ORGANIZATION